DC
/

Data centers near DeSoto County, MS

Tracked data centers within 10, 25 or 50 miles of an address, ZIP code, city or county, with operators, tenants, power, the likely utility and recent changes, each linked to its sources. Addresses are geocoded on our server and are not stored or kept in the link.

Radius:10 mi25 mi50 miLocation from the U.S. Census Gazetteer (centroid).

3 tracked facilities within 10 miles. 1 disclose power, 1.28 GW online (a floor: most sites don't disclose). Statewide, 33% of Mississippi facilities have a power figure.

ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assignedDownload CSVJSONAPI docs
Loading map…
  1. OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.AI campus· Memphis, DeSoto County, MS
    Operator
    SpaceXAI (xAI)
    Tenants / users
    —
    Power online
    —
    Pipeline
    —
    Likely utility
    Entergy · ISO/RTO: MISO
  2. Operating + expandingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.AI campus· Memphis, Shelby County, TN
    Operator
    SpaceXAI (xAI)
    Tenants / users
    Anthropic, Cursor, SpaceXAI (xAI)
    Power online
    1.28 GW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
    Pipeline
    2.07 GW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
    Likely utility
    Memphis Light, Gas and Water · ISO/RTO: None (non-RTO region)
    • Jun 15, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 490 MW → 946 MW
    • Jun 15, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 661 MW → 1.28 GW
    • Jun 15, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 1 → 2
  3. OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.AI campus· Memphis, Shelby County, TN
    Operator
    SpaceXAI (xAI)
    Tenants / users
    —
    Power online
    —
    Pipeline
    —
    Likely utility
    Memphis Light, Gas and Water · ISO/RTO: None (non-RTO region)