DC
/

Richmond

Market boundary: facilities within 40 km of the metro center (editorial definition).

Facilities
28
4 campuses
Power online
901 MW
4 sites reporting
Under construction
217 MW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
4
901 MW online · 217 MW pipeline
AI compute
0.69M
H100-equivalents (est.)
Capital (reported + est.)
$24.4B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned.

Construction pipeline by expected completion

MW from phases with a projected completion date

2027

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced533 MW
  • Interconnection requests—
  • Contracted / approved—
  • Under construction217 MW
  • Operational901 MW
Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented

No large gaps in this scope.

Verified operating: 4Unverified: 24

Interconnection queues

Active requests to connect to the grid (PJM). Requests are applications, not commitments — most never get built.

Generation seeking interconnection2.41 GW · 21 requests
Gas 1.14 GWStorage 1.02 GWSolar 252 MW

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned

None identified.

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • PJM901 MW + 217 MW · 28 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
QTS Richmond 3Operating + expanding202 MW134 MW
QTS Richmond 1Operating333 MW—
QTS Richmond 2Operating252 MW—
CoreWeave Chester VAOperating + expanding114 MW83 MW

Facilities by status

  • Operating20
  • Operating + expanding2
  • Under construction6

Campuses & sites (8)

Campus pages list their buildings