DC
/

Google New Albany

OperatingAI campusCampusNew Albany, Licking County, Ohio
70% profile completeness
59 claims from 11 sources
Current facility power
400 MW[1]
Likelyestimated
Planned capacity
Not yet sourced
Building footprint
95,300 sq ft[6]
Likelyderived
Buildings (planned)
Likelyderived
Capital cost / investment
$12.6B[1]
Likelyestimated
First operational
Apr 20, 2024[1]
Likelyderived

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
High confidence
Project verification
Verified operating
Operation documented by satellite imagery and government record.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
American Electric Power · PJM
Substation: On-site substation

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
400 MW[1]
Estimated from buildings observed operational
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredJan 2, 2019
    Government record
    • Jan 2, 2019 · Land acquisition / deed recorded[2]
    • Jan 2, 2019 · Deed/transfer recorded for parcel 094-106896-00.000 (no sale price disclosed).[2]
    • Sep 27, 2026 · Owner of record in county parcel data[2]
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionApr 20, 2024
    Model estimate · Satellite imagery
    • Apr 20, 2024 · Reported status: expanding[1]
    • Apr 20, 2024 · Construction start[1]
    • Apr 20, 2024 · Building 1 is operational. Based on ~7 months since roof being completed, and cooling towers being installed sometime within that period. Building 2 roof is complete.[1]
  3. EnergizationSep 13, 2024
    Satellite imagery
    • Sep 13, 2024 · Building 2 is operational. Google Earth imagery shows 6 cooling towers installed as of 2024-04-20, and a final 7th unit appeared as of 2024-09-13, with minimal construction around [1]
    • Jun 1, 2025 · Building 3 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 4 still has some work around the cooling towers. [1]
    • Oct 14, 2025 · Building 4 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 5 roof is half complete. About half of the backup[1]
  4. OperationalSep 13, 2024
    Satellite imagery · Government record
    • Sep 13, 2024 · Building 2 is operational. Google Earth imagery shows 6 cooling towers installed as of 2024-04-20, and a final 7th unit appeared as of 2024-09-13, with minimal construction around [1]
    • Jun 1, 2025 · Building 3 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 4 still has some work around the cooling towers. [1]
    • Oct 14, 2025 · Building 4 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 5 roof is half complete. About half of the backup[1]
    • Sep 27, 2026 · County land use: 305: Research/Chemical Labs[2]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Model estimate, Satellite imagery.

Grid path

  1. facility
    Google New Albany
  2. substation
    On-site substation[1][6]
    Satellite imageryLikely
    5 substation outlines traced inside the campus on satellite imagery; OSM maps Unnamed substation 0.05 km away
  3. transmission
    138 kV line[6]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.02 km away). Not confirmed as the supply path.
  4. utility
    American Electric Power[3]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[5]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
40.05645, -82.76825
Address
1101 Beech Rd SW, New Albany, OH 43054[1]Likely
County
Licking County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Property owner of record
Owner
Google[1]Confirmed
End user
Utility

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Licking Rural Electric INC.

Power (all fields)

Current facility power
400 MW[1]Likelyestimated

Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.

Current IT capacity
333 MW[1]Likelyestimated

Estimated IT load currently online, based on buildings observed operational.

Estimated annual consumption
2,453 GWh/yr[4]Speculativeestimated

400 MW × 8,760 h × 70% utilization.

Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[5]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[3]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (138 kV)[6]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.1 km[6]Likelyderived
Highest-voltage line nearby
138 kV[6]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.95¢/kWh[8]Confirmed

Ohio statewide average, July 2026.

State avg. commercial price
14.06¢/kWh[8]Confirmed

Ohio statewide average, July 2026.

Generation within 50 km
25 MW[9]Confirmedderived

9 EIA-reported plants within 50 km.

Generation queued in county
2.52 GW[7]Confirmedderived

14 active generation interconnection requests in Licking County: Solar 1,773 MW, Storage 750 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
138 kV lineTransmission line0.02 km138 kV[6]
Denison Solar Array · AEP Onsite Partners, LLCPower plant (Solar)21.4 km2 MW[9]
Dodge Park Engine No 1 · City of Columbus - (OH)Power plant (Petroleum)23.9 km2 MW[9]
St-1/1a Engine No 1 · City of Columbus - (OH)Power plant (Petroleum)24.2 km1 MW[9]
Renick Run Pumping Station 03-04 · City of Columbus - (OH)Power plant (Petroleum)25.1 km2 MW[9]
Ps St-8 Engine No 1 · City of Columbus - (OH)Power plant (Petroleum)26.1 km2 MW[9]
O'Shaughnessy Hydro · City of Columbus - (OH)Power plant (Hydroelectric)32.3 km5 MW[9]
Suburban Landfill Gas Recovery · WM Renewable Energy LLCPower plant (Biomass)47.4 km6 MW[9]
Igs Cmh4, LLC · Greenbacker Renewable Energy CorporationPower plant (Solar)48.5 km4 MW[9]
Unnamed substationSubstation0.05 km138 kV[6]
Unnamed substationSubstation0.13 km138 kV[6]
Unnamed substationSubstation0.14 km138 kV[6]
Google substation · GoogleSubstation0.37 km138 kV[6]
Unnamed substationSubstation0.51 km138 kV[6]
QTS NAL-2 Substation · Quality Technology ServicesSubstation0.95 km138 kV[6]
Largest queued generation in this countyFuelQueue statusMWSource
Centerburg 138 kVPJM AI2-088SolarIn study · proposed 2025-12413 MW[7]
Centerburg 138 kVPJM AG1-034SolarIn study · proposed 2023-10363 MW[7]
Centerburg 138 kVPJM AH1-036StorageIn study · proposed 2024-07278 MW[7]
Centerburg 138 kVPJM AG1-024SolarIn study · proposed 2023-10235 MW[7]
Flint GridPJM AF1-062StorageIA signed · proposed 2026-11200 MW[7]
Jug Street 138 kVPJM AI2-226StorageIn study · proposed 2022-08200 MW[7]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    Jan 2, 2019[2]
  3. Permitting
    —
  4. Construction start
    Apr 20, 2024[1]
  5. First operational
    Apr 20, 2024[1]
  6. Expected completion
    —
Buildings (planned)
5[1]Likelyderived

Count of building outlines traced on satellite imagery.

Buildings operational
4[1]Likelyestimated
PhaseStatusAdded MWCompleted / expectedSource
Building 1operational80 MWApr 20, 2024[1]
Building 2operational93 MWSep 13, 2024[1]
Building 3operational94 MWJun 1, 2025[1]
Building 4operational133 MWOct 14, 2025[1]
Building 5planned—Outlines traced on imagery; no completion date projected yet[1]

Real estate

Official assessments
Assessor's value for a tax year
  • $285.3M[2]
    Market value · tax year current (2026) · parcel 094-106896-00.000
  • $41.4M[2]
    Market value — land · tax year current (2026) · parcel 094-106896-00.000
  • $244M[2]
    Market value — improvements · tax year current (2026) · parcel 094-106896-00.000
Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

ParcelRecord ownerAcresZoning / useBuilding sq ftSource
094-106896-00.000
Licking County, OH
MONTAUK INNOVATIONS LLC
1600 AMPHITHEATRE PKWY , MOUNTAIN VIEW, CA
219.25305: Research/Chemical Labs—[2]
Site area
219.3 acres[2]Confirmed

Sum of county land area across parcels.

Land use
305: Research/Chemical Labs[2]Confirmed
Capital cost / investment
$12.6B[1]Likelyestimated

Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.

Annual property tax
Not yet sourced
Nearby comparable transactions

Size

Building footprint
95,300 sq ft[6]Likelyderived

Sum of 1 building outlines mapped in OpenStreetMap within this campus.

Parcel / land records
094-106896-00.000 (Licking County)[2]Confirmed
Floor area
Not yet sourced

Compute

Chip types
TPU v5e, TPU v5p, TPU v6e[1]Confirmed
Compute (H100-equivalents)
323,900[1]Likelyestimated

What changed (last 3 years)

Follow this facility (RSS)
  • Current IT capacity
    67 MWApr 20, 2024[1]→144 MWSep 13, 2024[1]→222 MWJun 1, 2025[1]→333 MWOct 14, 2025[1]
  • Current facility power
    80 MWApr 20, 2024[1]→173 MWSep 13, 2024[1]→267 MWJun 1, 2025[1]→400 MWOct 14, 2025[1]
  • Buildings operational
    1Apr 20, 2024[1]→2Sep 13, 2024[1]→3Jun 1, 2025[1]→4Oct 14, 2025[1]
  • Status
    Operating + expandingApr 20, 2024[1]→OperatingMay 18, 2026[1]

Timeline

Construction start: Apr 20, 2024[1]
First operational: Apr 20, 2024[1]
  1. Apr 20, 202480 MW facility power· 1 buildings operational[1]

    Building 1 is operational. Based on ~7 months since roof being completed, and cooling towers being installed sometime within that period. Building 2 roof is complete.

  2. Sep 13, 2024173 MW facility power· 2 buildings operational[1]

    Building 2 is operational. Google Earth imagery shows 6 cooling towers installed as of 2024-04-20, and a final 7th unit appeared as of 2024-09-13, with minimal construction around the building. Building 3 roof is also complete.

  3. Jun 1, 2025267 MW facility power· 3 buildings operational[1]

    Building 3 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 4 still has some work around the cooling towers. Work is underway on Building 5 - some walls and a few backup generators are in place.

  4. Oct 14, 2025400 MW facility power· 4 buildings operational[1]

    Building 4 is operational, based on all cooling units and tanks installed, minimal construction work around the building. Building 5 roof is half complete. About half of the backup generators are in place. One cooling tower is partly built.

  5. Jan 18, 2026400 MW facility power· 4 buildings operational[1]

    Water vapor from cooling towers is present across Building 1-4, confirming their operation. Building 5 roof is still incomplete, but most backup generators and 5 cooling towers have been installed.

  6. Mar 12, 2026400 MW facility power· 4 buildings operational[1]

    Building 5 has more cooling towers installed but not complete, and the roof is almost complete.

  7. May 18, 2026400 MW facility power· 4 buildings operational[1]

    Building 5 has all cooling towers installed, and all other components look complete, but there is still light work around the building. Based on that, we estimate 3 more months until operational.

  8. Jan 2, 2019[2]

    Deed/transfer recorded for parcel 094-106896-00.000 (no sale price disclosed).

Buildings on this campus

7

All claims (provenance audit)

59
FieldValueSourceConfidenceAs ofStatus
NameGoogle New Albany[1] Likely2026-05-18Shown
StatusOperating + expanding[1] derivedLikely2024-04-20Superseded / alternative
StatusOperating + expanding[1] derivedLikely2024-09-13Superseded / alternative
StatusOperating + expanding[1] derivedLikely2025-06-01Superseded / alternative
StatusOperating + expanding[1] derivedLikely2025-10-14Superseded / alternative
StatusOperating + expanding[1] derivedLikely2026-01-18Superseded / alternative
StatusOperating + expanding[1] derivedLikely2026-03-12Superseded / alternative
StatusOperating[1] derivedLikely2026-05-18Shown
Facility typeAI campus[1] derivedLikely2026-05-18Shown
Address1101 Beech Rd SW, New Albany, OH 43054[1] Likely2026-05-18Shown
Property owner of recordMontauk Innovations LLCParcel 094-106896-00.000: MONTAUK INNOVATIONS LLC[2] Confirmed2026-09-27Shown
OwnerGoogleOwner: Google[1] Confirmed2026-05-18Shown
End usersGoogle DeepMindUsers: Google DeepMind[1] Speculative2026-05-18Shown
UtilityAmerican Electric Powerterritory 14006: OHIO POWER CO (INVESTOR OWNED, AMERICAN ELECTRIC POWER CO)[3] derivedUnverified2022Shown
Current facility power400 MW[1] estimatedLikely2026-05-18Shown
Current facility power80 MW[1] estimatedLikely2024-04-20Superseded / alternative
Current facility power173 MW[1] estimatedLikely2024-09-13Superseded / alternative
Current facility power267 MW[1] estimatedLikely2025-06-01Superseded / alternative
Current facility power400 MW[1] estimatedLikely2025-10-14Superseded / alternative
Current facility power400 MW[1] estimatedLikely2026-01-18Superseded / alternative
Current facility power400 MW[1] estimatedLikely2026-03-12Superseded / alternative
Current IT capacity333 MW[1] estimatedLikely2026-05-18Shown
Current IT capacity67 MW[1] estimatedLikely2024-04-20Superseded / alternative
Current IT capacity144 MW[1] estimatedLikely2024-09-13Superseded / alternative
Current IT capacity222 MW[1] estimatedLikely2025-06-01Superseded / alternative
Current IT capacity333 MW[1] estimatedLikely2025-10-14Superseded / alternative
Current IT capacity333 MW[1] estimatedLikely2026-01-18Superseded / alternative
Current IT capacity333 MW[1] estimatedLikely2026-03-12Superseded / alternative
Estimated annual consumption2,453 GWh/yr[4] estimatedSpeculative2026-09-29Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[5] derivedLikely—Shown
Balancing authorityPJM[3] derivedLikely—Shown
Nearest mapped substationUnnamed substation (138 kV)way/1245826295[6] derivedLikely2026-09-28Shown
Distance to substation0.1 km[6] derivedLikely2026-09-28Shown
Highest-voltage line nearby138 kV[6] derivedLikely2026-09-28Shown
Generation queued in county2.52 GW[7] derivedConfirmed2026-09-27Shown
State avg. industrial price10.95¢/kWh[8] Confirmed2026-07Shown
State avg. commercial price14.06¢/kWh[8] Confirmed2026-07Shown
Generation within 50 km25 MW[9] derivedConfirmed202502Shown
Buildings (planned)5[1] derivedLikely2026-05-18Shown
Buildings operational4[1] estimatedLikely2026-05-18Shown
Buildings operational1[1] estimatedLikely2024-04-20Superseded / alternative
Buildings operational2[1] estimatedLikely2024-09-13Superseded / alternative
Buildings operational3[1] estimatedLikely2025-06-01Superseded / alternative
Buildings operational4[1] estimatedLikely2025-10-14Superseded / alternative
Buildings operational4[1] estimatedLikely2026-01-18Superseded / alternative
Buildings operational4[1] estimatedLikely2026-03-12Superseded / alternative
Building footprint95,300 sq ftway/1375443893[6] derivedLikely2026-09-27Shown
Site area219.3 acres[2] Confirmed2026-09-27Shown
Capital cost / investment$12.6B[1] estimatedLikely2026-05-18Shown
Parcel / land records094-106896-00.000 (Licking County)[2] Confirmed2026-09-27Shown
Assessed value (official)$285.3M[2] Confirmed2026Shown
Land use305: Research/Chemical Labs[2] Confirmed2026-09-27Shown
Compute (H100-equivalents)323,900[1] estimatedLikely2026-05-18Shown
Chip typesTPU v5e[1] Confirmed2026-05-18Shown
Chip typesTPU v5p[1] Confirmed2026-05-18Shown
Chip typesTPU v6e[1] Confirmed2026-05-18Shown
Land acquiredJan 2, 2019[2] derivedConfirmed2026-09-27Shown
Construction startApr 20, 2024[1] derivedLikely2026-05-18Shown
First operationalApr 20, 2024[1] derivedLikely2026-05-18Shown