DC
/

Mississippi

Facilities
9
4 campuses
Power online
614 MW
2 sites reporting
Under construction
1.21 GW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
3
614 MW online · 1.21 GW pipeline
AI compute
0.39M
H100-equivalents (est.)
Capital (reported + est.)
$19.4B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 7.66¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW500 MW1 GW1.5 GW2 GW2026202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2027
2028

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced2.33 GW
  • Interconnection requests—
  • Contracted / approved116 MW
  • Under construction1.21 GW
  • Operational614 MW

500 MW announced at 1 site has no grid, construction or operating record yet.

Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented
Verified operating: 2Grid-backed: 1Announced only: 1Unverified: 5

Interconnection queues

Active requests to connect to the grid (MISO). Requests are applications, not commitments — most never get built.

Generation seeking interconnection9.53 GW · 54 requests
Solar 4.28 GWHybrid 2.14 GWStorage 1.32 GWGas 920 MWWind 784 MWUnknown 96 MW

Markets

Click through to drill down

Online Under construction + planned
NameFacilitiesOnlinePipeline
Central Mississippi7614 MW1.21 GW
Memphis1——

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned

None identified.

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • MISO614 MW + 1.21 GW · 8 sites
  • None (non-RTO region)— · 1 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
Amazon RidgelandOperating + expanding273 MW735 MW
Amazon Madison Mega SiteOperating + expanding341 MW478 MW

Facilities by status

  • Operating5
  • Operating + expanding2
  • Unknown2