Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityArgo Data Center
- →substationUnnamed substation (345 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.47 km away. Proximity does not establish that it serves the site.
- →transmission345 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.35 km away). Not confirmed as the supply path.
- →utilitySouth Plains Electric Coop INC[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
- Dickens (Batteries, 200 MW) is 1.4 km away[6]EIA plant within 1.5 km; proximity does not establish that it supplies the facilityBattery storageCo-located200 MWUnverified
Location & imagery
Mapped outline- Coordinates
- 33.77788, -100.86812
- County
- Dickens County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Lighthouse Electric Coop, INC, AEP Texas North Company.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Texas statewide average, July 2026.
- State avg. commercial price
Texas statewide average, July 2026.
- Generation within 50 km
7 EIA-reported plants within 50 km.
- Generation queued in county
9 active generation interconnection requests in Dickens County: Solar 1,102 MW, Storage 922 MW, Wind 293 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 345 kV line · American Electric Power | Transmission line | 0.35 km | 345 kV | [1] |
| Dickens · Engie North America | Power plant (Batteries) | 1.4 km | 200 MW | [6] |
| Mcadoo Wind Energy LLC · Invenergy Services LLC | Power plant (Wind) | 9.6 km | 150 MW | [6] |
| Wake Wind Energy Center · Southern Power Co | Power plant (Wind) | 22 km | 257 MW | [6] |
| Whirlwind Energy Center · Whirlwind Energy LLC | Power plant (Wind) | 42.1 km | 57 MW | [6] |
| Old Settler Wind · Old Settler Wind, LLC | Power plant (Wind) | 43.1 km | 151 MW | [6] |
| Cotton Plains Wind Farm · Cotton Plains Wind I, LLC | Power plant (Wind) | 43.1 km | 50 MW | [6] |
| Ralls Wind Farm · Ralls Wind Farm LLC | Power plant (Wind) | 50 km | 10 MW | [6] |
| Unnamed substation | Substation | 0.47 km | 345 kV | [1] |
| Cottonwood Substation · Wind Energy Transmission Texas | Substation | 0.79 km | 345 kV | [1] |
| Burksol, LLC substation · Burksol, LLC | Substation | 0.9 km | 345 kV | [1] |
| Pitchfork Switchyard | Substation | 1.02 km | — | [1] |
| Engie North America substation · Engie North America | Substation | 1.44 km | 345 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| CORUSCANT BESSERCOT 27INR0195 · AEU Battery Project III LLC | Storage | In study · proposed 2027-04 | 418 MW | [4] |
| Spurland Solar IERCOT 29INR0192 · Spurland Solar I | Solar | IA signed · proposed 2028-12 | 302 MW | [4] |
| Outrider BESSERCOT 28INR0288 · Sanders Hollow Energy Center, LLC | Storage | IA signed · proposed 2029-06 | 302 MW | [4] |
| Sanders Hollow Energy CenterERCOT 28INR0169 · Sanders Hollow Energy Center, LLC | Wind | IA signed · proposed 2029-06 | 293 MW | [4] |
| Wolf Spring StorageERCOT 25INR0173 · Wolf Spring Solar, LLC | Storage | IA signed · proposed 2028-08 | 203 MW | [4] |
| Spurland Solar IIERCOT 29INR0195 · Spurland Solar II | Solar | IA signed · proposed 2028-12 | 202 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Site area
Area of the mapped OSM site outline.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
1- Coreweave HeliosOperating + expanding
All claims (provenance audit)
13| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Argo Data Centerway/1490401523 name=Argo Data Center | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Utility | South Plains Electric Coop INCterritory 17561: SOUTH PLAINS ELECTRIC COOP INC (COOPERATIVE, SOUTH PLAINS ELECT | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | ERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC. | [3] derived | Likely | — | Shown |
| Balancing authority | ERCO, SWPP | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (345 kV)way/1130569621 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.5 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 2.32 GW | [4] derived | Confirmed | 2026-09-01 | Shown |
| State avg. industrial price | 7.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 8.47¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 876 MW | [6] derived | Confirmed | 202502 | Shown |
| Site area | 146 acres | [1] derived | Likely | 2026-09-27 | Shown |