CyrusOne NYM7
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityCyrusOne NYM7
- →substationMyers Corner Substation (69 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.35 km away. Proximity does not establish that it serves the site.
- →transmission69 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.35 km away). Not confirmed as the supply path.
- →utilityCentral Hudson Gas & Elec Corp[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 41.59909, -73.88220
- Address
- County
- Dutchess County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
New York statewide average, July 2026.
- State avg. commercial price
New York statewide average, July 2026.
- Generation within 50 km
80 EIA-reported plants within 50 km.
- Generation queued in county
1 active generation interconnection requests in Dutchess County: Storage 205 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 69 kV line | Transmission line | 0.35 km | 69 kV | [1] |
| Danskammer Generating Station · Danskammer Energy | Power plant (Natural Gas) | 7.4 km | 502 MW | [6] |
| Roseton Generating Facility · CCI Roseton LLC | Power plant (Natural Gas) | 7.5 km | 1.22 GW | [6] |
| Cricket Valley Energy · Cricket Valley Energy Center LLC | Power plant (Natural Gas) | 26.4 km | 1.02 GW | [6] |
| Wheelabrator Westchester · Wheelabrator Environmental Systems | Power plant (Biomass) | 36.2 km | 51 MW | [6] |
| Rocky River (Ct) · FirstLight Power Resources Services LLC | Power plant (Pumped Storage) | 37.2 km | 29 MW | [6] |
| Kimberly Clark-Unit 1,2,3 · Kimberly-Clark Corporation | Power plant (Natural Gas) | 39.2 km | 33 MW | [6] |
| Bowline Point · Bowline, LLC | Power plant (Natural Gas) | 44.5 km | 1.16 GW | [6] |
| Shoemaker · Alliance NYGT, LLC | Power plant (Natural Gas) | 48.6 km | 33 MW | [6] |
| Myers Corner Substation · Central Hudson | Substation | 0.35 km | 69 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| East FishkillNYISO 1122 · East Fishkill Storage 1, LLC | Storage | IA signed · proposed 2029-12 | 205 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
16| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | https://www.cyrusone.com/data-centers/north-america/wappingers-falls-ny | [1] | Likely | 2026-09-27 | Shown |
| Address | 155 Myers Corners Road, Unit B, Wappingers Falls, NY 12590 | [1] | Likely | 2026-09-27 | Shown |
| Operator | CyrusOneoperator=CyrusOne | [1] | Likely | 2026-09-27 | Shown |
| Utility | Central Hudson Gas & Elec Corpterritory 3249: CENTRAL HUDSON GAS & ELEC CORP (INVESTOR OWNED, CH ENERGY GROUP) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | NYISONEW YORK INDEPENDENT SYSTEM OPERATOR | [3] derived | Likely | — | Shown |
| Balancing authority | NYIS | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Myers Corner Substation (69 kV)way/682776450 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.4 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 69 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 205 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.81¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 24.18¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 4.3 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 68,000 sq ft | [1] derived | Likely | 2026-09-27 | Shown |