Data centers in Jackson County, Missouri
Datacenter Source tracks 3 data centers in Jackson County, Missouri. Facilities that disclose power add up to 0 MW online and 0 MW in the pipeline — floors, since 0% report a figure. 4 interconnection-queue requests were filed in the county in the last two years.
Follow
Get changes to Jackson County, Missouri
Or subscribe in a feed reader: RSS / Atom
Facilities
3
Power online (floor)
—
Pipeline (floor)
—
With a power figure
0%
0% with confirmed evidence
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assignedCounty facilities:Download CSVJSONAPI docs
Facilities
- Netrality Data Centers Unclassified · Kansas CityOperating
- Patmos Hosting, Inc. data center — 1601 McGee Street Unclassified · Kansas CityOperating
- Unnamed data center UnclassifiedOperating
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
- Dec 10, 2025 · SPP AFS NJG-2025-006 Storage generation — AFS NJG-2025-006 at Bluejay 115/34.5kV Substation10 MW · None ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
- Oct 17, 2025 · SPP AFS NJG-2025-001 Storage generation — AFS NJG-2025-001 at Strothers Road 161 kV Substation10 MW · None ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
- Mar 1, 2025 · SPP GEN-2024-352 Storage generation — GEN-2024-352 at Sibley 345 kV Substation199 MW · DISIS STAGE ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
- Oct 30, 2024 · SPP GEN-2024-074 Storage generation — GEN-2024-074 at Duncan Road 161 kV Substation200 MW · DISIS STAGE ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
Water & cooling
Not yet collected
On-site generation & air permits
Not yet collected
Incentives
Not yet collected
Utility & rates: large-load tariffs
- Evergy Missouri West: Large Load Power Service (LLPS) rate plan for loads over 75 MW ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Missouri Public Service Commission · Nov 2025 · source
Regulatory events
Not yet collected