Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 7.51¢/kWh (EIA).
Construction pipeline by expected completion
MW from phases with a projected completion date
No dated pipeline yet.
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced400 MW
- Interconnection requests—
- Contracted / approved130 MW
- Under construction—
- Operational—
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
- PowerHouse / Poe Louisville400 MW / 130 MW
Interconnection queues
Active requests to connect to the grid (MISO, PJM). Requests are applications, not commitments — most never get built.
Largest operators & owners
Online + pipeline MW at linked facilities
- Flexential— · 2 sites
- CyrusOne— · 1 sites
- PowerHouse Data Centers— · 1 sites
Largest customers & end users
Tenants and workload owners, where sourced
None identified.
Utility exposure
Most likely retail utility by location (approximate)
- LG&E and KU Energy— · 3 sites
- Duke Energy— · 1 sites
- Kenergy Corp— · 1 sites
- Kentucky Power CO— · 1 sites
Grid operators (ISO / RTO)
By facility location
- None (non-RTO region)— · 3 sites
- PJM— · 2 sites
- MISO— · 1 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|
Facilities by status
- Operating5
- Unknown1