DC
/

Arizona

Facilities
67
4 campuses
Power online
577 MW
3 sites reporting
Under construction
190 MW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
3
577 MW online · 190 MW pipeline
AI compute
0.54M
H100-equivalents (est.)
Capital (reported + est.)
$17B
$9.61B assessed

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 9.35¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW150 MW300 MW450 MW600 MW202420252026202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2030

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced267 MW
  • Interconnection requests—
  • Contracted / approved300 MW
  • Under construction190 MW
  • Operational577 MW
Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented

No large gaps in this scope.

Verified operating: 62Grid-backed: 1Unverified: 4

Interconnection queues

Active requests to connect to the grid (CAISO). Requests are applications, not commitments — most never get built.

Generation seeking interconnection7.42 GW · 14 requests
Solar + storage 7.4 GW

Markets

Click through to drill down

Online Under construction + planned
NameFacilitiesOnlinePipeline
Phoenix64577 MW190 MW

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • None (non-RTO region)577 MW + 190 MW · 67 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
Stream PhoenixOperating + expanding77 MW190 MW
Microsoft GoodyearOperating263 MW—
Google MesaOperating237 MW—

Facilities by status

  • Operating65
  • Operating + expanding1
  • Unknown1