Data centers in Dickens County, Texas
Datacenter Source tracks 2 data centers in Dickens County, Texas. Facilities that disclose power add up to 200 MW online and 600 MW in the pipeline — floors, since 50% report a figure.
Follow
Get changes to Dickens County, Texas
Or subscribe in a feed reader: RSS / Atom
Facilities
- Coreweave Helios AI campus · AftonOperating + expanding200 MW AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.+600 MW pipeline EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Argo Data Center UnclassifiedOperating
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
No dated queue filings for this county in the files we ingest (some ISOs don't publish a county or filing date).
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
Not yet collected
2 sites with documented on-site generation (MW not reported)
Not yet collected
Not yet collected for this state's utilities.
Not yet collected
Recent changes
- Aug 30, 2026 · Coreweave Helios EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 0 → 1
- Aug 30, 2026 · Coreweave Helios EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Under construction → Operating + expanding
- Aug 30, 2026 · Coreweave Helios EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Building 1 operational at full capacity. This is based on "Phase I", which is expected to be operational by the end of the first half of 2026. We added two months of overhead to account for remaining construction and/…
- May 31, 2025 · Coreweave Helios EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Construction started: The former crypto mining Helios site begins expanding, with land cleared for additional buildings.