AVAIO Digital Brandon

UnknownUnclassifiedCampusBrandon, Rankin County, Mississippi
0% profile completeness
9 claims from 5 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
H2 2027 – H2 2028
Medium confidencewindow, not a prediction
Project verification
Grid-backed
Interconnection agreement / service contract documented by utility filing / announcement.
Current stage
Interconnection agreement / service contract
Furthest stage with documented evidence
Utility · ISO
Entergy · MISO
Substation: Not identified

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
116 MW[1]
Reported utility / power contract
Under construction
No record
Operational
No record
  • ⚠ No recorded land acquisition found.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: Interconnection agreement / service contract (furthest stage with documented evidence)[1]
  • Stated date: Stated energization date: 2027[1]
Assumptions
  • From “Interconnection agreement / service contract”, large loads have typically taken 0.75–2.5 more years to first power (editorial range; see Methodology).
  • Stated dates slip; the window allows up to 1.25 years past the stated date at this stage.
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H2 2027 – H2 2028

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contractSep 11, 2026
    Utility filing / announcement
    • Sep 11, 2026 · Contracted / committed power: 116 MW[1]
Build & energization
  1. Financing
  2. Under construction
  3. Energization
  4. Operational

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Utility filing / announcement.

Grid path

  1. facility
    AVAIO Digital Brandon
  2. substation
    Not identified
    UnknownUnverified
    No substation mapped within 3 km and none named in filings.
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    Entergy[1]
    DocumentedConfirmed
    Named in a source
  5. ISO / RTO
    MISO[2]
    Service territoryLikely
    Balancing authority: MISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

County-level (approximate)

Location is approximate (county-level (approximate)); the marker does not identify the exact site.

Coordinates
32.26341, -89.94762
County
Rankin County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Developer

“AVAIO Digital / Data Center Brandon, MS”

Utility
Entergy[1]Confirmed

“AVAIO Digital / Data Center Brandon, MS” Listed by EEI under this member utility.

No tenants or end users identified in our sources yet.

Power (all fields)

Contracted / committed power
116 MW[1]Likely

“116 MW available in first phase in 2027.”

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
MISO[2]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
MISO[3]Likelyderived

Control area of the containing utility territory.

Contracted / committed power
116 MW[1]Likely

“116 MW available in first phase in 2027.”

State avg. industrial price
7.66¢/kWh[4]Confirmed

Mississippi statewide average, July 2026.

State avg. commercial price
13.65¢/kWh[4]Confirmed

Mississippi statewide average, July 2026.

Generation within 50 km
753 MW[5]Confirmedderived

5 EIA-reported plants within 50 km.

Interconnection status
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Lineage Ms · Madison Energy Holdings LLCPower plant (Solar)19.6 km1 MW[5]
Mississippi Baptist Medical Center · Mississippi Baptist MedicalPower plant (Natural Gas)22.5 km4 MW[5]
Hinds Energy Facility · Entergy Mississippi LLCPower plant (Natural Gas)28.6 km473 MW[5]
Ragsdale Solar LLC · Ragsdale Solar, LLCPower plant (Solar)32.5 km100 MW[5]
Pearl River Solar Park LLC · Pearl River Solar Park, LLCPower plant (Solar)37.9 km175 MW[5]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

9
FieldValueSourceConfidenceAs ofStatus
DeveloperAVAIO Digital[1] Confirmed2026-09-11Shown
UtilityEntergy[1] Confirmed2026-09-11Shown
Contracted / committed power116 MW[1] Likely2026-09-11Shown
ISO / RTOMISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC..[2] derivedLikely—Shown
Balancing authorityMISO[3] derivedLikely—Shown
State avg. industrial price7.66¢/kWh[4] Confirmed2026-07Shown
State avg. commercial price13.65¢/kWh[4] Confirmed2026-07Shown
Generation within 50 km753 MW[5] derivedConfirmed202502Shown
Expected energization2027[1] Likely2026-09-11Shown