Datacenter Source tracks 4 data centers in Luzerne County, Pennsylvania. Facilities that disclose power add up to 139 MW online and 73 MW in the pipeline — floors, since 25% report a figure.
Follow
Get changes to Luzerne County, Pennsylvania
Or subscribe in a feed reader: RSS / Atom
Facilities
- AWS Berwick AI campus · BerwickOperating + expanding139 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.+73 MW pipeline EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Amazon AWS PHL Hyperscale · BerwickOperating
- Nautilus Cryptomine UnclassifiedOperating
- Nautilus Cryptomine UnclassifiedOperating
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
No dated queue filings for this county in the files we ingest (some ISOs don't publish a county or filing date).
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
0.1 M gal/day modeled at 1 site EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
4 sites with documented on-site generation (MW not reported)
Not yet collected
Not yet collected for this state's utilities.
1 dated permit, rezoning or commission records
AWS Berwick: Pennsylvania PUC filing describing the planned 16-building AWS data center development
Recent changes
- Aug 1, 2026 · AWS Berwick EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current IT capacity: 77 MW → 108 MW
- Aug 1, 2026 · AWS Berwick EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current facility power: 102 MW → 139 MW
- Aug 1, 2026 · AWS Berwick EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 2 → 3
- Aug 1, 2026 · AWS Berwick EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Building 3 expected to come online sometime around August 2026, since in the May satellite image it appeared structurally complete with minimal construction surrounding it. Basing MW estimate using Building 2 as a ref…
- Jan 7, 2026 · AWS Berwick EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current IT capacity: 47 MW → 77 MW
- Jan 7, 2026 · AWS Berwick EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current facility power: 66 MW → 102 MW
- Jan 7, 2026 · AWS Berwick EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 1 → 2
- Jan 7, 2026 · AWS Berwick EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Building 2 operational estimate. This is based on the progress visible in the September 2025 image. The DEP also issues an air plan approval to add 48 more emergency generators on this date.
- Sep 9, 2025 · AWS Berwick EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 0 → 1
- Sep 9, 2025 · AWS Berwick EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Under construction → Operating + expanding
- Sep 9, 2025 · AWS Berwick EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Building 1 operational estimate. According to Google Earth Satellite Imagery from this date, Building 1 appears structurally complete and likely operational, while Building 2 is still missing two generators.