Digital Fortress: Richmond
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityDigital Fortress: Richmond
- →substationEnon Substation (34.5 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 2.29 km away. Proximity does not establish that it serves the site.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 37.36026, -77.32710
- Address
- County
- Chesterfield County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- State avg. industrial price
Virginia statewide average, July 2026.
- State avg. commercial price
Virginia statewide average, July 2026.
- Generation within 50 km
28 EIA-reported plants within 50 km.
- Generation queued in county
17 active generation interconnection requests in Chesterfield County: Gas 1,138 MW, Storage 1,005 MW, Solar 232 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Chesterfield · Virginia Electric & Power Co | Power plant (Natural Gas) | 5.5 km | 386 MW | [6] |
| Hopewell Cogeneration · Luminant Generation Company LLC | Power plant (Natural Gas) | 8.6 km | 378 MW | [6] |
| Darbytown · Virginia Electric & Power Co | Power plant (Natural Gas) | 15.8 km | 340 MW | [6] |
| Skipjack Solar Center · AES Distributed Energy | Power plant (Solar) | 17.2 km | 175 MW | [6] |
| Fort Powhatan Solar · Dominion Renewable Energy | Power plant (Solar) | 24.5 km | 150 MW | [6] |
| Spring Grove I · Dominion Energy Inc. | Power plant (Solar) | 41.6 km | 98 MW | [6] |
| Waverly Solar, LLC · Waverly Solar, LLC | Power plant (Solar) | 41.9 km | 118 MW | [6] |
| Colonial Trail West · Dominion Energy Inc. | Power plant (Solar) | 44.9 km | 142 MW | [6] |
| Enon Substation · Virginia Electric and Power Company | Substation | 2.29 km | 34.5 kV | [1] |
| Enon Substation · Virginia Electric and Power Company | Substation | 2.32 km | 230 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Chesterfield 230 kVPJM AF1-128 - moved to TC1 | Gas | In study · proposed 2023-06 | 569 MW | [4] |
| Chesterfield CT Units 3&4PJM AF1-129 | Gas | IA signed · proposed 2029-12 | 569 MW | [4] |
| Chesterfield 230 kVPJM AG2-646 | Storage | In study · proposed 2024-06 | 200 MW | [4] |
| Trabue-Midlothian 230 kV linePJM AG2-088 | Storage | In study · proposed 2022-04 | 150 MW | [4] |
| Chesterfield 230 kVPJM AG2-269 | Storage | In study · proposed 2023-12 | 150 MW | [4] |
| Southwest 230 kVPJM AG2-275 | Storage | In study · proposed 2023-12 | 150 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Digital Fortress: Richmondway/550355261 name=Digital Fortress: Richmond | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 1401 Meadowville Technology Parkway, 23836 | [1] | Likely | 2026-09-27 | Shown |
| Operator | Digital Fortressoperator=Digital Fortress | [1] | Likely | 2026-09-27 | Shown |
| Utility | Dominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Enon Substation (34.5 kV)way/868888650 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 2.3 km | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 2.38 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 2.17 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 244,100 sq ft | [1] derived | Likely | 2026-09-27 | Shown |