DC
/

Dallas–Fort Worth

Market boundary: facilities within 70 km of the metro center (editorial definition).

Facilities
79
7 campuses
Power online
583 MW
3 sites reporting
Under construction
120 MW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
3
583 MW online · 120 MW pipeline
AI compute
0.50M
H100-equivalents (est.)
Capital (reported + est.)
$16.7B
$2.99B assessed

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned.

Construction pipeline by expected completion

MW from phases with a projected completion date

2026
2027

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced1.44 GW
  • Interconnection requests—
  • Contracted / approved—
  • Under construction120 MW
  • Operational583 MW

856 MW announced at 4 sites has no grid, construction or operating record yet.

Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented
Verified operating: 9Announced only: 4Unverified: 66

Interconnection queues

Active requests to connect to the grid (ERCOT). Requests are applications, not commitments — most never get built.

Generation seeking interconnection8.7 GW · 45 requests
Storage 6.06 GWSolar 1.64 GWGas 898 MWOther 100 MW

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned
  • OpenAI367 MW + 28 MW · 1 sites

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • ERCOT583 MW + 120 MW · 79 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
CoreWeave Denton TXOperating + expanding367 MW28 MW
Google Red OakOperating + expanding93 MW92 MW
Google MidlothianOperating123 MW—

Facilities by status

  • Operating73
  • Operating + expanding2
  • Unknown4

Campuses & sites (53)

Campus pages list their buildings