Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Community map.
Grid path
- →facilityCloudHQ MCC3
- →substationClover Hill Substation (230 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.62 km away. Proximity does not establish that it serves the site.
- →transmission230 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.66 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 38.71489, -77.49525
- Address
- County
- Prince William County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of record
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Property owner of record
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Virginia statewide average, July 2026.
- State avg. commercial price
Virginia statewide average, July 2026.
- Generation within 50 km
42 EIA-reported plants within 50 km.
- Generation queued in county
16 active generation interconnection requests in Prince William County: Storage 1,350 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line | Transmission line | 0.66 km | 230 kV | [1] |
| 2132;2148 · Virginia Electric and Power Company | Transmission line | 0.83 km | 230 kV | [1] |
| Covanta Fairfax Energy · Covanta Fairfax Inc | Power plant (Biomass) | 22.2 km | 98 MW | [7] |
| Possum Point · Virginia Electric & Power Co | Power plant (Natural Gas) | 27.2 km | 645 MW | [7] |
| Remington · Virginia Electric & Power Co | Power plant (Natural Gas) | 30.6 km | 604 MW | [7] |
| Marsh Run Generation Facility · Old Dominion Electric Coop | Power plant (Natural Gas) | 31.5 km | 481 MW | [7] |
| Covanta Alexandria/Arlington Energy · Covanta Alexandria/Arlington | Power plant (Biomass) | 33.2 km | 29 MW | [7] |
| Potomac Energy Center, LLC · Potomac Energy Center LLC | Power plant (Natural Gas) | 38.4 km | 766 MW | [7] |
| Ripley · MN8 Energy LLC | Power plant (Solar) | 40 km | 28 MW | [7] |
| Nih Cogeneration Facility · National Institutes of Health | Power plant (Natural Gas) | 47 km | 28 MW | [7] |
| Clover Hill Substation | Substation | 0.62 km | 230 kV | [1] |
| Wakeman Substation | Substation | 1.95 km | 230 kV | [1] |
| Winters Branch Substation | Substation | 2.26 km | 230 kV | [1] |
| Brickyard Substation | Substation | 2.39 km | 230 kV | [1] |
| City of Manassas - (VA) substation · City of Manassas - (VA) | Substation | 2.43 km | 13.2 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Gainesville-Loudoun 230 kVPJM AI2-231 | Storage | In study · proposed 2023-10 | 200 MW | [5] |
| Nokesville-Vint Hill 230 kVPJM AG2-113 | Storage | In study · proposed 2022-08 | 150 MW | [5] |
| Catharpin 230 kVPJM AG2-284 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| Liberty 230 kVPJM AG2-304 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| Possum Point 230 kVPJM AG2-306 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| Possum Point 230kVPJM AH2-034 | Storage | In study · proposed 2028-12 | 100 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquiredOct 2, 2020[2]
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 7694-95-7303.00 Prince William County, VA | MANUCHEHR VENTURES LLC ATTN GENERAL COUNSEL 1212 NEW YORK AVE NW STE 1000, WASHINGTON, DC | 9.78 | Use code 191 | — | [2] |
- Site area
Sum of county land area across parcels.
- Land use
- Annual property tax
- Not yet sourced
Size
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
- Oct 2, 2020[2]
Deed recorded for parcel 7694-95-7303.00 (owner of record: Manuchehr Ventures LLC Attn General Counsel).
Other buildings on this campus
2- CloudHQ MCC1Operating · 400,500 sq ft footprint
- CloudHQ MCC2Operating · 351,600 sq ft footprint
All claims (provenance audit)
22| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | CloudHQ MCC3way/1227614670 name=CloudHQ MCC3 | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | https://cloudhq.com/location/mcc-campus/ | [1] | Likely | 2026-09-27 | Shown |
| Address | 10900 Airman Avenue, Manassas, VA 20110 | [1] | Likely | 2026-09-27 | Shown |
| Property owner of record | Manuchehr Ventures LLC Attn General CounselParcel 7694-95-7303.00: MANUCHEHR VENTURES LLC ATTN GENERAL COUNSEL | [2] | Confirmed | 2026-09-27 | Shown |
| Operator | CloudHQoperator=CloudHQ | [1] | Likely | 2026-09-27 | Shown |
| Utility | Dominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE | [3] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [4] derived | Likely | — | Shown |
| Balancing authority | PJM | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Clover Hill Substation (230 kV)way/708149644 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.6 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.35 GW | [5] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.07¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 2.86 GW | [7] derived | Confirmed | 202502 | Shown |
| Building footprint | 123,100 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| Site area | 9.8 acres | [2] | Confirmed | 2026-09-27 | Shown |
| Parcel / land records | 7694-95-7303.00 (Prince William County) | [2] | Confirmed | 2026-09-27 | Shown |
| Land use | Use code 191 | [2] | Confirmed | 2026-09-27 | Shown |
| Land acquired | Oct 2, 2020 | [2] derived | Confirmed | 2026-09-27 | Shown |