Data centers in Dutchess County, New York
Datacenter Source tracks 3 data centers in Dutchess County, New York. Facilities that disclose power add up to 0 MW online and 0 MW in the pipeline — floors, since 0% report a figure. 2 interconnection-queue requests were filed in the county in the last two years.
Follow
Get changes to Dutchess County, New York
Or subscribe in a feed reader: RSS / Atom
Facilities
- 1 Gig Data Center East Fishkill, NY UnclassifiedPlanned
- CyrusOne NYM7 Colocation · Wappingers FallsOperating
- iPark 84 Data Center Interconnection UnclassifiedPlanned
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
- Mar 25, 2026 · NYISO 1760 Load request (Data center) — iPark 84 Data Center Interconnection150 MW · Status 5 (SRIS/SIS in progress); proposed initial backfeed: 10-2028 ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
- Jul 17, 2025 · NYISO 1738 Load request (Data center) — 1 Gig Data Center East Fishkill, NY1 GW · Status 5 (SRIS/SIS in progress); proposed initial backfeed: 10-2026 ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
Not yet collected
Not yet collected
Not yet collected for this state's utilities.
Not yet collected
Recent changes
- Mar 25, 2026 · iPark 84 Data Center Interconnection ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. Permit / site plan filed: NYISO load interconnection request 1760 filed (150 MW).
- Jul 17, 2025 · 1 Gig Data Center East Fishkill, NY ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. Permit / site plan filed: NYISO load interconnection request 1738 filed (1000 MW).