DFW2-DC1 Project

Under constructionEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.UnclassifiedBuildingWilmer, Dallas County, Texas

DFW2-DC1 Project is an under construction data center in Wilmer, Texas. Power capacity has not been disclosed or collected yet. Verification: unverified. 4 cited sources.

20% profile completeness
9 claims from 4 sources
Last verified against sources: Nov 2, 2026
Newest dated evidence: Nov 2, 2026
Follow

Get changes to DFW2-DC1 Project

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “DFW2-DC1 Project.” /facilities/dfw2-dc1-project-wilmer-tx. Data as of 2026-11-02. Accessed 2026-11-02.
BibTeX
@misc{datacentersource_dfw2_dc1_project_wilmer_tx_2026,
  title = {{DFW2-DC1 Project}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/dfw2-dc1-project-wilmer-tx}},
  note = {Data as of 2026-11-02; accessed 2026-11-02. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Insufficient evidence to estimate
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Under construction
Furthest stage with documented evidence
Utility · ISO
Not identified
Substation: Not identified

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
  • ⚠ No public interconnection record for this load.
  • ⚠ No permit record linked to this site yet.
  • ⚠ No announcement, filing or permit found for this site.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Evidence: Evidence is limited to community map.
Assumptions
  • An estimate needs at least one dated development, permit, grid or construction record.
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionNov 2, 2026
    Community map
    • Nov 2, 2026 · Reported status: under construction[1]
  3. Energization
  4. Operational

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    DFW2-DC1 Project
  2. substation
    Not identified
    UnknownUnverified
    No substation mapped within 3 km and none named in filings.
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    Not identified
    UnknownUnverified
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for the serving utility. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
32.58390, -96.69529
Address
782 West Belt Line Road, Wilmer, TX 75172[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.Likely
County
Dallas County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence

No tenants or end users identified in our sources yet.

No ownership information sourced yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

State avg. industrial price
7.21¢/kWh[3]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Aug 2026.Confirmed

Texas statewide average, August 2026.

State avg. commercial price
8.96¢/kWh[3]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Aug 2026.Confirmed

Texas statewide average, August 2026.

Generation within 50 km
5.95 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

27 EIA-reported plants within 50 km.

Generation queued in county
867 MW[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 1, 2026.Confirmedderived

9 active generation interconnection requests in Dallas County: Storage 817 MW, Other 50 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Lily Solar Hybrid · Lily Solar, LLCPower plant (Solar)25.6 km196 MW[4]
Forney Energy Center · LaFrontera Holdings LLCPower plant (Natural Gas)27 km1.77 GW[4]
Mountain Creek · Mountain Creek Power, LLCPower plant (Natural Gas)27.3 km808 MW[4]
Ennis Power Company LLC · Ennis Power Company LLCPower plant (Natural Gas)29.4 km360 MW[4]
Lake Hubbard · Luminant Generation Company LLCPower plant (Natural Gas)31.3 km915 MW[4]
Ellis Solar LLC · 174 Power Global Corp.Power plant (Solar)36.1 km80 MW[4]
Midlothian Energy Facility · Midlothian Energy LLCPower plant (Natural Gas)37.7 km1.62 GW[4]
Elm Branch Solar 1 · Lightsource Renewable Energy Asset Management, LLCPower plant (Solar)39.1 km135 MW[4]
Largest queued generation in this countyFuelQueue statusMWSource
watermelon 1 energy storageERCOT 27INR0457 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[2]
watermelon 2 energy storageERCOT 27INR0458 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[2]
watermelon 3 energy storageERCOT 27INR0459 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[2]
watermelon 4 energy storageERCOT 27INR0460 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[2]
watermelon 5 energy storageERCOT 28INR0255 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[2]
watermelon 6 energy storageERCOT 28INR0256 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[2]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Site area
195.4 acres[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.Likelyderived

Area of the mapped OSM site outline.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

9
FieldValueSourceConfidenceAs ofStatus
NameDFW2-DC1 Projectway/1570250230 name=DFW2-DC1 Project[1] Likely2026-11-02Shown
StatusUnder construction[1] derivedLikely2026-11-02Shown
Websitehttps://www.streamdatacenters.com/locations/dallas-data-centers/[1] Likely2026-11-02Shown
Address782 West Belt Line Road, Wilmer, TX 75172[1] Likely2026-11-02Shown
Generation queued in county867 MW[2] derivedConfirmed2026-10-01Shown
State avg. industrial price7.21¢/kWh[3] Confirmed2026-08Shown
State avg. commercial price8.96¢/kWh[3] Confirmed2026-08Shown
Generation within 50 km5.95 GW[4] derivedConfirmed202502Shown
Site area195.4 acres[1] derivedLikely2026-11-02Shown