Central Mississippi
Market boundary: facilities within 50 km of the metro center (editorial definition).
Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned.
Construction pipeline by expected completion
MW from phases with a projected completion date
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced1.83 GW
- Interconnection requests—
- Contracted / approved116 MW
- Under construction1.21 GW
- Operational614 MW
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Interconnection queues
Active requests to connect to the grid (MISO). Requests are applications, not commitments — most never get built.
Largest operators & owners
Online + pipeline MW at linked facilities
- Amazon Web Services614 MW + 1.21 GW · 6 sites
- AVAIO Digital— · 1 sites
Largest customers & end users
Tenants and workload owners, where sourced
None identified.
Utility exposure
Most likely retail utility by location (approximate)
- Entergy614 MW + 1.21 GW · 7 sites
Grid operators (ISO / RTO)
By facility location
- MISO614 MW + 1.21 GW · 7 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| Amazon Ridgeland | Operating + expanding | 273 MW | 735 MW |
| Amazon Madison Mega Site | Operating + expanding | 341 MW | 478 MW |
Facilities by status
- Operating4
- Operating + expanding2
- Unknown1
Campuses & sites (3)
Campus pages list their buildings
- Amazon Ridgeland273 MW online · 735 MW pipeline
- Amazon Madison Mega Site341 MW online · 478 MW pipeline
- AVAIO Digital Brandoncampus