VISA
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityVISA
- →substationNot identifiedUnknownUnverifiedNo substation mapped within 3 km and none named in filings.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilityCommonwealth Edison (ComEd)[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 42.21674, -87.95304
- Address
- County
- Lake County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- State avg. industrial price
Illinois statewide average, July 2026.
- State avg. commercial price
Illinois statewide average, July 2026.
- Generation within 50 km
44 EIA-reported plants within 50 km.
- Generation queued in county
5 active generation interconnection requests in Lake County: Storage 1,397 MW, Solar 658 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Winnetka · Village of Winnetka - (IL) | Power plant (Natural Gas) | 21.5 km | 33 MW | [6] |
| Waukegan · Midwest Generations EME LLC | Power plant (Petroleum) | 21.8 km | 108 MW | [6] |
| Mrp Rocky Road LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 27.3 km | 336 MW | [6] |
| Zion Energy Center · Zion Energy LLC | Power plant (Natural Gas) | 29.4 km | 478 MW | [6] |
| Mrp Elgin LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 34 km | 489 MW | [6] |
| University of Illinois Cogen Facility · University of Illinois | Power plant (Natural Gas) | 46.1 km | 56 MW | [6] |
| Fisk Street · Midwest Generations EME LLC | Power plant (Petroleum) | 47.6 km | 197 MW | [6] |
| Paris Solar · Wisconsin Electric Power Co | Power plant (Solar) | 49.8 km | 200 MW | [6] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Zion Energy Center 345 kVPJM AH1-045 | Solar | In study · proposed 2023-06 | 658 MW | [4] |
| Zion Energy Center 345 kVPJM AF2-027 | Storage | In study · proposed 2021-06 | 635 MW | [4] |
| Waukegan Unit 8 CIR TransferPJM AJ1-012 | Storage | In study · proposed 2027-06 | 354 MW | [4] |
| Waukegan Unit 7 CIR TransferPJM AJ1-011 | Storage | In study · proposed 2027-06 | 328 MW | [4] |
| Waukegan 138 kVPJM AH1-190 | Storage | In study · proposed 2025-06 | 80 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
12| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | VISAway/317466755 name=VISA | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 475 Corporate Woods Parkway, Vernon Hills, IL 60061 | [1] | Likely | 2026-09-27 | Shown |
| Operator | VISAoperator=VISA | [1] | Likely | 2026-09-27 | Shown |
| Utility | Commonwealth Edison (ComEd)territory 4110: COMMONWEALTH EDISON CO (INVESTOR OWNED, EXELON CORP) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Generation queued in county | 2.06 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 11.87¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 15.19¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 2.07 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 55,000 sq ft | [1] derived | Likely | 2026-09-27 | Shown |