Data centers in Erie County, New York
Datacenter Source tracks 3 data centers in Erie County, New York. Facilities that disclose power add up to 0 MW online and 0 MW in the pipeline — floors, since 0% report a figure. 1 interconnection-queue request was filed in the county in the last two years.
Follow
Get changes to Erie County, New York
Or subscribe in a feed reader: RSS / Atom
Facilities
3
Power online (floor)
—
Pipeline (floor)
—
With a power figure
0%
33% with confirmed evidence
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assignedCounty facilities:Download CSVJSONAPI docs
Facilities
- Data & Technology Campus UnclassifiedPlanned
- Frontier Science Unclassified · AmherstOperating
- Unnamed data center — 350 Crosspoint Parkway Unclassified · GetzvilleOperating
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
- Jan 31, 2025 · NYISO 1726 Load request (Data center) — Data & Technology Campus300 MW · Status 5 (SRIS/SIS in progress); proposed initial backfeed: 12-2027 ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
Water & cooling
Not yet collected
On-site generation & air permits
Not yet collected
Incentives
Not yet collected
Utility & rates: large-load tariffs
Not yet collected for this state's utilities.
Regulatory events
Not yet collected
Recent changes
- Jan 31, 2025 · Data & Technology Campus ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. Permit / site plan filed: NYISO load interconnection request 1726 filed (300 MW).