Data center parcel 044292829000
POWER & GRID
Time-to-power · verification · interconnectionPower reality
- ⚠ No public interconnection record for this load — PJM does not publish large-load requests.
How the time-to-power window was estimated
- Current stage: Under construction (furthest stage with documented evidence)[1]
- Construction elapsed: Construction documented since 2026-09-27 (0.0 years).
- From “Under construction”, large loads have typically taken 0.5–2 more years to first power (editorial range; see Methodology).
- Construction to first power typically takes 1.25–2.5 years.
- The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionSep 27, 2026
Permit / site plan
- Sep 27, 2026 · Reported status: under construction[1]
- Energization
- Operational
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Permit / site plan.
Grid path
- →facilityData center parcel 044292829000
- →substationUnnamed substation[4]Proximity onlyUnverifiedNearest mapped substation, 0.15 km away. Proximity does not establish that it serves the site.
- →transmissionPacific Loop (230 kV)[4]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.02 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
County parcel- Coordinates
- 39.00004, -77.43663
- County
- Loudoun County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Virginia statewide average, July 2026.
- State avg. commercial price
Virginia statewide average, July 2026.
- Generation within 50 km
64 EIA-reported plants within 50 km.
- Generation queued in county
11 active generation interconnection requests in Loudoun County: Storage 940 MW, Solar 100 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Pacific Loop · Virginia Electric & Power Company | Transmission line | 0.02 km | 230 kV | [4] |
| 2137 · Virginia Electric & Power Company | Transmission line | 0.48 km | 230 kV | [4] |
| 2081;2150 · Dominion Energy | Transmission line | 0.92 km | 230 kV | [4] |
| 2081 | Transmission line | 1.33 km | 230 kV | [4] |
| 2150 · Dominion Energy | Transmission line | 1.33 km | 230 kV | [4] |
| 2079 · Dominion Energy | Transmission line | 1.51 km | 230 kV | [4] |
| Potomac Energy Center, LLC · Potomac Energy Center LLC | Power plant (Natural Gas) | 11.4 km | 766 MW | [7] |
| Montgomery County Resource Recovery · Covanta Montgomery, Inc. | Power plant (Biomass) | 22.4 km | 54 MW | [7] |
| Dickerson Power · Dickerson Power, LLC | Power plant (Natural Gas) | 23.4 km | 299 MW | [7] |
| Nih Cogeneration Facility · National Institutes of Health | Power plant (Natural Gas) | 29.6 km | 28 MW | [7] |
| Covanta Alexandria/Arlington Energy · Covanta Alexandria/Arlington | Power plant (Biomass) | 34.6 km | 29 MW | [7] |
| Covanta Fairfax Energy · Covanta Fairfax Inc | Power plant (Biomass) | 37.9 km | 98 MW | [7] |
| Central Utility Plant At White Oak · GSA Metropolitan Service Center | Power plant (Natural Gas) | 39.5 km | 54 MW | [7] |
| Blake Solar Plant · Horus West Virginia 1, LLC | Power plant (Solar) | 45.1 km | 80 MW | [7] |
| Unnamed substation | Substation | 0.15 km | — | [4] |
| Pacific Substation · Dominion Energy | Substation | 0.47 km | 230 kV | [4] |
| Ocean Court Substation | Substation | 0.58 km | 230 kV | [4] |
| Global Plaza Substation · Dominion Energy | Substation | 0.77 km | 230 kV | [4] |
| Unnamed substation | Substation | 1.12 km | — | [4] |
| Sterling Park Substation · Dominion Energy | Substation | 1.49 km | 230 kV | [4] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Loudoun 230 kVPJM AG2-285 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| Beaumeade 230 kVPJM AG2-287 | Storage | In study · proposed 2023-12 | 150 MW | [5] |
| New Road StoragePJM AE2-019 | Storage | IA signed · proposed 2026-12 | 120 MW | [5] |
| Dulles SolarPJM AF1-147 | Solar | IA signed · proposed 2023-12 | 100 MW | [5] |
| Roundtable 230 kVPJM AG2-307 | Storage | In study · proposed 2023-12 | 100 MW | [5] |
| Shelhorn 230 kVPJM AG2-323 | Storage | In study · proposed 2023-12 | 100 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
- Permit / case numbers
Real estate
None sourced yet
None sourced yet
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 044292829000 Loudoun County, VA | — | 4.78 | OP (ZRTD-2017-0010) · Data Center | 182,782 under construction | [1] |
| 113162785000 Loudoun County, VA | — | 21.57 | IP · Data Center | 243,984 under construction | [1] |
- Site area
Legal acreage of the parcel(s).
- Zoning
- Land use
- Annual property tax
- Not yet sourced
Size
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
23| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Data center parcel 044292829000 | [1] derived | Confirmed | 2026-09-27 | Shown |
| Status | Under construction | [1] derived | Confirmed | 2026-09-27 | Shown |
| Facility type | Unclassified | [1] derived | Confirmed | 2026-09-27 | Shown |
| Utility | Dominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substationway/1317924409 | [4] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.2 km | [4] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [4] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.04 GW | [5] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.07¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.65 GW | [7] derived | Confirmed | 202502 | Shown |
| Permit / case numbers | BLDC-2024-010722 | [1] | Confirmed | 2026-09-27 | Shown |
| Permit / case numbers | BLDC-2025-044143 | [1] | Confirmed | 2026-09-27 | Shown |
| Floor area | 426,800 sq ft | [1] | Confirmed | 2026-09-27 | Shown |
| Site area | 26.4 acres | [1] | Confirmed | 2026-09-27 | Shown |
| Parcel / land records | MCPI 044292829000 (Loudoun County) | [1] | Confirmed | 2026-09-27 | Shown |
| Parcel / land records | MCPI 113162785000 (Loudoun County) | [1] | Confirmed | 2026-09-27 | Shown |
| Zoning | OP | [1] | Confirmed | 2026-09-27 | Shown |
| Zoning | IP | [1] | Confirmed | 2026-09-27 | Shown |
| Land use | Data Center | [1] | Confirmed | 2026-09-27 | Shown |
| Land use | Data Center | [1] | Confirmed | 2026-09-27 | Superseded / alternative |