Blockfusion data center — 1999 Frontier Avenue
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityBlockfusion data center — 1999 Frontier Avenue
- →substationNational Grid substation (115 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 2.13 km away. Proximity does not establish that it serves the site.
- →transmission115 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.2 km away). Not confirmed as the supply path.
- →utilityNiagara Mohawk Power Corp.[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 43.07489, -78.94474
- Address
- County
- Niagara County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
New York statewide average, July 2026.
- State avg. commercial price
New York statewide average, July 2026.
- Generation within 50 km
47 EIA-reported plants within 50 km.
- Generation queued in county
2 active generation interconnection requests in Niagara County: Solar 225 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 115 kV line · National Grid | Transmission line | 1.2 km | 115 kV | [1] |
| Reworld Niagara I · Reworld Niagara I, LLC | Power plant (Biomass) | 5 km | 36 MW | [6] |
| World Generation X · North American Energy Services | Power plant (Natural Gas) | 8 km | 52 MW | [6] |
| Lewiston Niagara · New York Power Authority | Power plant (Pumped Storage) | 9.8 km | 240 MW | [6] |
| Robert Moses Niagara · New York Power Authority | Power plant (Hydroelectric) | 10.8 km | 2.44 GW | [6] |
| Indeck Yerkes Energy Center · Indeck-Yerkes Ltd Partnership | Power plant (Natural Gas) | 12.2 km | 43 MW | [6] |
| Lockport Energy Associates LP · Lockport Energy Associates LP | Power plant (Natural Gas) | 18.9 km | 219 MW | [6] |
| Steel Winds Wind Farm · Evergreen Wind, LLC | Power plant (Wind) | 29.4 km | 20 MW | [6] |
| Ny6 Battery · Key Capture Energy | Power plant (Batteries) | 31.6 km | 20 MW | [6] |
| National Grid substation · National Grid | Substation | 2.13 km | 115 kV | [1] |
| Military Road Station 210 · National Grid | Substation | 2.94 km | 115 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Somerset SolarNYISO 1079 · Somerset Solar, LLC | Solar | IA signed · proposed 2028-06 | 125 MW | [4] |
| Bear Ridge SolarNYISO 0704 · Bear Ridge Solar, LLC | Solar | IA signed · proposed 2028-04 | 100 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational2019[1]
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 1999 Frontier Avenue, Niagara Falls, NY 14304 | [1] | Likely | 2026-09-27 | Shown |
| Operator | Blockfusionoperator=Blockfusion | [1] | Likely | 2026-09-27 | Shown |
| Utility | Niagara Mohawk Power Corp.territory 13573: NIAGARA MOHAWK POWER CORP. (INVESTOR OWNED, NATIONAL GRID GROUP | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | NYISONEW YORK INDEPENDENT SYSTEM OPERATOR | [3] derived | Likely | — | Shown |
| Balancing authority | NYIS | [2] derived | Likely | — | Shown |
| Nearest mapped substation | National Grid substation (115 kV)way/128367241 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 2.1 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 115 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 225 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.81¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 24.18¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 3.24 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 16,300 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| First operational | 2019start_date=2019 | [1] | Likely | 2026-09-27 | Shown |