Amazon DCA-64
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredOct 27, 2008
Government record
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Community map.
Grid path
- →facilityAmazon DCA-64
- →substationFranconia Substation (230 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.73 km away. Proximity does not establish that it serves the site.
- →transmission230 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.14 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 38.74198, -77.18617
- Address
- County
- Fairfax County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Virginia statewide average, July 2026.
- State avg. commercial price
Virginia statewide average, July 2026.
- Generation within 50 km
80 EIA-reported plants within 50 km.
- Generation queued in county
3 active generation interconnection requests in Fairfax County: Storage 250 MW, Other 98 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line | Transmission line | 0.14 km | 230 kV | [1] |
| 230kV transmission line | Transmission line | 0.96 km | 230 kV | [1] |
| Covanta Fairfax Energy · Covanta Fairfax Inc | Power plant (Biomass) | 7.1 km | 98 MW | [6] |
| Possum Point · Virginia Electric & Power Co | Power plant (Natural Gas) | 24.3 km | 645 MW | [6] |
| Brandywine Power Facility · KMC Thermo, LLC | Power plant (Natural Gas) | 28.8 km | 230 MW | [6] |
| Keys Energy Center · PSEG Keys Energy Center, LLC | Power plant (Natural Gas) | 31.5 km | 763 MW | [6] |
| Cpv St Charles Energy Center · CPV Maryland LLC | Power plant (Natural Gas) | 32 km | 732 MW | [6] |
| Morgantown Generating Plant · Lanyard Power Holdings, LLC | Power plant (Petroleum) | 46.3 km | 108 MW | [6] |
| Potomac Energy Center, LLC · Potomac Energy Center LLC | Power plant (Natural Gas) | 46.9 km | 766 MW | [6] |
| Chalk Point Power · Chalk Point Power, LLC | Power plant (Natural Gas) | 48.7 km | 1.61 GW | [6] |
| Franconia Substation | Substation | 0.73 km | 230 kV | [1] |
| Unnamed substation | Substation | 0.87 km | 230 kV | [1] |
| Unnamed substation | Substation | 1.15 km | — | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Clifton 230 kVPJM AG2-286 | Storage | In study · proposed 2023-12 | 150 MW | [4] |
| Reston 230 kVPJM AG2-326 | Storage | In study · proposed 2023-12 | 100 MW | [4] |
| Occoquan 230kVPJM AH1-197 | Other | In study · proposed 2021-08 | 98 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquiredOct 27, 2008[7]
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 0992 01 0008A Fairfax County, VA | — | — | Land use code 190 | — | [7] |
- Land use
- Annual property tax
- Not yet sourced
- Equinix DC7 · 18.8 km · parcel 0392 01 0013D$37M · Sep 15, 2025 [7]
- Equinix DC7 · 18.8 km · parcel 0392 01 0013D$63M · Jun 2, 2011 [7]
- Equinix DC7 · 18.8 km · parcel 0392 01 0013D$69M · Dec 27, 2016 [7]
- Lumen McLean 1 · 19.9 km · parcel 0294 06 0105$52M · Jul 30, 2021 [7]
- Lumen McLean 1 · 19.9 km · parcel 0294 06 0105$40.3M · Aug 10, 2011 [7]
- Lumen McLean 1 · 19.9 km · parcel 0294 06 0105$39M · Oct 20, 2016 [7]
Size
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
- Oct 27, 2008[7]
Deed/transfer recorded for parcel 0992 01 0008A (no sale price disclosed).
- Mar 1, 2012[7]
Deed/transfer recorded for parcel 0992 01 0008A: $6,250,000.
- Feb 22, 2021[7]
Deed/transfer recorded for parcel 0992 01 0008A: $28,000,000.
- Apr 14, 2023[7]
Deed/transfer recorded for parcel 0992 01 0008A (no sale price disclosed).
- Apr 14, 2023[7]
Deed/transfer recorded for parcel 0992 01 0008A (no sale price disclosed).
All claims (provenance audit)
22| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Amazon DCA-64way/1536981894 name=Amazon DCA-64 | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 7951;7961 Loisdale Road, Springfield, VA 22150 | [1] | Likely | 2026-09-27 | Shown |
| Operator | Amazon Web Servicesoperator=Amazon Web Services | [1] | Likely | 2026-09-27 | Shown |
| Utility | Dominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Franconia Substation (230 kV)way/232289062 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.7 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 348 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 5.43 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 122,000 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| Parcel / land records | 0992 01 0008A (Fairfax County) | [7] | Confirmed | 2026-09-27 | Shown |
| Assessed value (official) | $290.4M | [7] | Confirmed | 2026 | Shown |
| Last recorded sale price | $28M | [7] | Confirmed | 2021-02-22 | Shown |
| Last recorded sale date | Feb 22, 2021 | [7] | Confirmed | 2021-02-22 | Shown |
| Land use | Land use code 190 | [7] | Confirmed | 2026-09-27 | Shown |
| Land acquired | Oct 27, 2008 | [7] derived | Confirmed | 2026-09-27 | Shown |