Data centers in Herkimer County, New York
Datacenter Source tracks 2 data centers in Herkimer County, New York. Facilities that disclose power add up to 0 MW online and 0 MW in the pipeline — floors, since 0% report a figure. 3 interconnection-queue requests were filed in the county in the last two years.
Follow
Get changes to Herkimer County, New York
Or subscribe in a feed reader: RSS / Atom
Facilities
- Incremental Load Request for Remington Factory Redevelopment UnclassifiedPlanned
- Remington Factory Redevelopment UnclassifiedPlanned
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
- Nov 26, 2025 · NYISO 0581 Solar generation — Hills Solar20 MW · Status 11 (IA completed); studies available: FES, SIS, FS ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
- Aug 29, 2025 · NYISO 1740 Load request (Data center) — Incremental Load Request for Remington Factory Redevelopment400 MW · Status 5 (SRIS/SIS in progress); proposed initial backfeed: 07-2027 ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
- May 2, 2025 · NYISO 1735 Load request (Data center) — Remington Factory Redevelopment100 MW · Status 5 (SRIS/SIS in progress); proposed initial backfeed: 02-2029 ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
Not yet collected
Not yet collected
Not yet collected for this state's utilities.
Not yet collected
Recent changes
- Aug 29, 2025 · Incremental Load Request for Remington Factory Redevelopment ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. Permit / site plan filed: NYISO load interconnection request 1740 filed (400 MW).
- May 2, 2025 · Remington Factory Redevelopment ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. Permit / site plan filed: NYISO load interconnection request 1735 filed (100 MW).