Windbreak Cable
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityWindbreak Cable
- →substationUnnamed substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.22 km away. Proximity does not establish that it serves the site.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 41.18260, -104.06850
- Address
- County
- Laramie County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 4 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wapa-- Western Area Power Administration, High West Energy, INC, City of Pine Bluffs - (Wy).
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- State avg. industrial price
Wyoming statewide average, July 2026.
- State avg. commercial price
Wyoming statewide average, July 2026.
- Generation within 50 km
5 EIA-reported plants within 50 km.
- Generation queued in county
3 active generation interconnection requests in Laramie County: Wind 650 MW, Hybrid 330 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Mountain Breeze Wind, LLC · Leeward Asset Management, LLC | Power plant (Wind) | 25.3 km | 172 MW | [6] |
| Panorama Wind, LLC · Leeward Asset Management, LLC | Power plant (Wind) | 29 km | 145 MW | [6] |
| Cedar Creek Wind · Leeward Asset Management, LLC | Power plant (Wind) | 32.3 km | 301 MW | [6] |
| Kimball Wind · Kimball Wind, LLC | Power plant (Wind) | 32.6 km | 30 MW | [6] |
| Cedar Creek II · AE Power Services LLC | Power plant (Wind) | 35.4 km | 248 MW | [6] |
| Unnamed substation | Substation | 0.22 km | — | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| GI-TC-2024-16 at Ault-Laramie River Station 345 LineSPP GI-TC-2024-16 | Wind | IA signed · proposed 2029-06 | 400 MW | [4] |
| GI-CS-2025-04 at Ault LRS 345 LineSPP GI-CS-2025-04 | Hybrid | In study · proposed 2029-11 | 330 MW | [4] |
| GI-TC-2024-15 at Big Bear 345 Switching StationSPP GI-TC-2024-15 | Wind | IA signed · proposed 2029-09 | 250 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
13| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Windbreak Cableway/1268789798 name=Windbreak Cable | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 210 Main Street, Pine Bluffs, WY 82082 | [1] | Likely | 2026-09-27 | Shown |
| Utility | Black Hills Energyterritory 19545: BLACK HILLS POWER, INC. (INVESTOR OWNED, BLACK HILLS POWER INC) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | WACM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substationway/1268478648 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.2 km | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 980 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 8.62¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 10.26¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 896 MW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 1,100 sq ft | [1] derived | Likely | 2026-09-27 | Shown |