- Anthropic Lake Mariner AI campus · BarkerOperating + expanding49 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.+392 MW pipeline EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Core42 Lake Mariner AI campus · BarkerOperating58 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Blockfusion data center — 1999 Frontier Avenue Unclassified · Niagara FallsOperating
- Blockfusion Niagra Falls Unclassified · Niagara FallsOperating
- Blockfusion Niagra Falls Unclassified · Niagara FallsOperating
- Blockfusion Niagra Falls Unclassified · Niagara FallsOperating
- Blockfusion Niagra Falls Unclassified · Niagara FallsOperating
- Blockfusion Niagra Falls Unclassified · Niagara FallsOperating
- Blockfusion Niagra Falls Unclassified · Niagara FallsOperating
- Blockfusion Niagra Falls Unclassified · Niagara FallsOperating
- Blockfusion Niagra Falls Unclassified · Niagara FallsOperating
- Blockfusion Niagra Falls Unclassified · Niagara FallsOperating
- Blockfusion Niagra Falls Unclassified · Niagara FallsOperating
- Blockfusion Niagra Falls Unclassified · Niagara FallsOperating
- Globe Digital Holdings - 1 UnclassifiedPlanned
- Niagara Digital Campus UnclassifiedPlanned
- North East Data LLC Data Center UnclassifiedPlanned
- US Bitcoin data center UnclassifiedOperating
- Wulf Compute Data Center II UnclassifiedPlanned
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
- Oct 17, 2025 · NYISO 1747 Load request (Data center (AI)) — Globe Digital Holdings - 1192 MW · Status 4 (SRIS/SIS pending); proposed initial backfeed: 10-2028 ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
- Aug 29, 2025 · NYISO 1741 Load request (Data center) — North East Data LLC Data Center500 MW · Status 4 (SRIS/SIS pending); proposed initial backfeed: 12-2029 ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
- Mar 29, 2025 · NYISO 1732 Load request (Data center (AI)) — Wulf Compute Data Center II250 MW · Status 5 (SRIS/SIS in progress); proposed initial backfeed: 07-2030 ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
0 M gal/day modeled at 2 sites EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
11 sites with documented on-site generation (MW not reported)
Not yet collected
Not yet collected for this state's utilities.
Not yet collected
Recent changes
- Jul 23, 2026 · Core42 Lake Mariner EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Operating + expanding → Operating
- May 31, 2026 · Anthropic Lake Mariner EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 0 → 1
- May 31, 2026 · Anthropic Lake Mariner EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Under construction → Operating + expanding
- May 31, 2026 · Anthropic Lake Mariner EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Building 1 is operational. On February 26, Terawulf stated that CB3 was expected to be energized by mid-May 2026. A drone video commissioned from RAAD shows several cooling units operating on May 8. It's therefore lik…
- Mar 31, 2026 · Core42 Lake Mariner EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current IT capacity: 16 MW → 58 MW
- Mar 31, 2026 · Core42 Lake Mariner EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current facility power: 19 MW → 58 MW
- Mar 31, 2026 · Core42 Lake Mariner EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 1 → 2
- Mar 31, 2026 · Core42 Lake Mariner EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Building 2 is operational. On February 26, Terawulf stated that CB2A is operational, presumably making up half the final capacity. CB2B was expected in March 2026. However, it's notable that a drone video commissioned…
- Oct 17, 2025 · Globe Digital Holdings - 1 ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. Permit / site plan filed: NYISO load interconnection request 1747 filed (192 MW).
- Oct 1, 2025 · Core42 Lake Mariner EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 0 → 1
- Oct 1, 2025 · Core42 Lake Mariner EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Under construction → Operating + expanding
- Oct 1, 2025 · Core42 Lake Mariner EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Building 1 is operational. Based on Terawulf saying "As of September 30, 2025, the site has energized 245 MW of Bitcoin-mining capacity and 22.5 MW of HPC capacity." The small "Wulf Den" building was said to be 2 MW o…