AWS
Part of Amazon Web Services — Sterling, VA campus
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- PermittingSep 27, 2026
Permit / site plan
- Sep 27, 2026 · Permit / case B70267480100[2]
- Sep 27, 2026 · Permit / case B80220930100[2]
- Sep 27, 2026 · Permit / case B00261830100[2]
- Sep 27, 2026 · Permit / case B50456040100[2]
- Sep 27, 2026 · Permit / case B90305250100[2]
- Sep 27, 2026 · Permit / case B00327600100[2]
- Sep 27, 2026 · Permit / case B10481290100[2]
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Permit / site plan, Community map.
Grid path
- →facilityAWS (IAD93)
- →substationEvergreen Mills Switching Station (230 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.46 km away. Proximity does not establish that it serves the site.
- →transmission500 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.01 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 38.94654, -77.52219
- Address
- County
- Loudoun County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of record
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Property owner of record
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Virginia statewide average, July 2026.
- State avg. commercial price
Virginia statewide average, July 2026.
- Generation within 50 km
52 EIA-reported plants within 50 km.
- Generation queued in county
11 active generation interconnection requests in Loudoun County: Storage 940 MW, Solar 100 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 2137;2183 · Dominion Energy | Transmission line | 0.22 km | 230 kV | [1] |
| 2172;2209 · Virginia Electric & Power Company | Transmission line | 0.27 km | 230 kV | [1] |
| 230 kV line · Virginia Electric & Power Company | Transmission line | 0.38 km | 230 kV | [1] |
| 2213;2172 · Virginia Electric & Power Company | Transmission line | 0.52 km | 230 kV | [1] |
| 2209 · Virginia Electric & Power Company | Transmission line | 0.52 km | 230 kV | [1] |
| 500 kV line | Transmission line | 1.01 km | 500 kV | [1] |
| Potomac Energy Center, LLC · Potomac Energy Center LLC | Power plant (Natural Gas) | 12.6 km | 766 MW | [7] |
| Montgomery County Resource Recovery · Covanta Montgomery, Inc. | Power plant (Biomass) | 28.8 km | 54 MW | [7] |
| Dickerson Power · Dickerson Power, LLC | Power plant (Natural Gas) | 29.7 km | 299 MW | [7] |
| Covanta Fairfax Energy · Covanta Fairfax Inc | Power plant (Biomass) | 37.1 km | 98 MW | [7] |
| Covanta Alexandria/Arlington Energy · Covanta Alexandria/Arlington | Power plant (Biomass) | 37.7 km | 29 MW | [7] |
| Blake Solar Plant · Horus West Virginia 1, LLC | Power plant (Solar) | 44.3 km | 80 MW | [7] |
| Central Utility Plant At White Oak · GSA Metropolitan Service Center | Power plant (Natural Gas) | 47.8 km | 54 MW | [7] |
| Remington · Virginia Electric & Power Co | Power plant (Natural Gas) | 49.7 km | 604 MW | [7] |
| Evergreen Mills Switching Station · Virginia Electric & Power Company | Substation | 0.46 km | 230 kV | [1] |
| Yardley Ridge Substation · NOVEC | Substation | 0.46 km | 230 kV | [1] |
| Yardley Ridge Substation · Virginia Electric & Power Company | Substation | 0.52 km | 230 kV | [1] |
| Unnamed substation | Substation | 0.62 km | 230 kV | [1] |
| Unnamed substation | Substation | 1.54 km | 230 kV | [1] |
| Unnamed substation | Substation | 1.6 km | 230 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Loudoun 230 kVPJM AG2-285 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| Beaumeade 230 kVPJM AG2-287 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| New Road StoragePJM AE2-019 | Storage | IA signed · proposed 2026-12 | 120 MW | [5] |
| Dulles SolarPJM AF1-147 | Solar | IA signed · proposed 2023-12 | 100 MW | [5] |
| Roundtable 230 kVPJM AG2-307 | Storage | In study · proposed 2023-12 | 100 MW | [5] |
| Shelhorn 230 kVPJM AG2-323 | Storage | In study · proposed 2023-12 | 100 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
- Permit / case numbers
- B70267480100, B80220930100, B00261830100, B50456040100, B90305250100, B00327600100, B10481290100[2]Confirmed
Real estate
None sourced yet
None sourced yet
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 162392026000 Loudoun County, VA | AMAZON DATA SERVICES INC Project: Icsp @ Arcola | 63.54 | GI · Data Center | 710,921 built | [2] |
- Site area
Legal acreage of the parcel(s).
- Zoning
- Land use
- Annual property tax
- Not yet sourced
Size
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
6- Amazon IAD-62Operating · 150,200 sq ft footprint
- Amazon IAD-68Operating · 182,100 sq ft footprint
- Amazon IAD-81Operating · 185,200 sq ft footprint
- Amazon IAD-83Operating · 156,400 sq ft footprint
- AWSOperating · 14,300 sq ft footprint
- AWSOperating · 13,600 sq ft footprint
All claims (provenance audit)
30| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | AWSway/990537821 name=AWS | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Status | Operating | [2] derived | Confirmed | 2026-09-27 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 42770 Main Marconi Lane, Sterling, VA 20166 | [1] | Likely | 2026-09-27 | Shown |
| Property owner of record | Amazon Web ServicesMCPI 162392026000: AMAZON DATA SERVICES INC | [2] | Confirmed | 2026-09-27 | Shown |
| Operator | Amazon Web Servicesoperator=Amazon Web Services | [1] | Likely | 2026-09-27 | Shown |
| Utility | Dominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE | [3] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [4] derived | Likely | — | Shown |
| Balancing authority | PJM | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Evergreen Mills Switching Station (230 kV)way/990537802 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.5 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 500 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.04 GW | [5] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.07¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 2.2 GW | [7] derived | Confirmed | 202502 | Shown |
| Permit / case numbers | B70267480100 | [2] | Confirmed | 2026-09-27 | Shown |
| Permit / case numbers | B80220930100 | [2] | Confirmed | 2026-09-27 | Shown |
| Permit / case numbers | B00261830100 | [2] | Confirmed | 2026-09-27 | Shown |
| Permit / case numbers | B50456040100 | [2] | Confirmed | 2026-09-27 | Shown |
| Permit / case numbers | B90305250100 | [2] | Confirmed | 2026-09-27 | Shown |
| Permit / case numbers | B00327600100 | [2] | Confirmed | 2026-09-27 | Shown |
| Permit / case numbers | B10481290100 | [2] | Confirmed | 2026-09-27 | Shown |
| Floor area | 710,900 sq ft | [2] | Confirmed | 2026-09-27 | Shown |
| Building footprint | 16,800 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| Site area | 63.5 acres | [2] | Confirmed | 2026-09-27 | Shown |
| Parcel / land records | MCPI 162392026000 (Loudoun County) | [2] | Confirmed | 2026-09-27 | Shown |
| Zoning | GI | [2] | Confirmed | 2026-09-27 | Shown |
| Land use | Data Center | [2] | Confirmed | 2026-09-27 | Shown |