Northern Virginia
Market boundary: facilities within 45 km of the metro center (editorial definition).
Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned.
Construction pipeline by expected completion
MW from phases with a projected completion date
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced487 MW
- Interconnection requests—
- Contracted / approved—
- Under construction369 MW
- Operational4.71 GW
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Interconnection queues
Active requests to connect to the grid (PJM). Requests are applications, not commitments — most never get built.
Largest operators & owners
Online + pipeline MW at linked facilities
- Digital Realty1.2 GW + 0 MW · 39 sites
- Amazon Web Services879 MW + 0 MW · 142 sites
- CloudHQ558 MW + 0 MW · 12 sites
- Google286 MW + 0 MW · 10 sites
- QTS Data Centers160 MW + 0 MW · 12 sites
- CyrusOne157 MW + 0 MW · 7 sites
- Cologix51 MW + 0 MW · 2 sites
- NTT Global Data Centers27 MW + 0 MW · 10 sites
- Centersquare2 MW + 0 MW · 8 sites
- Equinix— · 19 sites
- Microsoft— · 8 sites
- Vantage Data Centers— · 7 sites
Largest customers & end users
Tenants and workload owners, where sourced
- Google DeepMind286 MW + 0 MW · 1 sites
Utility exposure
Most likely retail utility by location (approximate)
- Dominion Energy3.39 GW + 369 MW · 436 sites
- Potomac Electric Power CO— · 2 sites
Grid operators (ISO / RTO)
By facility location
- PJM3.39 GW + 369 MW · 439 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| STACK Infrastructure NVA02 | Operating + expanding | 118 MW | 369 MW |
| Google Bristow | Operating | 286 MW | — |
| CloudHQ LC1 | Operating | 264 MW | — |
| Digital Realty IAD39 | Operating | 192 MW | — |
| CloudHQ LC2 | Operating | 162 MW | — |
| Digital Realty IAD41 | Operating | 135 MW | — |
| CloudHQ LC3 | Operating | 132 MW | — |
| Digital Realty IAD42 | Operating | 90 MW | — |
| Digital Realty IAD43 | Operating | 90 MW | — |
| CyrusOne NVA1/NVA2/NVA3 | Operating | 85 MW | — |
| QTS Ashburn 3 DC1 | Operating | 80 MW | — |
| QTS Ashburn 3 DC2 | Operating | 80 MW | — |
| Digital Realty ACC4 | Operating | 72 MW | — |
| Digital Realty ACC5 | Operating | 72 MW | — |
| Amazon IAD-162 | Operating | 65 MW | — |
Facilities by status
- Operating292
- Operating + expanding1
- Under construction69
- Planned77
Campuses & sites (158)
Campus pages list their buildings
- STACK Infrastructure NVA02118 MW online · 369 MW pipeline
- Google Bristow286 MW online
- Digital Realty IAD5560 MW online
- CyrusOne NVA424 MW online
- Centersquare IAD32 MW online
- 8100 Boone Boulevardsite
- Aligned IAD-03building
- Amazon DCA-64building
- Amazon IAD-180building
- Amazon IAD-500building
- Arcola Tech Parkbuilding
- Beaumeade data center sitesite
- Beaumeade data center sitesite
- Belmont Innovation Station data center sitesite
- Broad Run Technology Park data center sitesite
- Compass IAD IEbuilding
- CoreSite DC1site
- CyrusOne NVA14building
- Data center parcel 044292829000site
- Data center parcel 088209173000site
- DataBank IAD2building
- Digital Loudoun Plazabuilding
- Digital Loudoun Plazabuilding
- Digital Realty IAD30building
- Digital Realty VA3building
- Digital Realty VA4building
- Dulles 28 Technology Park data center sitesite
- EdgeCore AS01building
- EdgeCore AS02building
- Equinix DC13building
- Equinix DC14building
- Equinix DC14building
- Equinix DC7building
- Equinix DC97building
- Evocative IAD1building
- Google Arcolacampus
- Google Leesburg Building 3building
- H5 Ashburnbuilding
- H5 IAD31building
- H5 IAD32building
- Inova Health System Plan data center sitesite
- Lincoln Rackhouse Marylandbuilding
- Loudoun Metro data center sitesite
- Lumen Ashburnbuilding
- Menlo Digital MD-DC1building
- Microsoft Leesburg Building 3building
- Microsoft Leesburg Building 4building
- Microsoft Leesburg Building 5building
- NTT VA10building
- OVH US East Vint Hillbuilding
- PowerHouse Pacific Building 1building
- PowerHouse Pacific Building 2building
- PowerHouse Pacific Building 3building
- Proposed data center — Amazon Data Servicessite
- Proposed data center — Ashburn Village Office Parksite
- Proposed data center — Beaumeadesite
- Proposed data center — Beaumeadesite
- Proposed data center — Beaumeadesite
- Proposed data center — Belmontsite
- Proposed data center — Bg Southsite
- Proposed data center — Brambleton Active Adultsite
- Proposed data center — Broad Run Business Centersite
- Proposed data center — Broadlandssite
- Proposed data center — Cardinal Industrial Parksite
- Proposed data center — Catapult Venturessite
- Proposed data center — Commonwealth Centersite
- Proposed data center — Concorde Industrial Parksite
- Proposed data center — Crosstrail Industrl Land Condosite
- Proposed data center — Digital Dulles Land Condosite
- Proposed data center — Downs Parksite
- Proposed data center — Dulles Parkway Centersite
- Proposed data center — Dulles Trade Center 2site
- Proposed data center — EPLAN-2023-0115site
- Proposed data center — EPLAN-2023-0119site
- Proposed data center — EPLAN-2023-0122site
- Proposed data center — EPLAN-2024-0058site
- Proposed data center — EPLAN-2024-0163site
- Proposed data center — EPLAN-2024-0205site
- Proposed data center — EPLAN-2025-0126site
- Proposed data center — EPLAN-2025-0195site
- Proposed data center — Evergreen Meadowssite
- Proposed data center — Evergreen Meadowssite
- Proposed data center — Evergreen Meadowssite
- Proposed data center — Farah Naplessite
- Proposed data center — Firefoxsite
- Proposed data center — Gateway Northsite
- Proposed data center — Gateway Northsite
- Proposed data center — Haynes Waiversite
- Proposed data center — Holiday Centersite
- Proposed data center — Inova Health System Foundationsite
- Proposed data center — LEGI-2023-0064site
- Proposed data center — LEGI-2024-0037site
- Proposed data center — LEGI-2024-0039site
- Proposed data center — Loudoun Business Parksite
- Proposed data center — Loudoun Tech Centersite
- Proposed data center — Loudoun Tech Centersite
- Proposed data center — Loudoun Tech Centersite
- Proposed data center — Loudoun Tech Center H1site
- Proposed data center — Luck Stone Corporationsite
- Proposed data center — Mci/No Va Campussite
- Proposed data center — Mercure Business Parksite
- Proposed data center — Mercure Business Parksite
- Proposed data center — Mercure Business Parksite
- Proposed data center — Mercure Business Parksite
- Proposed data center — Mercure Business Parksite
- Proposed data center — Mid Dulles Centersite
- Proposed data center — Na Dulles Real Estatesite
- Proposed data center — Paragonparksite
- Proposed data center — Philips Electronics Na Corpsite
- Proposed data center — Prologis Exchangesite
- Proposed data center — Prologis Exchangesite
- Proposed data center — Prologis Park Gatewaysite
- Proposed data center — Quantum Parksite
- Proposed data center — Sdc Ashburnsite
- Proposed data center — Sdc Ashburnsite
- Proposed data center — Spring Valley Farmssite
- Proposed data center — Stack Broad Run Land Condosite
- Proposed data center — Steeplechasesite
- Proposed data center — Sterling Business Parksite
- Proposed data center — Sterling Park Ipsite
- Proposed data center — STMP-2022-0018site
- Proposed data center — STPL-2018-0019site
- Proposed data center — STPL-2022-0040site
- Proposed data center — Summit At Dullessite
- Proposed data center — TLREZN2024-0003site
- Proposed data center — Tuscarora Crossing Lb1 Ph1site
- Proposed data center — Tuscarora Crossing Southsite
- Proposed data center — Uss Industrial Parksite
- Sentinel Cloud Plazabuilding
- STACKbuilding
- STACK NVA01Abuilding
- STACK NVA05Abuilding
- STACK NVA06building
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data center — 20481 Goose Landing Lanebuilding
- Unnamed data center — 4120 Lafayette Center Drivebuilding
- Unnamed data center — 4227 Lafayette Center Drivebuilding
- Unnamed data center — 7777 Infantry Ridge Roadbuilding
- Unnamed data center — 8100 Boone Boulevardbuilding
- Unnamed data center — Redskin Drivebuilding
- Unnamed data center — Redskin Drivebuilding
- Vantage VA3building
- Visa Operations Center Eastbuilding
- Yondr Allegro Southbuilding