CoreWeave Dalton 1 & 2

OperatingAI campusCampusWhitfield County, Georgia
70% profile completeness
27 claims from 10 sources
Current facility power
40 MW[1]
Likelyestimated
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
$1.1B[1]
Likelyestimated
First operational
Feb 20, 2026[1]
Likelyderived

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
High confidence
Project verification
Verified operating
Operation documented by satellite imagery.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Georgia Power · None (non-RTO region)
Substation: Not identified

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
40 MW[1]
Estimated from buildings observed operational
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionJun 3, 2024
    Model estimate · Satellite imagery
    • Jun 3, 2024 · Reported status: under construction[1]
    • Jun 3, 2024 · Construction start[1]
    • Jun 3, 2024 · According to a [few](https://investors.corescientific.com/news-events/press-releases/detail/74/core-scientific-to-provide-approximately-200-mw-of-infrastructure-to-host-coreweaves-[1]
  3. EnergizationFeb 20, 2026
    Satellite imagery
    • Feb 20, 2026 · Building 1 is operational, given it was announced completed 4 months ago and looks completed in satellite imagery. All cooling/mechanical rows are installed, with no obvious active[1]
  4. OperationalFeb 20, 2026
    Satellite imagery
    • Feb 20, 2026 · Building 1 is operational, given it was announced completed 4 months ago and looks completed in satellite imagery. All cooling/mechanical rows are installed, with no obvious active[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.

Grid path

  1. facility
    CoreWeave Dalton 1 & 2
  2. substation
    Not identified
    UnknownUnverified
    No substation mapped within 3 km and none named in filings.
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    Georgia Power[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    None (non-RTO region)[4]
    Service territoryLikely
    Balancing authority: SOCO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Street address
Coordinates
34.71351, -84.95218
Address
2205 Industrial South Rd, Dalton, GA, 30721[1]Likely
County
Whitfield County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    OpenAI[1]Speculative
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Owner
CoreWeave[1]Confirmed
End user
OpenAI[1]Speculative
Utility

Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Dalton Utilities, North Georgia Elec Member Corp.

Power (all fields)

Current facility power
40 MW[1]Likelyestimated

Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.

Current IT capacity
28 MW[1]Likelyestimated

Estimated IT load currently online, based on buildings observed operational.

Estimated annual consumption
245 GWh/yr[3]Speculativeestimated

40 MW × 8,760 h × 70% utilization.

Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
None (non-RTO region)[4]Likelyderived

Outside all ISO/RTO footprints; balancing authority shown separately.

Balancing authority
SOCO[2]Likelyderived

Control area of the containing utility territory.

State avg. industrial price
10.03¢/kWh[5]Confirmed

Georgia statewide average, July 2026.

State avg. commercial price
12.54¢/kWh[5]Confirmed

Georgia statewide average, July 2026.

Generation within 50 km
1.94 GW[6]Confirmedderived

9 EIA-reported plants within 50 km.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Dalton 2 · Georgia Power CoPower plant (Solar)1.9 km7 MW[6]
Thomas A Smith Energy Facility · Oglethorpe Power CorporationPower plant (Natural Gas)3.2 km1.35 GW[6]
Murray Treadwell Farms · Safari Energy, LLCPower plant (Solar)14.1 km3 MW[6]
Carters · USCE-Mobile DistrictPower plant (Pumped Storage)27.9 km560 MW[6]
Gordon Thompson · Westbound Solar 3, LLCPower plant (Solar)37.7 km3 MW[6]
Gordon Pine Hall · Westbound Solar 3, LLCPower plant (Solar)37.9 km2 MW[6]
Chattanooga Metropolitan Airport Solar · Chattanooga Metropolitan AirportPower plant (Solar)41.8 km2 MW[6]
Volkswagen Solar System · SR Enterprise South, LLCPower plant (Solar)45.6 km8 MW[6]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    Jun 3, 2024[1]
  5. First operational
    Feb 20, 2026[1]
  6. Expected completion
    —
Buildings operational
1[1]Likelyestimated
PhaseStatusAdded MWCompleted / expectedSource
Building 1operational40 MWFeb 20, 2026[1]

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Capital cost / investment
$1.1B[1]Likelyestimated

Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

Compute

Chip types
B300[1]Confirmed
Compute (H100-equivalents)
32,200[1]Likelyestimated

What changed (last 3 years)

Follow this facility (RSS)
  • Buildings operational
    0Jun 3, 2024[1]→1Feb 20, 2026[1]
  • Status
    Under constructionJun 3, 2024[1]→OperatingFeb 20, 2026[1]

Timeline

Construction start: Jun 3, 2024[1]
First operational: Feb 20, 2026[1]
  1. Jun 3, 2024[1]

    According to a few sources, Core Scientific announced that they're rebuilding their existing Dalton 1 (and we're assuming 2) datacenter to run AI using CoreWeave's GPUs, of which contract was first signed on this date. According to the press release, "The site modifications are expected to commence early in the second half of 2024 and achieve operational status in the first half of 2025."

  2. May 1, 2025[1]

    Core Scientific investor presentation clearly shows Dalton 1 with a cleared pad on this month for construction. Source: https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001140361-25-039864/0001140361-25-039864.pdf

  3. Aug 29, 2025[1]

    Based on Satellite imagery, Dalton 1 is still under construction. The building appears mostly roofed except for the entrance area, and there are no cooling units or backup generators installed yet.

  4. Feb 20, 202640 MW facility power· 1 buildings operational[1]

    Building 1 is operational, given it was announced completed 4 months ago and looks completed in satellite imagery. All cooling/mechanical rows are installed, with no obvious active building construction visible.

All claims (provenance audit)

27
FieldValueSourceConfidenceAs ofStatus
NameCoreWeave Dalton 1 & 2[1] Likely2026-02-20Shown
StatusUnder construction[1] derivedLikely2024-06-03Superseded / alternative
StatusUnder construction[1] derivedLikely2025-05-01Superseded / alternative
StatusUnder construction[1] derivedLikely2025-08-29Superseded / alternative
StatusOperating[1] derivedLikely2026-02-20Shown
Facility typeAI campus[1] derivedLikely2026-02-20Shown
Address2205 Industrial South Rd, Dalton, GA, 30721[1] Likely2026-02-20Shown
OwnerCoreWeaveOwner: CoreWeave[1] Confirmed2026-02-20Shown
End usersOpenAIUsers: OpenAI[1] Speculative2026-02-20Shown
UtilityGeorgia Powerterritory 7140: GEORGIA POWER CO (INVESTOR OWNED, SOUTHERN COMPANY)[2] derivedUnverified2022Shown
Current facility power40 MW[1] estimatedLikely2026-02-20Shown
Current IT capacity28 MW[1] estimatedLikely2026-02-20Shown
Estimated annual consumption245 GWh/yr[3] estimatedSpeculative2026-09-29Shown
ISO / RTONone (non-RTO region)[4] derivedLikely—Shown
Balancing authoritySOCO[2] derivedLikely—Shown
State avg. industrial price10.03¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price12.54¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km1.94 GW[6] derivedConfirmed202502Shown
Buildings operational1[1] estimatedLikely2026-02-20Shown
Buildings operational0[1] estimatedLikely2024-06-03Superseded / alternative
Buildings operational0[1] estimatedLikely2025-05-01Superseded / alternative
Buildings operational0[1] estimatedLikely2025-08-29Superseded / alternative
Capital cost / investment$1.1B[1] estimatedLikely2026-02-20Shown
Compute (H100-equivalents)32,200[1] estimatedLikely2026-02-20Shown
Chip typesB300[1] Confirmed2026-02-20Shown
Construction startJun 3, 2024[1] derivedLikely2026-02-20Shown
First operationalFeb 20, 2026[1] derivedLikely2026-02-20Shown