CoreWeave Muskogee OK

Under constructionAI campusCampusMuskogee, Muskogee County, Oklahoma
60% profile completeness
24 claims from 9 sources
Current facility power
Not yet sourced
Planned capacity
181 MW[1]
Likelyestimated
Floor area
Not yet sourced
Buildings (planned)
Likelyderived
Capital cost / investment
Not yet sourced
First operational
Dec 31, 2026[1]
Speculativeestimated

POWER & GRID

Time-to-power · verification · interconnection
Time to power
H1 2027 – H2 2027
Medium confidencewindow, not a prediction
Project verification
Under construction
Construction documented by satellite imagery.
Current stage
Under construction
Furthest stage with documented evidence
Utility · ISO
Oklahoma Gas & Electric CO · SPP
Substation: On-site substation

Power reality

Announced
181 MW[1]
Research estimate of planned capacity (no company figure found)
Interconnection request
No record
Contracted / approved
No record
Under construction
181 MW[1]
Building 1, Building 2 under construction (satellite-tracked phases)
Operational
No record
  • ⚠ No public interconnection record for this load — SPP does not publish large-load requests.
  • ⚠ No permit record linked to this site yet.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: Under construction (furthest stage with documented evidence)[1]
  • Construction elapsed: Construction documented since 2024-11-18 (1.9 years).
  • Stated date: Next projected milestone: 2026-12-31 (modeled/speculative)[1]
  • Required: 181 MW
Assumptions
  • From “Under construction”, large loads have typically taken 0.5–2 more years to first power (editorial range; see Methodology).
  • Construction to first power typically takes 1.25–2.5 years.
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H1 2027 – H2 2027

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionNov 18, 2024
    Model estimate · Satellite imagery
    • Nov 18, 2024 · Reported status: under construction[1]
    • Nov 18, 2024 · Construction start[1]
    • Nov 18, 2024 · Core Scientific, CoreWeave, and Port Muskogee publicly announce groundbreaking for the 100 MW Muskogee HPC data center. Core Scientific [says](https://investors.corescientific.com/[1]
  3. Energization
  4. Operational

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.

Grid path

  1. facility
    CoreWeave Muskogee OK
  2. substation
    On-site substation[1]
    Satellite imageryLikely
    2 substation outlines traced inside the campus on satellite imagery
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    Oklahoma Gas & Electric CO[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    SPP[3]
    Service territoryLikely
    Balancing authority: SWPP
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
35.69569, -95.38647
Address
1525 W 43rd St S, Muskogee, OK 74401, USA[1]Likely
County
Muskogee County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    OpenAI[1]Speculative
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Owner
CoreWeave[1]Confirmed
End user
OpenAI[1]Speculative
Utility

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: East Central Oklahoma Elec Coop INC.

Power (all fields)

Planned capacity
181 MW[1]Likelyestimated

Projected facility power at the last tracked milestone (2027-12-31); not necessarily full build-out.

Current facility power
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
SPP[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
SWPP[2]Likelyderived

Control area of the containing utility territory.

State avg. industrial price
8.16¢/kWh[5]Confirmed

Oklahoma statewide average, July 2026.

State avg. commercial price
10.32¢/kWh[5]Confirmed

Oklahoma statewide average, July 2026.

Generation within 50 km
2.93 GW[6]Confirmedderived

7 EIA-reported plants within 50 km.

Generation queued in county
1.37 GW[4]Confirmedderived

6 active generation interconnection requests in Muskogee County: Solar 890 MW, Storage 475 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Georgia-Pacific Muskogee · Georgia-Pacific Muskogee LLCPower plant (Natural Gas)9.3 km68 MW[6]
Muskogee · Oklahoma Gas & Electric CoPower plant (Natural Gas)11.5 km1.51 GW[6]
Fort Gibson · USCE-Tulsa DistrictPower plant (Hydroelectric)24.1 km51 MW[6]
Webbers Falls · USCE-Tulsa DistrictPower plant (Hydroelectric)25.1 km75 MW[6]
Tenkiller Ferry · USCE-Tulsa DistrictPower plant (Hydroelectric)32.3 km42 MW[6]
Eufaula Dam · USCE-Tulsa DistrictPower plant (Hydroelectric)43.3 km95 MW[6]
Oneta Energy Center · Oneta Power LLCPower plant (Natural Gas)44.9 km1.09 GW[6]
Largest queued generation in this countyFuelQueue statusMWSource
GEN-2024-268 at Keefton 345 kV SubstationSPP GEN-2024-268SolarIn study · proposed 2030-12390 MW[4]
GEN-2026-SR27 at Pecan Creek 345kV SubstationSPP GEN-2026-SR27StorageIn study · proposed 2028-06300 MW[4]
GEN-2021-053 at Pecan Creek 345 kV SubstationSPP GEN-2021-053SolarIA signed · proposed 2031-06300 MW[4]
GEN-2017-092 at Canadian River-Muskogee and Muskogee-Seminole 345kVSPP GEN-2017-092SolarIA signed · proposed 2026-12200 MW[4]
GEN-2018-024 at Canadian River-Muskogee and Muskogee-Seminole 345kVSPP GEN-2018-024StorageIA signed · proposed 2028-12100 MW[4]
GEN-2021-052 at Pecan Creek 345kV substationSPP GEN-2021-052StorageIA signed · proposed 2031-0675 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    Nov 18, 2024[1]
  5. First operational
    Dec 31, 2026[1]
    Projected
  6. Expected completion
    Dec 31, 2027[1]
    Projected
Planned capacity
181 MW[1]Likelyestimated

Projected facility power at the last tracked milestone (2027-12-31); not necessarily full build-out.

Buildings (planned)
1[1]Likelyderived

Count of building outlines traced on satellite imagery.

Buildings operational
0[1]Likelyestimated
PhaseStatusAdded MWCompleted / expectedSource
Building 1under construction98 MWDec 31, 2026 (projected)[1]
Building 2under construction83 MWDec 31, 2027 (projected)[1]

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

Compute

Chip types
B300[1]Confirmed

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

Construction start: Nov 18, 2024[1]
First operational: Dec 31, 2026[1]
  1. Nov 18, 2024[1]

    Core Scientific, CoreWeave, and Port Muskogee publicly announce groundbreaking for the 100 MW Muskogee HPC data center. Core Scientific says the site will provide about 70 MW of critical IT load for CoreWeave's NVIDIA GPUs.

  2. Apr 9, 2026[1]

    Based on satellite imagery, Building 1 looks mostly complete, but the site still appears to be in construction or commissioning. Not much progress has happened in the past 4 months, and a Q2 2026 finish seems unlikely.

  3. Jun 13, 2026[1]

    Based on satellite imagery, Building 1 has completed construction, with adjacent land cleared for what we're assuming will have power substations/generators. We can assume Building 1 is not operational from all the yard work directly surrounding it, and the lack of a parking lot. Building 2 (The one not leased to CoreWeave) is still in land clearing phase.

  4. Dec 31, 2026Projected98 MW facility power· 1 buildings operational[1]

    Estimating building 1 is operational by the end of the year, judging from the building currently completed, the completed power substation to the southwest. The surrounding yard work/construction will likely still take several months, judging from the slow pace.

  5. Dec 31, 2027Projected181 MW facility power· 2 buildings operational[1]

    Core Scientific expects initial delivery of the second, unleased 82.5 MW Muskogee building in Q4 2027. Not signed to have CoreWeave GPUs as of yet, but may change in the future. Source: https://www.sec.gov/Archives/edgar/data/1839341/000162828026030918/exhibit991polarispressre.htm

All claims (provenance audit)

24
FieldValueSourceConfidenceAs ofStatus
NameCoreWeave Muskogee OK[1] Likely2026-06-13Shown
StatusUnder construction[1] derivedLikely2024-11-18Superseded / alternative
StatusUnder construction[1] derivedLikely2026-04-09Superseded / alternative
StatusUnder construction[1] derivedLikely2026-06-13Shown
Facility typeAI campus[1] derivedLikely2026-06-13Shown
Address1525 W 43rd St S, Muskogee, OK 74401, USA[1] Likely2026-06-13Shown
OwnerCoreWeaveOwner: CoreWeave[1] Confirmed2026-06-13Shown
End usersOpenAIUsers: OpenAI[1] Speculative2026-06-13Shown
UtilityOklahoma Gas & Electric COterritory 14063: OKLAHOMA GAS & ELECTRIC CO (INVESTOR OWNED, OG&E ENERGY)[2] derivedUnverified2022Shown
Planned capacity181 MW[1] estimatedLikely2026-06-13Shown
ISO / RTOSPPSOUTHWEST POWER POOL[3] derivedLikely—Shown
Balancing authoritySWPP[2] derivedLikely—Shown
Generation queued in county1.37 GW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price8.16¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price10.32¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km2.93 GW[6] derivedConfirmed202502Shown
Buildings (planned)1[1] derivedLikely2026-06-13Shown
Buildings operational0[1] estimatedLikely2026-06-13Shown
Buildings operational0[1] estimatedLikely2024-11-18Superseded / alternative
Buildings operational0[1] estimatedLikely2026-04-09Superseded / alternative
Chip typesB300[1] Confirmed2026-06-13Shown
Construction startNov 18, 2024[1] derivedLikely2026-06-13Shown
First operationalDec 31, 2026[1] estimatedSpeculative2026-06-13Shown
Expected completionDec 31, 2027[1] estimatedSpeculative2026-06-13Shown