DC
/

Argo Data Center

OperatingUnclassifiedBuildingDickens County, Texas

Part of Coreweave Helios

10% profile completeness
13 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
South Plains Electric Coop INC · ERCOT
Substation: Unnamed substation (345 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Argo Data Center
  2. substation
    Unnamed substation (345 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.47 km away. Proximity does not establish that it serves the site.
  3. transmission
    345 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.35 km away). Not confirmed as the supply path.
  4. utility
    South Plains Electric Coop INC[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    ERCOT[3]
    Service territoryLikely
    Balancing authority: ERCO, SWPP
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

  • Dickens (Batteries, 200 MW) is 1.4 km away[6]
    EIA plant within 1.5 km; proximity does not establish that it supplies the facility
    Battery storageCo-located200 MWUnverified

Location & imagery

Mapped outline
Coordinates
33.77788, -100.86812
County
Dickens County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Lighthouse Electric Coop, INC, AEP Texas North Company.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
ERCOT[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
ERCO, SWPP[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (345 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.5 km[1]Likelyderived
Highest-voltage line nearby
345 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
7.07¢/kWh[5]Confirmed

Texas statewide average, July 2026.

State avg. commercial price
8.47¢/kWh[5]Confirmed

Texas statewide average, July 2026.

Generation within 50 km
876 MW[6]Confirmedderived

7 EIA-reported plants within 50 km.

Generation queued in county
2.32 GW[4]Confirmedderived

9 active generation interconnection requests in Dickens County: Solar 1,102 MW, Storage 922 MW, Wind 293 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
345 kV line · American Electric PowerTransmission line0.35 km345 kV[1]
Dickens · Engie North AmericaPower plant (Batteries)1.4 km200 MW[6]
Mcadoo Wind Energy LLC · Invenergy Services LLCPower plant (Wind)9.6 km150 MW[6]
Wake Wind Energy Center · Southern Power CoPower plant (Wind)22 km257 MW[6]
Whirlwind Energy Center · Whirlwind Energy LLCPower plant (Wind)42.1 km57 MW[6]
Old Settler Wind · Old Settler Wind, LLCPower plant (Wind)43.1 km151 MW[6]
Cotton Plains Wind Farm · Cotton Plains Wind I, LLCPower plant (Wind)43.1 km50 MW[6]
Ralls Wind Farm · Ralls Wind Farm LLCPower plant (Wind)50 km10 MW[6]
Unnamed substationSubstation0.47 km345 kV[1]
Cottonwood Substation · Wind Energy Transmission TexasSubstation0.79 km345 kV[1]
Burksol, LLC substation · Burksol, LLCSubstation0.9 km345 kV[1]
Pitchfork SwitchyardSubstation1.02 km—[1]
Engie North America substation · Engie North AmericaSubstation1.44 km345 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
CORUSCANT BESSERCOT 27INR0195 · AEU Battery Project III LLCStorageIn study · proposed 2027-04418 MW[4]
Spurland Solar IERCOT 29INR0192 · Spurland Solar ISolarIA signed · proposed 2028-12302 MW[4]
Outrider BESSERCOT 28INR0288 · Sanders Hollow Energy Center, LLCStorageIA signed · proposed 2029-06302 MW[4]
Sanders Hollow Energy CenterERCOT 28INR0169 · Sanders Hollow Energy Center, LLCWindIA signed · proposed 2029-06293 MW[4]
Wolf Spring StorageERCOT 25INR0173 · Wolf Spring Solar, LLCStorageIA signed · proposed 2028-08203 MW[4]
Spurland Solar IIERCOT 29INR0195 · Spurland Solar IISolarIA signed · proposed 2028-12202 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Site area
146 acres[1]Likelyderived

Area of the mapped OSM site outline.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

Other buildings on this campus

1

All claims (provenance audit)

13
FieldValueSourceConfidenceAs ofStatus
NameArgo Data Centerway/1490401523 name=Argo Data Center[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
UtilitySouth Plains Electric Coop INCterritory 17561: SOUTH PLAINS ELECTRIC COOP INC (COOPERATIVE, SOUTH PLAINS ELECT[2] derivedUnverified2022Shown
ISO / RTOERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.[3] derivedLikely—Shown
Balancing authorityERCO, SWPP[2] derivedLikely—Shown
Nearest mapped substationUnnamed substation (345 kV)way/1130569621[1] derivedLikely2026-09-28Shown
Distance to substation0.5 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby345 kV[1] derivedLikely2026-09-28Shown
Generation queued in county2.32 GW[4] derivedConfirmed2026-09-01Shown
State avg. industrial price7.07¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price8.47¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km876 MW[6] derivedConfirmed202502Shown
Site area146 acres[1] derivedLikely2026-09-27Shown