What changed — Montauk Innovations LLC
RSS / Atom feed for this viewCapacity, status, permit, grid-request and construction changes over the last three years, each with its source. A change means the same source reported a new value later; two sources disagreeing is not a change. Subscribe to the feed in any RSS reader to follow a facility, state or company.
- May 18, 2026
- Oct 14, 2025Google New Albany · OH
- Current IT capacity: 222 MW → 333 MW
- Current facility power: 267 MW → 400 MW
- Buildings operational: 3 → 4
- New capacity online: Building 4 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 5 roof is half complete. About half of the backup generators are in place. One cooling…
Source: Epoch AI - Jun 1, 2025Google New Albany · OH
- Current IT capacity: 144 MW → 222 MW
- Current facility power: 173 MW → 267 MW
- Buildings operational: 2 → 3
- New capacity online: Building 3 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 4 still has some work around the cooling towers. Work is underway on Building 5 - some…
Source: Epoch AI - Sep 13, 2024Google New Albany · OH
- Current IT capacity: 67 MW → 144 MW
- Current facility power: 80 MW → 173 MW
- Buildings operational: 1 → 2
- New capacity online: Building 2 is operational. Google Earth imagery shows 6 cooling towers installed as of 2024-04-20, and a final 7th unit appeared as of 2024-09-13, with minimal construction around the building. Building 3 roof is also…
Source: Epoch AI - Apr 20, 2024Google New Albany · OH
- Construction started: Building 1 is operational. Based on ~7 months since roof being completed, and cooling towers being installed sometime within that period. Building 2 roof is complete.
Source: Epoch AI