DC
/

What changed — Georgia Power

RSS / Atom feed for this view

Capacity, status, permit, grid-request and construction changes over the last three years, each with its source. A change means the same source reported a new value later; two sources disagreeing is not a change. Subscribe to the feed in any RSS reader to follow a facility, state or company.

Clear
  1. Jul 10, 2026
    xAI QTS Atlanta · GA
    • Status: Operating + expanding → Operating
    Source: Epoch AI
  2. Jun 14, 2026
    Microsoft Fairwater Atlanta · GA
    • Current IT capacity: 321 MW → 636 MW
    • Current facility power: 433 MW → 859 MW
    • Buildings operational: 2 → 4
    • Status: Operating + expanding → Operating
    • New capacity online: Building 3 and 4 are operational.
    Source: Epoch AI
  3. Feb 20, 2026
    CoreWeave Dalton 1 & 2 · GA
    • Buildings operational: 0 → 1
    • Status: Under construction → Operating
    • New capacity online: Building 1 is operational, given it was announced completed 4 months ago and looks completed in satellite imagery. All cooling/mechanical rows are installed, with no obvious active building construction visible.
    Source: Epoch AI
  4. Oct 14, 2025
    Microsoft Fairwater Atlanta · GA
    • Buildings operational: 0 → 2
    • Status: Under construction → Operating + expanding
    • New capacity online: Building 1 and 2 are operational. Building 1 looked operational sooner, but the buildings are paired in the Fairwater design. The roof of Building 4 is almost complete, while mechanical equipment is still being instal…
    Source: Epoch AI
  5. Feb 20, 2025
    xAI QTS Atlanta · GA
    • Buildings operational: 0 → 1
    • Status: Under construction → Operating + expanding
    • New capacity online: xAI's GPU cluster in the QTS Atlanta building at 1025 Jefferson Street NW is operational around this time. This date is a tentative estimate: Business Insider reported the buildout in February 2025, so the cluster lik…
    Source: Epoch AI
  6. Jun 3, 2024
    CoreWeave Dalton 1 & 2 · GA
    • Construction started: According to a few sources, Core Scientific announced that they're rebuilding their existing Dalton 1 (and we're assuming 2) datacenter to run AI using CoreWeave's GPUs, of which contract was first signed on this date…
    Source: Epoch AI
  7. Jan 23, 2024
    xAI QTS Atlanta · GA
    • Construction started: X Corp's $700 million investment in AI training hardware for the Atlanta data center is approved by the Development Authority of Fulton County (bond resolution fact sheet).
    Source: Epoch AI