Data centers in Maricopa County, Arizona
Datacenter Source tracks 64 data centers in Maricopa County, Arizona. Facilities that disclose power add up to 577 MW online and 190 MW in the pipeline — floors, since 6% report a figure.
Follow
Get changes to Maricopa County, Arizona
Or subscribe in a feed reader: RSS / Atom
Facilities
- Stream Phoenix AI campusOperating + expanding77 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.+190 MW pipeline EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Microsoft Goodyear AI campus · GoodyearOperating263 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Google Mesa AI campusOperating237 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- 1GServers Unclassified · PhoenixOperating
- Accelera Data Systems UnclassifiedOperating
- Alembic Computer Services, Inc. UnclassifiedOperating
- Aligned Energy Data Center Unclassified · PhoenixOperating
- All About Serving Process Server Unclassified · ChandlerOperating
- Alliance Technology Unclassified · MesaOperating
- Apple Data Center Hyperscale · MesaOperating
- AZ Labs UnclassifiedOperating
- Centersquare: Phoenix - (PHX1 - Mesa) Colocation · MesaOperating
- Cogent Data Center Enterprise · PhoenixOperating
- Comarch Unclassified · MesaOperating
- CyrusOne PHX1 Colocation · ChandlerOperating
- CyrusOne PHX3 Colocation · ChandlerOperating
- CyrusOne PHX4 Colocation · ChandlerOperating
- CyrusOne PHX4 Colocation · ChandlerOperating
- CyrusOne PHX5 Colocation · ChandlerOperating
- CyrusOne PHX6 Colocation · ChandlerOperating
- CyrusOne PHX7 Colocation · ChandlerOperating
- CyrusOne PHX8 Colocation · ChandlerOperating
- Data Storage Centers Unclassified · PhoenixOperating
- DataPro USA Web Development UnclassifiedOperating
- Digital Realty Data Center Colocation · TempeOperating
- Digital Realty Phoenix PHX15 Colocation · ChandlerOperating
- EdgeConneX Colocation · TempeOperating
- EdgeConneX PHX02 Data Center Colocation · MesaOperating
- EdgeCore Unclassified · MesaOperating
- Emailage UnclassifiedOperating
- Flexential Phoenix - Deer Valley Colocation · PhoenixOperating
- GoDaddy - Gilbert Unclassified · GilbertOperating
- H5 Phoenix Colocation · ChandlerOperating
- Iron Mountain AZP-1 Colocation · PhoenixOperating
- Iron Mountain AZP-2 Colocation · PhoenixOperating
- Iron Mountain Data Centers AZS-1 UnclassifiedOperating
- Iron Mountain Records Storage Colocation · PhoenixOperating
- J-Curve Technologies UnclassifiedOperating
- K-Motion Interactive UnclassifiedOperating
- L3Harris Technologies Inc UnclassifiedOperating
- Lumen Enterprise · PhoenixOperating
- Myndshift Technologies UnclassifiedOperating
- Omnis Network Unclassified · TempeOperating
- OptimumHQ Unclassified · MesaOperating
- PhoenixNAP Unclassified · PhoenixOperating
- PHX-10 Hyperscale · GoodyearOperating
- PHX-11 Hyperscale · GoodyearOperating
- PHX-12 Hyperscale · GoodyearOperating
- PHX-13 Hyperscale · GoodyearOperating
- PHX-14 Hyperscale · GoodyearOperating
- Profit Finder Pro Software UnclassifiedOperating
- QTS ColocationOperating
- QTS ColocationOperating
- Stream Data Centers PHX-1 Unclassified · GoodyearOperating
- StrongMind UnclassifiedOperating
- The Chatfield Group Unclassified · MesaOperating
- Unnamed data center UnclassifiedOperating
- Unnamed data center UnclassifiedOperating
- Unnamed data center UnclassifiedOperating
- Unnamed data center UnclassifiedOperating
- Unnamed data center — 4010 North 3rd Street Unclassified · PhoenixOperating
- Unnamed data center — 850 South Bullard Avenue Unclassified · GoodyearOperating
- Vantage Data Centers Colocation · GoodyearOperating
- VaultLogix UnclassifiedOperating
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
No dated queue filings for this county in the files we ingest (some ISOs don't publish a county or filing date).
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
0 M gal/day modeled at 1 site EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Air-cooled (chillers / dry coolers): 1 site EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Evaporative (cooling towers): 1 site EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
1 sites with documented on-site generation (MW not reported)
2 air permits matched to tracked sites ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.80% Synthetic Minor Emissions: 2
Not yet collected
Not yet collected for this state's utilities.
Not yet collected
Recent changes
- Aug 15, 2026 · Google Mesa EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current IT capacity: 90 MW → 183 MW
- Aug 15, 2026 · Google Mesa EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current facility power: 126 MW → 237 MW
- Aug 15, 2026 · Google Mesa EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 1 → 2
- Aug 15, 2026 · Google Mesa EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Operating + expanding → Operating
- Aug 15, 2026 · Google Mesa EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Building 2 is operational. This is estimated based on the close-to-complete construction status from May 2026.
- Jul 1, 2026 · Cogent Data Center ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. Land acquired: Deed recorded for parcel 113-54-017A (owner of record: Cube Data Center Company LLC).
- Jun 16, 2026 · Vantage Data Centers ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. Land acquired: Deed recorded for parcel 500-10-858C (owner of record: Vantage Data Centers Az11 LLC).
- Jun 1, 2026 · Cogent Data Center ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. Land acquired: Deed/transfer recorded for parcel 113-54-017A: $8,300,000.
- May 1, 2026 · Stream Phoenix EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 0 → 1
- May 1, 2026 · Stream Phoenix EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Under construction → Operating + expanding
- May 1, 2026 · Stream Phoenix EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Estimated: AI building 1 should be operational. Major construction work finished by January 31, 2026, and the shell looked complete by that date. We estimate after three months the building will be operational.
- Apr 27, 2026 · Microsoft Goodyear EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Operating + expanding → Operating