CoreWeave Dalton 1 & 2
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionJun 3, 2024
Model estimate · Satellite imagery
- EnergizationFeb 20, 2026
Satellite imagery
- Feb 20, 2026 · Building 1 is operational, given it was announced completed 4 months ago and looks completed in satellite imagery. All cooling/mechanical rows are installed, with no obvious active[1]
- OperationalFeb 20, 2026
Satellite imagery
- Feb 20, 2026 · Building 1 is operational, given it was announced completed 4 months ago and looks completed in satellite imagery. All cooling/mechanical rows are installed, with no obvious active[1]
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.
Grid path
- →facilityCoreWeave Dalton 1 & 2
- →substationNot identifiedUnknownUnverifiedNo substation mapped within 3 km and none named in filings.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Street address- Coordinates
- 34.71351, -84.95218
- Address
- County
- Whitfield County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workload
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
Power (all fields)
- Current facility power
Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.
- Current IT capacity
Estimated IT load currently online, based on buildings observed operational.
- Estimated annual consumption
40 MW × 8,760 h × 70% utilization.
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- State avg. industrial price
Georgia statewide average, July 2026.
- State avg. commercial price
Georgia statewide average, July 2026.
- Generation within 50 km
9 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Dalton 2 · Georgia Power Co | Power plant (Solar) | 1.9 km | 7 MW | [6] |
| Thomas A Smith Energy Facility · Oglethorpe Power Corporation | Power plant (Natural Gas) | 3.2 km | 1.35 GW | [6] |
| Murray Treadwell Farms · Safari Energy, LLC | Power plant (Solar) | 14.1 km | 3 MW | [6] |
| Carters · USCE-Mobile District | Power plant (Pumped Storage) | 27.9 km | 560 MW | [6] |
| Gordon Thompson · Westbound Solar 3, LLC | Power plant (Solar) | 37.7 km | 3 MW | [6] |
| Gordon Pine Hall · Westbound Solar 3, LLC | Power plant (Solar) | 37.9 km | 2 MW | [6] |
| Chattanooga Metropolitan Airport Solar · Chattanooga Metropolitan Airport | Power plant (Solar) | 41.8 km | 2 MW | [6] |
| Volkswagen Solar System · SR Enterprise South, LLC | Power plant (Solar) | 45.6 km | 8 MW | [6] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
Real estate
None sourced yet
None sourced yet
None sourced yet
- Capital cost / investment
Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
Compute
What changed (last 3 years)
Follow this facility (RSS)Timeline
- Jun 3, 2024[1]
According to a few sources, Core Scientific announced that they're rebuilding their existing Dalton 1 (and we're assuming 2) datacenter to run AI using CoreWeave's GPUs, of which contract was first signed on this date. According to the press release, "The site modifications are expected to commence early in the second half of 2024 and achieve operational status in the first half of 2025."
- May 1, 2025[1]
Core Scientific investor presentation clearly shows Dalton 1 with a cleared pad on this month for construction. Source: https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001140361-25-039864/0001140361-25-039864.pdf
- Aug 29, 2025[1]
Based on Satellite imagery, Dalton 1 is still under construction. The building appears mostly roofed except for the entrance area, and there are no cooling units or backup generators installed yet.
Building 1 is operational, given it was announced completed 4 months ago and looks completed in satellite imagery. All cooling/mechanical rows are installed, with no obvious active building construction visible.
All claims (provenance audit)
27| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | CoreWeave Dalton 1 & 2 | [1] | Likely | 2026-02-20 | Shown |
| Status | Under construction | [1] derived | Likely | 2024-06-03 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2025-05-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2025-08-29 | Superseded / alternative |
| Status | Operating | [1] derived | Likely | 2026-02-20 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-02-20 | Shown |
| Address | 2205 Industrial South Rd, Dalton, GA, 30721 | [1] | Likely | 2026-02-20 | Shown |
| Owner | CoreWeaveOwner: CoreWeave | [1] | Confirmed | 2026-02-20 | Shown |
| End users | OpenAIUsers: OpenAI | [1] | Speculative | 2026-02-20 | Shown |
| Utility | Georgia Powerterritory 7140: GEORGIA POWER CO (INVESTOR OWNED, SOUTHERN COMPANY) | [2] derived | Unverified | 2022 | Shown |
| Current facility power | 40 MW | [1] estimated | Likely | 2026-02-20 | Shown |
| Current IT capacity | 28 MW | [1] estimated | Likely | 2026-02-20 | Shown |
| Estimated annual consumption | 245 GWh/yr | [3] estimated | Speculative | 2026-09-29 | Shown |
| ISO / RTO | None (non-RTO region) | [4] derived | Likely | — | Shown |
| Balancing authority | SOCO | [2] derived | Likely | — | Shown |
| State avg. industrial price | 10.03¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 12.54¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.94 GW | [6] derived | Confirmed | 202502 | Shown |
| Buildings operational | 1 | [1] estimated | Likely | 2026-02-20 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2024-06-03 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2025-05-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2025-08-29 | Superseded / alternative |
| Capital cost / investment | $1.1B | [1] estimated | Likely | 2026-02-20 | Shown |
| Compute (H100-equivalents) | 32,200 | [1] estimated | Likely | 2026-02-20 | Shown |
| Chip types | B300 | [1] | Confirmed | 2026-02-20 | Shown |
| Construction start | Jun 3, 2024 | [1] derived | Likely | 2026-02-20 | Shown |
| First operational | Feb 20, 2026 | [1] derived | Likely | 2026-02-20 | Shown |