San Antonio
Market boundary: facilities within 40 km of the metro center (editorial definition).
Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned.
Construction pipeline by expected completion
MW from phases with a projected completion date
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced179 MW
- Interconnection requests—
- Contracted / approved—
- Under construction134 MW
- Operational217 MW
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Interconnection queues
Active requests to connect to the grid (ERCOT). Requests are applications, not commitments — most never get built.
Largest operators & owners
Online + pipeline MW at linked facilities
- Microsoft172 MW + 0 MW · 16 sites
- Vantage Data Centers— · 6 sites
- CyrusOne— · 4 sites
- H5 Data Centers— · 1 sites
- Lumen Technologies— · 1 sites
- National Security Agency— · 1 sites
- Lowe's— · 1 sites
- CHRISTUS Health— · 1 sites
- Frost Bank— · 1 sites
- Valero— · 1 sites
- QTS Data Centers— · 1 sites
- GVTC— · 1 sites
Largest customers & end users
Tenants and workload owners, where sourced
None identified.
Utility exposure
Most likely retail utility by location (approximate)
- Pedernales Electric Coop, INC45 MW + 134 MW · 12 sites
- Medina Electric Coop, INC106 MW + 0 MW · 6 sites
- CPS Energy (City of San Antonio)66 MW + 0 MW · 47 sites
Grid operators (ISO / RTO)
By facility location
- ERCOT217 MW + 134 MW · 65 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| Vantage TX1 | Operating + expanding | 45 MW | 134 MW |
| Microsoft SAT40 | Operating | 106 MW | — |
| Microsoft SAT14 | Operating | 66 MW | — |
Facilities by status
- Operating64
- Operating + expanding1
Campuses & sites (44)
Campus pages list their buildings
- Vantage TX145 MW online · 134 MW pipeline
- Microsoft SAT40106 MW online
- Microsoft SAT1466 MW online
- Amazonbuilding
- Amazon AWS SAT - 12807 Donopbuilding
- CHRISTUS Health data centerbuilding
- CyrusOne San Antonio Ibuilding
- CyrusOne San Antonio IVbuilding
- CyrusOne SAT10 & SAT11building
- Frost Bank data centerbuilding
- GVTCbuilding
- H5 Data Centers San Antoniobuilding
- HEB data center — 15103 Huebner Roadbuilding
- Lowe's Data Centerbuilding
- Lumen San Antonio 2building
- Microsoftbuilding
- QTS San Antonio IIbuilding
- Stream San Antonio IIbuilding
- Texas Cryptologic Centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Valero Wisermanbuilding