Richmond
Market boundary: facilities within 40 km of the metro center (editorial definition).
Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned.
Construction pipeline by expected completion
MW from phases with a projected completion date
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced533 MW
- Interconnection requests—
- Contracted / approved—
- Under construction217 MW
- Operational901 MW
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Interconnection queues
Active requests to connect to the grid (PJM). Requests are applications, not commitments — most never get built.
Largest operators & owners
Online + pipeline MW at linked facilities
- CoreWeave114 MW + 83 MW · 1 sites
- QTS Data Centers— · 11 sites
- Meta— · 3 sites
- Flexential— · 1 sites
- Bank of America— · 1 sites
- Digital Fortress— · 1 sites
- PowerHouse Data Centers— · 1 sites
Largest customers & end users
Tenants and workload owners, where sourced
None identified.
Utility exposure
Most likely retail utility by location (approximate)
- Dominion Energy901 MW + 217 MW · 28 sites
Grid operators (ISO / RTO)
By facility location
- PJM901 MW + 217 MW · 28 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| QTS Richmond 3 | Operating + expanding | 202 MW | 134 MW |
| QTS Richmond 1 | Operating | 333 MW | — |
| QTS Richmond 2 | Operating | 252 MW | — |
| CoreWeave Chester VA | Operating + expanding | 114 MW | 83 MW |
Facilities by status
- Operating20
- Operating + expanding2
- Under construction6
Campuses & sites (8)
Campus pages list their buildings
- QTS Richmond 3202 MW online · 134 MW pipeline
- QTS Richmond 1333 MW online
- QTS Richmond 2252 MW online
- CoreWeave Chester VA114 MW online · 83 MW pipeline
- Bank of America data center — 6050 White Oak Creek Drivebuilding
- Digital Fortress: Richmondbuilding
- Flexential - Richmondbuilding
- PowerHouse CTP-02building