DC
/

Nevada

Facilities
41
2 campuses
Power online
214 MW
1 sites reporting
Under construction
175 MW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
1
214 MW online · 175 MW pipeline
AI compute
0.13M
H100-equivalents (est.)
Capital (reported + est.)
$6.1B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 10.04¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW100 MW200 MW300 MW400 MW202420252026202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2027

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced613 MW
  • Interconnection requests—
  • Contracted / approved—
  • Under construction175 MW
  • Operational214 MW

224 MW announced at 1 site has no grid, construction or operating record yet.

Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented
Verified operating: 1Announced only: 1Unverified: 39

Interconnection queues

Active requests to connect to the grid (CAISO). Requests are applications, not commitments — most never get built.

Generation seeking interconnection7.39 GW · 23 requests
Solar + storage 6.42 GWStorage 927 MW

Markets

Click through to drill down

Online Under construction + planned
NameFacilitiesOnlinePipeline
Reno / Tahoe Reno Industrial18214 MW175 MW
Las Vegas23——

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned

None identified.

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • None (non-RTO region)214 MW + 175 MW · 41 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
Google Storey CountyOperating + expanding214 MW175 MW

Facilities by status

  • Operating39
  • Operating + expanding1
  • Unknown1