DC
/

Unnamed data center

OperatingUnclassifiedBuildingWashoe County, Nevada
10% profile completeness
11 claims from 5 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
89,700 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
NV Energy · None (non-RTO region)
Substation: Apple Data Center (120 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Unnamed data center
  2. substation
    Apple Data Center (120 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.36 km away. Proximity does not establish that it serves the site.
  3. transmission
    345 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.46 km away). Not confirmed as the supply path.
  4. utility
    NV Energy[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    None (non-RTO region)[3]
    Service territoryLikely
    Balancing authority: NEVP
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
39.56750, -119.54321
County
Washoe County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
None (non-RTO region)[3]Likelyderived

Outside all ISO/RTO footprints; balancing authority shown separately.

Balancing authority
NEVP[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Apple Data Center (120 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.4 km[1]Likelyderived
Highest-voltage line nearby
345 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.04¢/kWh[4]Confirmed

Nevada statewide average, July 2026.

State avg. commercial price
9.72¢/kWh[4]Confirmed

Nevada statewide average, July 2026.

Generation within 50 km
1.33 GW[5]Confirmedderived

21 EIA-reported plants within 50 km.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
120 kV line · NV EnergyTransmission line0.37 km120 kV[1]
345 kV line · NV EnergyTransmission line0.46 km345 kV[1]
125 kV line · NV EnergyTransmission line1.22 km125 kV[1]
Tracy · Sierra Pacific Power CoPower plant (Natural Gas)1.7 km954 MW[5]
Turquoise Nevada, LLC · Greenbacker Renewable Energy CorporationPower plant (Solar)1.8 km60 MW[5]
Western 102 Power Plant · Nevada Gold MinesPower plant (Natural Gas)2.9 km117 MW[5]
Steamboat II · Steamboat Development CorpPower plant (Geothermal)25.9 km16 MW[5]
Galena 3 Geothermal Power Plant · Ormat Nevada IncPower plant (Geothermal)26.6 km20 MW[5]
Richard Burdette Geothermal · Ormat Nevada IncPower plant (Geothermal)26.7 km20 MW[5]
Steamboat Hills LP · Ormat Nevada IncPower plant (Geothermal)29.2 km27 MW[5]
Patua Acquisition Project, LLC · Patua Acquisition Company, LLCPower plant (Geothermal)40.3 km41 MW[5]
Apple Data Center · NV EnergySubstation0.36 km120 kV[1]
Unnamed substationSubstation1.22 km120 kV[1]
West Tracy SubstationSubstation1.38 km345 kV[1]
Newton Substation · NV EnergySubstation1.39 km120 kV[1]
NV Energy substation · NV EnergySubstation1.82 km120 kV[1]
NV Energy substation · NV EnergySubstation2.14 km345 kV[1]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
89,700 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

11
FieldValueSourceConfidenceAs ofStatus
StatusOperating[1] derivedUnverified2026-09-27Shown
UtilityNV Energyterritory 17166: SIERRA PACIFIC POWER CO (INVESTOR OWNED, NEVADA ENERGY)[2] derivedLikely2022Shown
ISO / RTONone (non-RTO region)[3] derivedLikely—Shown
Balancing authorityNEVP[2] derivedLikely—Shown
Nearest mapped substationApple Data Center (120 kV)way/700974840[1] derivedLikely2026-09-28Shown
Distance to substation0.4 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby345 kV[1] derivedLikely2026-09-28Shown
State avg. industrial price10.04¢/kWh[4] Confirmed2026-07Shown
State avg. commercial price9.72¢/kWh[4] Confirmed2026-07Shown
Generation within 50 km1.33 GW[5] derivedConfirmed202502Shown
Building footprint89,700 sq ft[1] derivedLikely2026-09-27Shown