CyrusOne San Antonio IV
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityCyrusOne San Antonio IV
- →substationVLSI Substation (138 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.83 km away. Proximity does not establish that it serves the site.
- →transmission138 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.22 km away). Not confirmed as the supply path.
- →utilityCPS Energy (City of San Antonio)[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 29.47079, -98.67062
- County
- Bexar County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 5 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Pedernales Electric Coop, INC, Guadalupe Valley Elec Coop INC, Karnes Electric Coop INC, Bandera Electric Coop, INC.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Texas statewide average, July 2026.
- State avg. commercial price
Texas statewide average, July 2026.
- Generation within 50 km
24 EIA-reported plants within 50 km.
- Generation queued in county
21 active generation interconnection requests in Bexar County: Storage 4,771 MW, Solar 152 MW, Gas 35 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 138 kV line | Transmission line | 0.22 km | 138 kV | [1] |
| Leon Creek · City of San Antonio - (TX) | Power plant (Natural Gas) | 16 km | 184 MW | [6] |
| Oci Alamo Solar I Hybrid · OCI Energy LLC | Power plant (Solar) | 31.1 km | 41 MW | [6] |
| Oci Alamo 4, LLC · Consolidated Edison Development Inc. | Power plant (Solar) | 36 km | 40 MW | [6] |
| Ebony Energy Storage · Ebony Energy Storage, LLC | Power plant (Batteries) | 36.5 km | 200 MW | [6] |
| Arthur Von Rosenberg · City of San Antonio - (TX) | Power plant (Natural Gas) | 36.6 km | 518 MW | [6] |
| V H Braunig · City of San Antonio - (TX) | Power plant (Natural Gas) | 36.7 km | 1.05 GW | [6] |
| O W Sommers · City of San Antonio - (TX) | Power plant (Natural Gas) | 38.1 km | 830 MW | [6] |
| J K Spruce · City of San Antonio - (TX) | Power plant (Coal) | 38.4 km | 1.35 GW | [6] |
| VLSI Substation · CPS Energy | Substation | 0.83 km | 138 kV | [1] |
| Verde Circle Substation · CPS Energy | Substation | 1.15 km | 138 kV | [1] |
| Grissom Road Substation · CPS Energy | Substation | 2.19 km | 138 kV | [1] |
| Westover Hills Substation · CPS Energy | Substation | 2.57 km | 138 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Howard Road BESSERCOT 29INR0173 · Project Fast Flow LLC | Storage | In study · proposed 2028-04 | 618 MW | [4] |
| Orbit Energy StorageERCOT 27INR0082 · GCI Orbit Energy Storage, LLC | Storage | In study · proposed 2027-06 | 502 MW | [4] |
| Bernice Energy StorageERCOT 27INR0294 · Bernice Energy Storage LLC | Storage | In study · proposed 2029-02 | 403 MW | [4] |
| Mission Station Energy Storage IERCOT 28INR0474 · Mission Station LLC | Storage | In study · proposed 2030-05 | 375 MW | [4] |
| Mission Station Energy Storage IIERCOT 28INR0475 · Mission Station LLC | Storage | In study · proposed 2030-05 | 375 MW | [4] |
| Quela BESSERCOT 22INR0423 · BRP Quela BESS LLC | Storage | In study · proposed 2027-12 | 301 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
13| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | CyrusOne San Antonio IVway/1121592786 name=CyrusOne San Antonio IV | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Utility | CPS Energy (City of San Antonio)territory 16604: CITY OF SAN ANTONIO - (TX) (MUNICIPAL, CITY OF SAN ANTONIO - (T | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | ERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC. | [3] derived | Likely | — | Shown |
| Balancing authority | ERCO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | VLSI Substation (138 kV)way/112556046 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.8 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 138 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 4.96 GW | [4] derived | Confirmed | 2026-09-01 | Shown |
| State avg. industrial price | 7.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 8.47¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 4.3 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 92,900 sq ft | [1] derived | Likely | 2026-09-27 | Shown |