Las Vegas
Market boundary: facilities within 40 km of the metro center (editorial definition).
Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned.
Construction pipeline by expected completion
MW from phases with a projected completion date
No dated pipeline yet.
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced—
- Interconnection requests—
- Contracted / approved—
- Under construction—
- Operational—
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Interconnection queues
Active requests to connect to the grid (CAISO). Requests are applications, not commitments — most never get built.
Largest operators & owners
Online + pipeline MW at linked facilities
- Switch— · 10 sites
- Flexential— · 2 sites
- Google— · 2 sites
- Fiberhub— · 1 sites
- Lumen Technologies— · 1 sites
- DataBank— · 1 sites
- Verizon— · 1 sites
Largest customers & end users
Tenants and workload owners, where sourced
None identified.
Utility exposure
Most likely retail utility by location (approximate)
- Southern California Edison— · 23 sites
Grid operators (ISO / RTO)
By facility location
- None (non-RTO region)— · 23 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|
Facilities by status
- Operating23
Campuses & sites (11)
Campus pages list their buildings
- CenturyLinkbuilding
- CenturyLinkbuilding
- DataBank Las Vegas LAS1building
- Fiberhub LAS1site
- Flexential Las Vegas - Downtownbuilding
- Flexential Las Vegas - Northbuilding
- Switch Edge 1building
- Switch Las Vegas 10building
- Switch Las Vegas 12building
- Verizonbuilding
- Verizon North Las Vegasbuilding