Amazon IAD-601
Part of Amazon Web Services — Sterling, VA campus
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Permit / site plan, Community map.
Grid path
- →facilityAmazon IAD-601
- →substationParagon Park Substation (230 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.35 km away. Proximity does not establish that it serves the site.
- →transmission2081;2150 (230 kV)[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.11 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 39.01524, -77.43769
- Address
- County
- Loudoun County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of record
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Property owner of record
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Virginia statewide average, July 2026.
- State avg. commercial price
Virginia statewide average, July 2026.
- Generation within 50 km
64 EIA-reported plants within 50 km.
- Generation queued in county
11 active generation interconnection requests in Loudoun County: Storage 940 MW, Solar 100 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 2081;2150 · Dominion Energy | Transmission line | 0.11 km | 230 kV | [1] |
| 230 kV line | Transmission line | 0.28 km | 230 kV | [1] |
| 2081;2207 · Dominion Energy | Transmission line | 0.39 km | 230 kV | [1] |
| 2081 · Dominion Energy | Transmission line | 0.64 km | 230 kV | [1] |
| 2207 | Transmission line | 0.64 km | 230 kV | [1] |
| 2165 · Virginia Electric & Power Company | Transmission line | 0.74 km | 230 kV | [1] |
| Potomac Energy Center, LLC · Potomac Energy Center LLC | Power plant (Natural Gas) | 10.4 km | 766 MW | [7] |
| Montgomery County Resource Recovery · Covanta Montgomery, Inc. | Power plant (Biomass) | 20.7 km | 54 MW | [7] |
| Dickerson Power · Dickerson Power, LLC | Power plant (Natural Gas) | 21.7 km | 299 MW | [7] |
| Nih Cogeneration Facility · National Institutes of Health | Power plant (Natural Gas) | 29.8 km | 28 MW | [7] |
| Covanta Alexandria/Arlington Energy · Covanta Alexandria/Arlington | Power plant (Biomass) | 35.8 km | 29 MW | [7] |
| Central Utility Plant At White Oak · GSA Metropolitan Service Center | Power plant (Natural Gas) | 39.4 km | 54 MW | [7] |
| Covanta Fairfax Energy · Covanta Fairfax Inc | Power plant (Biomass) | 39.5 km | 98 MW | [7] |
| Blake Solar Plant · Horus West Virginia 1, LLC | Power plant (Solar) | 43.9 km | 80 MW | [7] |
| Paragon Park Substation | Substation | 0.35 km | 230 kV | [1] |
| Beco Substation · Dominion Energy | Substation | 1.03 km | 230 kV | [1] |
| Interconnection Substation · Dominion Energy | Substation | 1.12 km | 230 kV | [1] |
| Unnamed substation | Substation | 1.25 km | — | [1] |
| Unnamed substation | Substation | 1.73 km | — | [1] |
| Buttermilk Substation · Dominion Energy | Substation | 1.89 km | 230 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Loudoun 230 kVPJM AG2-285 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| Beaumeade 230 kVPJM AG2-287 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| New Road StoragePJM AE2-019 | Storage | IA signed · proposed 2026-12 | 120 MW | [5] |
| Dulles SolarPJM AF1-147 | Solar | IA signed · proposed 2023-12 | 100 MW | [5] |
| Roundtable 230 kVPJM AG2-307 | Storage | In study · proposed 2023-12 | 100 MW | [5] |
| Shelhorn 230 kVPJM AG2-323 | Storage | In study · proposed 2023-12 | 100 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
- Permit / case numbers
Real estate
None sourced yet
None sourced yet
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 043482656000 Loudoun County, VA | CABIN BRANCH CREEK LLC Project: Paragon Park | 53.96 | IP (ZRTD-2016-0012) · Data Center | 685,682 built | [2] |
- Site area
Legal acreage of the parcel(s).
- Zoning
- Land use
- Annual property tax
- Not yet sourced
Size
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
13- Amazon IAD-10Operating · 112,900 sq ft footprint
- Amazon IAD-32Operating · 35,800 sq ft footprint
- Amazon IAD-98Operating · 151,000 sq ft footprint
- Amazon IAD-99Operating · 151,000 sq ft footprint
- Amazon IAD-118Operating · 105,800 sq ft footprint
- Amazon IAD-119Operating · 127,300 sq ft footprint
- Amazon IAD-129Operating · 105,900 sq ft footprint
- Amazon IAD-174Operating · 132,600 sq ft footprint
- Amazon IAD-117Operating · 102,600 sq ft footprint
- Amazon IAD-116Operating · 102,800 sq ft footprint
- Amazon IAD-163Operating · 132,100 sq ft footprint
- Amazon IAD-164Operating · 132,600 sq ft footprint
- Amazon IAD-128Under construction · 111,000 sq ft footprint
All claims (provenance audit)
27| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Amazon IAD-601way/1037871048 name=Amazon IAD-601 | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Status | Operating | [2] derived | Confirmed | 2026-09-27 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 21660 Charles View Drive, Sterling, VA 20166 | [1] | Likely | 2026-09-27 | Shown |
| Property owner of record | Cabin Branch Creek LLCMCPI 043482656000: CABIN BRANCH CREEK LLC | [2] | Confirmed | 2026-09-27 | Shown |
| Operator | Amazon Web Servicesoperator=Amazon Web Services | [1] | Likely | 2026-09-27 | Shown |
| Utility | Dominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE | [3] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [4] derived | Likely | — | Shown |
| Balancing authority | PJM | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Paragon Park Substation (230 kV)way/1037852917 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.4 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.04 GW | [5] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.07¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.65 GW | [7] derived | Confirmed | 202502 | Shown |
| Permit / case numbers | B90365580100 | [2] | Confirmed | 2026-09-27 | Shown |
| Permit / case numbers | B90411940100 | [2] | Confirmed | 2026-09-27 | Shown |
| Permit / case numbers | B90299190100 | [2] | Confirmed | 2026-09-27 | Shown |
| Permit / case numbers | B00228780100 | [2] | Confirmed | 2026-09-27 | Shown |
| Floor area | 685,700 sq ft | [2] | Confirmed | 2026-09-27 | Shown |
| Building footprint | 14,400 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| Site area | 54 acres | [2] | Confirmed | 2026-09-27 | Shown |
| Parcel / land records | MCPI 043482656000 (Loudoun County) | [2] | Confirmed | 2026-09-27 | Shown |
| Zoning | IP | [2] | Confirmed | 2026-09-27 | Shown |
| Land use | Data Center | [2] | Confirmed | 2026-09-27 | Shown |