DC
/

CyrusOne NYM7

OperatingColocationBuildingWappingers Falls, Dutchess County, New York
30% profile completeness
16 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
68,000 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Central Hudson Gas & Elec Corp · NYISO
Substation: Myers Corner Substation (69 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    CyrusOne NYM7
  2. substation
    Myers Corner Substation (69 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.35 km away. Proximity does not establish that it serves the site.
  3. transmission
    69 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.35 km away). Not confirmed as the supply path.
  4. utility
    Central Hudson Gas & Elec Corp[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    NYISO[3]
    Service territoryLikely
    Balancing authority: NYIS
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
41.59909, -73.88220
Address
155 Myers Corners Road, Unit B, Wappingers Falls, NY 12590[1]Likely
County
Dutchess County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
NYISO[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
NYIS[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Myers Corner Substation (69 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.4 km[1]Likelyderived
Highest-voltage line nearby
69 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.81¢/kWh[5]Confirmed

New York statewide average, July 2026.

State avg. commercial price
24.18¢/kWh[5]Confirmed

New York statewide average, July 2026.

Generation within 50 km
4.3 GW[6]Confirmedderived

80 EIA-reported plants within 50 km.

Generation queued in county
205 MW[4]Confirmedderived

1 active generation interconnection requests in Dutchess County: Storage 205 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
69 kV lineTransmission line0.35 km69 kV[1]
Danskammer Generating Station · Danskammer EnergyPower plant (Natural Gas)7.4 km502 MW[6]
Roseton Generating Facility · CCI Roseton LLCPower plant (Natural Gas)7.5 km1.22 GW[6]
Cricket Valley Energy · Cricket Valley Energy Center LLCPower plant (Natural Gas)26.4 km1.02 GW[6]
Wheelabrator Westchester · Wheelabrator Environmental SystemsPower plant (Biomass)36.2 km51 MW[6]
Rocky River (Ct) · FirstLight Power Resources Services LLCPower plant (Pumped Storage)37.2 km29 MW[6]
Kimberly Clark-Unit 1,2,3 · Kimberly-Clark CorporationPower plant (Natural Gas)39.2 km33 MW[6]
Bowline Point · Bowline, LLCPower plant (Natural Gas)44.5 km1.16 GW[6]
Shoemaker · Alliance NYGT, LLCPower plant (Natural Gas)48.6 km33 MW[6]
Myers Corner Substation · Central HudsonSubstation0.35 km69 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
East FishkillNYISO 1122 · East Fishkill Storage 1, LLCStorageIA signed · proposed 2029-12205 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
68,000 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

16
FieldValueSourceConfidenceAs ofStatus
StatusOperating[1] derivedUnverified2026-09-27Shown
Facility typeColocation[1] derivedUnverified2026-09-27Shown
Websitehttps://www.cyrusone.com/data-centers/north-america/wappingers-falls-ny[1] Likely2026-09-27Shown
Address155 Myers Corners Road, Unit B, Wappingers Falls, NY 12590[1] Likely2026-09-27Shown
OperatorCyrusOneoperator=CyrusOne[1] Likely2026-09-27Shown
UtilityCentral Hudson Gas & Elec Corpterritory 3249: CENTRAL HUDSON GAS & ELEC CORP (INVESTOR OWNED, CH ENERGY GROUP)[2] derivedLikely2022Shown
ISO / RTONYISONEW YORK INDEPENDENT SYSTEM OPERATOR[3] derivedLikely—Shown
Balancing authorityNYIS[2] derivedLikely—Shown
Nearest mapped substationMyers Corner Substation (69 kV)way/682776450[1] derivedLikely2026-09-28Shown
Distance to substation0.4 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby69 kV[1] derivedLikely2026-09-28Shown
Generation queued in county205 MW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price10.81¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price24.18¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km4.3 GW[6] derivedConfirmed202502Shown
Building footprint68,000 sq ft[1] derivedLikely2026-09-27Shown