DC
/

DataOne Vineland

OperatingAI campusBuildingCumberland County, New Jersey

Part of Microsoft-Nebius New Jersey

20% profile completeness
14 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
115,800 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
City of Vineland - (Nj) · PJM
Substation: Lincoln 3/Clayville Substation (138 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    DataOne Vineland
  2. substation
    Lincoln 3/Clayville Substation (138 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.21 km away. Proximity does not establish that it serves the site.
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    City of Vineland - (Nj)[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[3]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

QueueRelationshipStageMW req.MW appr.QueuedExpected in servicePOI / TOSource · as of
PJM V2-041
Vineland-Mays Landing · Solar
Possibly related generation
Speculative
Generation request name/developer shares “vineland” with this facility, in the same county. Not confirmed as serving it.
In service
In Service; feasibility: Document Posted; system impact: Document Posted; facilities: Not Required; ISA/GIA: Wholesale Market Participation Agreement
41.52Jul 29, 2009In service Sep 30, 2011Clayville 12kV
TO: AEC
[4] Sep 27, 2026

On-site & dedicated generation

  • Clayville (Natural Gas, 55 MW) is 0.4 km away[6]
    EIA plant within 1.5 km; proximity does not establish that it supplies the facility
    Natural gasCo-located55 MWUnverified
  • PJM V2-041 Vineland-Mays Landing (Solar, 4 MW requested)[4]
    Generation request name/developer shares “vineland” with this facility, in the same county. Not confirmed as serving it.
    SolarArrangement unknown4 MWSpeculative

Location & imagery

Mapped outline
Coordinates
39.42756, -75.01689
County
Cumberland County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Nebius[1]Likely
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Nebius[1]Likely
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Lincoln 3/Clayville Substation (138 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.2 km[1]Likelyderived
State avg. industrial price
15.63¢/kWh[5]Confirmed

New Jersey statewide average, July 2026.

State avg. commercial price
19.17¢/kWh[5]Confirmed

New Jersey statewide average, July 2026.

Generation within 50 km
5.11 GW[6]Confirmedderived

61 EIA-reported plants within 50 km.

Generation queued in county
424 MW[4]Confirmedderived

12 active generation interconnection requests in Cumberland County: Solar 324 MW, Storage 100 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Clayville · City of Vineland - (NJ)Power plant (Natural Gas)0.4 km55 MW[6]
Sherman Avenue · Calpine New Jersey Generation LLCPower plant (Natural Gas)4.4 km87 MW[6]
Howard Down · City of Vineland - (NJ)Power plant (Natural Gas)7 km55 MW[6]
Cumberland (Nj) · Calpine New Jersey Generation LLCPower plant (Natural Gas)7.3 km187 MW[6]
Pseg Salem Generating Station · PSEG Nuclear LLCPower plant (Nuclear)44.7 km2.32 GW[6]
Pseg Hope Creek Generating Station · PSEG Nuclear LLCPower plant (Nuclear)44.9 km1.17 GW[6]
West Deptford Energy Station · West Deptford Energy LLCPower plant (Natural Gas)49.2 km735 MW[6]
Garrison Energy Center LLC · Garrison Energy Center LLCPower plant (Natural Gas)49.4 km309 MW[6]
Lincoln 3/Clayville Substation · Vineland Municipal Electric UtilitySubstation0.21 km138 kV[1]
Lincoln/Clayville Substation · Vineland Municipal Electric UtilitySubstation0.33 km69 kV[1]
Wheaton SubstationSubstation2.03 km69 kV[1]
Unnamed substationSubstation2.19 km69 kV[1]
Butler Substation · Vineland Municipal Electric UtilitySubstation2.26 km69 kV[1]
Unnamed substationSubstation2.56 km69 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
Buckshutem Solar IPJM AE1-179SolarIA signed · proposed 2027-0160 MW[4]
South Millville - Newport 69 kVPJM AI2-385SolarIn study · proposed 2025-0360 MW[4]
Sherman Ave - West Vineland 69 kVPJM AF1-238 - moved to TC1StorageIn study · proposed 2023-0550 MW[4]
Nabb Solar ProjectPJM AE1-240SolarSuspended · proposed 2024-1050 MW[4]
Carlls Corner - Sherman Ave 69 kVPJM AI2-387SolarIn study · proposed 2024-1250 MW[4]
Roadstown 69 kVPJM AG2-241SolarIn study · proposed 2023-0947 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
115,800 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

Other buildings on this campus

1

All claims (provenance audit)

14
FieldValueSourceConfidenceAs ofStatus
NameDataOne Vinelandway/1553894888 name=DataOne Vineland[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
Facility typeAI campus[1] derivedUnverified2026-09-27Shown
OperatorNebiusoperator=Nebius[1] Likely2026-09-27Shown
UtilityCity of Vineland - (Nj)territory 19856: CITY OF VINELAND - (NJ) (MUNICIPAL, CITY OF VINELAND - (NJ))[2] derivedLikely2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[3] derivedLikely—Shown
Balancing authorityPJM[2] derivedLikely—Shown
Nearest mapped substationLincoln 3/Clayville Substation (138 kV)way/1099917639[1] derivedLikely2026-09-28Shown
Distance to substation0.2 km[1] derivedLikely2026-09-28Shown
Generation queued in county424 MW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price15.63¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price19.17¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km5.11 GW[6] derivedConfirmed202502Shown
Building footprint115,800 sq ft[1] derivedLikely2026-09-27Shown