All About Serving Process Server
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredOct 1, 2021
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Community map.
Grid path
- →facilityAll About Serving Process Server
- →substationNeely Substation (69 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 1.31 km away. Proximity does not establish that it serves the site.
- →transmission69 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.12 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Street address- Coordinates
- 33.31992, -111.80969
- Address
- County
- Maricopa County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of record
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Property owner of record
- Utility
Most likely retail provider among 12 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wapa-- Western Area Power Administration, Electrical Dist No8 Maricopa, City of Mesa - (Az), Usbia-San Carlos Project, Gila River Indian Utility Authority (Gricua), Maricopa County M W C Dist #1, ….
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Arizona statewide average, July 2026.
- State avg. commercial price
Arizona statewide average, July 2026.
- Generation within 50 km
32 EIA-reported plants within 50 km.
- Generation queued in county
5 active generation interconnection requests in Maricopa County: Solar + storage 1,100 MW, Solar 20 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 69 kV line | Transmission line | 0.12 km | 69 kV | [1] |
| Santan · Salt River Project | Power plant (Natural Gas) | 5.7 km | 1.29 GW | [7] |
| Kyrene · Salt River Project | Power plant (Natural Gas) | 12.3 km | 525 MW | [7] |
| Ocotillo · Arizona Public Service Co | Power plant (Natural Gas) | 14.9 km | 605 MW | [7] |
| West Phoenix · Arizona Public Service Co | Power plant (Natural Gas) | 35.1 km | 909 MW | [7] |
| Agua Fria · Salt River Project | Power plant (Natural Gas) | 45.9 km | 741 MW | [7] |
| Desert Basin · Salt River Project | Power plant (Natural Gas) | 46.3 km | 704 MW | [7] |
| Sierra Estrella Energy Storage · Sierra Estrella Energy Storage, LLC | Power plant (Batteries) | 47.9 km | 250 MW | [7] |
| Sundance · Arizona Public Service Co | Power plant (Natural Gas) | 48.1 km | 410 MW | [7] |
| Neely Substation · Salt River Project | Substation | 1.31 km | 69 kV | [1] |
| Shultz Substation · Salt River Project | Substation | 2.26 km | 69 kV | [1] |
| Unnamed substation | Substation | 2.97 km | 69 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| HARQUAHALA FLATS 2CAISO 2027 | Solar + storage | In study · proposed 2028-04 | 400 MW | [5] |
| HARQUAHALA SUNRISECAISO 1678 | Solar + storage | In study · proposed 2030-04 | 300 MW | [5] |
| VULCANCAISO 1534 | Solar + storage | In study · proposed 2027-12 | 250 MW | [5] |
| HARQUAHALA SUNRISE 2CAISO 2029 | Solar + storage | In study · proposed 2026-09 | 150 MW | [5] |
| AGUA CALIENTE SOLAR 2CAISO 1222 | Solar | In study · proposed 2016-12 | 20 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquiredOct 1, 2021[2]
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
- $2.6M[2]Recorded sale · Oct 1, 2021 · parcel 302-84-928
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 302-84-928 Maricopa County, AZ | ALATRASH INVESTMENTS LLC 6530 N 16TH ST PHOENIX AZ USA 85016 | 1.74 | CONTACT LOCAL JURISDICTION · Property use code 1410 | — | [2] |
- Site area
Sum of county land area across parcels.
- Land use
- Annual property tax
- Not yet sourced
- Emailage · 3.4 km · parcel 303-06-001C$45.5M · Mar 1, 2022 [2]
- Emailage · 3.4 km · parcel 303-06-001D$45.5M · Mar 1, 2022 [2]
- StrongMind · 3.9 km · parcel 302-35-446$2.9M · Jun 1, 2018 [2]
- GoDaddy - Gilbert · 5.4 km · parcel 302-24-372$39M · Jan 1, 2018 [2]
- The Chatfield Group · 8.6 km · parcel 140-66-892$1M · May 1, 2019 [2]
- Digital Realty Phoenix PHX15 · 8.8 km · parcel 303-36-268$289.3M · Jul 1, 2010 [2]
Size
- Parcel / land records
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
All claims (provenance audit)
21| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | All About Serving Process Servernode/7578821329 name=All About Serving Process Server | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 1909 East Ray Road, Chandler, AZ 85225 | [1] | Likely | 2026-09-27 | Shown |
| Property owner of record | Alatrash Investments LLCParcel 302-84-928: ALATRASH INVESTMENTS LLC | [2] | Confirmed | 2026-09-27 | Shown |
| Utility | Salt River Projectterritory 16572: SALT RIVER PROJECT (POLITICAL SUBDIVISION, SALT RIVER PROJECT) | [3] derived | Unverified | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [4] derived | Likely | — | Shown |
| Balancing authority | SRP | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Neely Substation (69 kV)way/345471207 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.3 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 69 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.12 GW | [5] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 9.35¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 13.12¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 5.83 GW | [7] derived | Confirmed | 202502 | Shown |
| Site area | 1.7 acres | [2] | Confirmed | 2026-09-27 | Shown |
| Parcel / land records | 302-84-928 (Maricopa County) | [2] | Confirmed | 2026-09-27 | Shown |
| Assessed value (official) | $2.2M | [2] | Confirmed | 2027 | Shown |
| Last recorded sale price | $2.6M | [2] | Confirmed | 2021-10-01 | Shown |
| Last recorded sale date | Oct 1, 2021 | [2] | Confirmed | 2021-10-01 | Shown |
| Land use | Property use code 1410 | [2] | Confirmed | 2026-09-27 | Shown |
| Land acquired | Oct 1, 2021 | [2] derived | Confirmed | 2026-09-27 | Shown |