Unnamed data center
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityUnnamed data center
- →substationApple Data Center (120 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.26 km away. Proximity does not establish that it serves the site.
- →transmission345 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.43 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
- Tracy (Natural Gas, 954 MW) is 1.3 km away[5]EIA plant within 1.5 km; proximity does not establish that it supplies the facilityNatural gasCo-located954 MWUnverified
- Turquoise Nevada, LLC (Solar, 60 MW) is 1.2 km away[5]EIA plant within 1.5 km; proximity does not establish that it supplies the facilitySolarCo-located60 MWUnverified
Location & imagery
Mapped outline- Coordinates
- 39.57005, -119.53709
- County
- Washoe County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Nevada statewide average, July 2026.
- State avg. commercial price
Nevada statewide average, July 2026.
- Generation within 50 km
21 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 120 kV line · NV Energy | Transmission line | 0.14 km | 120 kV | [1] |
| 345 kV line · NV Energy | Transmission line | 0.43 km | 345 kV | [1] |
| 125 kV line · NV Energy | Transmission line | 1.52 km | 125 kV | [1] |
| Turquoise Nevada, LLC · Greenbacker Renewable Energy Corporation | Power plant (Solar) | 1.2 km | 60 MW | [5] |
| Tracy · Sierra Pacific Power Co | Power plant (Natural Gas) | 1.3 km | 954 MW | [5] |
| Western 102 Power Plant · Nevada Gold Mines | Power plant (Natural Gas) | 2.5 km | 117 MW | [5] |
| Steamboat II · Steamboat Development Corp | Power plant (Geothermal) | 26.5 km | 16 MW | [5] |
| Galena 3 Geothermal Power Plant · Ormat Nevada Inc | Power plant (Geothermal) | 27.1 km | 20 MW | [5] |
| Richard Burdette Geothermal · Ormat Nevada Inc | Power plant (Geothermal) | 27.3 km | 20 MW | [5] |
| Steamboat Hills LP · Ormat Nevada Inc | Power plant (Geothermal) | 29.7 km | 27 MW | [5] |
| Patua Acquisition Project, LLC · Patua Acquisition Company, LLC | Power plant (Geothermal) | 39.8 km | 41 MW | [5] |
| Apple Data Center · NV Energy | Substation | 0.26 km | 120 kV | [1] |
| Newton Substation · NV Energy | Substation | 0.81 km | 120 kV | [1] |
| West Tracy Substation | Substation | 1.17 km | 345 kV | [1] |
| NV Energy substation · NV Energy | Substation | 1.42 km | 120 kV | [1] |
| Unnamed substation | Substation | 1.49 km | 120 kV | [1] |
| NV Energy substation · NV Energy | Substation | 1.74 km | 345 kV | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
11| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Utility | NV Energyterritory 17166: SIERRA PACIFIC POWER CO (INVESTOR OWNED, NEVADA ENERGY) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | NEVP | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Apple Data Center (120 kV)way/700974840 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.3 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 10.04¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 9.72¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.33 GW | [5] derived | Confirmed | 202502 | Shown |
| Building footprint | 89,900 sq ft | [1] derived | Likely | 2026-09-27 | Shown |