Digital Realty IAD45

Under constructionEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 9, 2026.ColocationBuildingSterling, Loudoun County, Virginia

Digital Realty IAD45 is an under construction colocation in Sterling, Virginia. Operated or owned by Digital Realty. Current power: 80 MW (estimated). Verification: under construction. 8 cited sources.

Part of Digital Realty — Sterling, VA campus

40% profile completeness
31 claims from 9 sources
Last verified against sources: Nov 9, 2026
Newest dated evidence: Nov 9, 2026
Follow

Get changes to Digital Realty IAD45

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Digital Realty IAD45.” /facilities/digital-realty-iad45-sterling-va. Data as of 2026-11-09. Accessed 2026-11-09.
BibTeX
@misc{datacentersource_digital_realty_iad45_sterling_va_2026,
  title = {{Digital Realty IAD45}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/digital-realty-iad45-sterling-va}},
  note = {Data as of 2026-11-09; accessed 2026-11-09. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
2.6M sq ft[2]
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 9, 2026.Confirmed
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
Medium confidence
Project verification
Under construction
Construction documented by permit / site plan.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Dominion Energy · PJM
Substation: Unnamed substation (230 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
80 MW[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Reported
  • ⚠ No public interconnection record for this load — PJM does not publish large-load requests.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. PermittingNov 9, 2026
    Permit / site plan
    • Nov 9, 2026 · Permit / case B20629620100[2]
    • Nov 9, 2026 · Permit / case B10386280100[2]
    • Nov 9, 2026 · Permit / case BLDC-2024-044335[2]
    • Nov 9, 2026 · Permit / case BLDC-2025-006199[2]
    • Nov 9, 2026 · Permit / case B10386300100[2]
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionNov 9, 2026
    Permit / site plan
    • Nov 9, 2026 · Reported status: under construction[2]
  3. EnergizationNov 2, 2026
    Community map
    • Nov 2, 2026 · Power in use reported: 80 MW[1]
  4. OperationalNov 2, 2026
    Community map
    • Nov 2, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Permit / site plan, Community map.

Grid path

  1. facility
    Digital Realty IAD45
  2. substation
    Unnamed substation (230 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.28 km away. Proximity does not establish that it serves the site.
  3. transmission
    500 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.19 km away). Not confirmed as the supply path.
  4. utility
    Dominion Energy[3]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[5]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates1

  • GS-5 rate class for customers demanding 25 MW or more[9]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 25, 2025.Nov 25, 2025
    Dominion Energy · Virginia State Corporation Commission · Docket PUR-2025-00058 · Final order issued · effective Jan 1, 2027

    “the new GS-5 rate class will comprise customers demanding 25 megawatts or more. The new rate class will be effective beginning January 1, 2027.”

    Applies to Dominion Energy Virginia's service territory; the facility's utility is the most likely retail provider by location unless a source names it.

Location & imagery

Mapped outline
Coordinates
38.96265, -77.49057
Address
43714 Efficiency Drive, Sterling, VA 20166[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.Likely
County
Loudoun County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Property owner of record
Operator
Utility

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Northern Virginia Elec Coop.

No tenants or end users identified in our sources yet.

Power (all fields)

Current IT capacity
80 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.Likely
Estimated annual consumption
638 GWh/yr[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 9, 2026.Speculativeestimated

104 MW (IT 80 MW × 1.3) × 8,760 h × 70% utilization.

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (230 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.3 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
500 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
9.98¢/kWh[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Aug 2026.Confirmed

Virginia statewide average, August 2026.

State avg. commercial price
11.14¢/kWh[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Aug 2026.Confirmed

Virginia statewide average, August 2026.

Generation within 50 km
1.62 GW[8]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

58 EIA-reported plants within 50 km.

Generation queued in county
1.04 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 9, 2026.Confirmedderived

11 active generation interconnection requests in Loudoun County: Storage 940 MW, Solar 100 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
2095;2137 · Virginia Electric & Power CompanyTransmission line0.34 km230 kV[1]
230 kV line · Virginia Electric & Power CompanyTransmission line0.35 km230 kV[1]
500 kV lineTransmission line1.19 km500 kV[1]
2095 · Virginia Electric & Power CompanyTransmission line1.48 km230 kV[1]
2213 · Virginia Electric & Power CompanyTransmission line1.59 km230 kV[1]
2213;2137 · Virginia Electric & Power CompanyTransmission line1.7 km230 kV[1]
Potomac Energy Center, LLC · Potomac Energy Center LLCPower plant (Natural Gas)11.6 km766 MW[8]
Montgomery County Resource Recovery · Covanta Montgomery, Inc.Power plant (Biomass)26.6 km54 MW[8]
Dickerson Power · Dickerson Power, LLCPower plant (Natural Gas)27.6 km299 MW[8]
Nih Cogeneration Facility · National Institutes of HealthPower plant (Natural Gas)34.5 km28 MW[8]
Covanta Alexandria/Arlington Energy · Covanta Alexandria/ArlingtonPower plant (Biomass)36.1 km29 MW[8]
Covanta Fairfax Energy · Covanta Fairfax IncPower plant (Biomass)36.8 km98 MW[8]
Blake Solar Plant · Horus West Virginia 1, LLCPower plant (Solar)44.7 km80 MW[8]
Central Utility Plant At White Oak · GSA Metropolitan Service CenterPower plant (Natural Gas)44.7 km54 MW[8]
Unnamed substationSubstation0.28 km230 kV[1]
Sojourner Substation · Virginia Electric & Power CompanySubstation0.37 km230 kV[1]
Mars SubstationSubstation1.1 km500 kV[1]
Runway Delivery PointSubstation1.53 km230 kV[1]
Cabin Run Substation · Virginia Electric & Power CompanySubstation1.59 km230 kV[1]
Perimeter Substation · NOVECSubstation1.6 km230 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
Loudoun 230 kVPJM AG2-285StorageIn study · proposed 2023-12150 MW[6]
Beaumeade 230 kVPJM AG2-287StorageIn study · proposed 2023-12150 MW[6]
New Road StoragePJM AE2-019StorageIA signed · proposed 2026-12120 MW[6]
Dulles SolarPJM AF1-147SolarIA signed · proposed 2023-12100 MW[6]
Roundtable 230 kVPJM AG2-307StorageIn study · proposed 2023-12100 MW[6]
Shelhorn 230 kVPJM AG2-323StorageIn study · proposed 2023-12100 MW[6]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —
Permit / case numbers
B20629620100, B10386280100, BLDC-2024-044335, BLDC-2025-006199, B10386300100[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 9, 2026.Confirmed

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

ParcelRecord ownerAcresZoning / useBuilding sq ftSource
093365404000
Loudoun County, VA
DIGITAL WL 2834 LLC
Project: Digital Dulles
447.61GI · Data Center2,603,391
built/under construction
[2]
Site area
447.6 acres[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 9, 2026.Confirmed

Legal acreage of the parcel(s).

Zoning
GI[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 9, 2026.Confirmed
Land use
Data Center[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 9, 2026.Confirmed
Annual property tax
Not yet sourced

Size

Floor area
2.6M sq ft[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 9, 2026.Confirmed

Building area on the county's data-center parcel inventory (from building permits).

Building footprint
400,100 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.Likelyderived

Computed from the mapped OSM building outline.

Parcel / land records
MCPI 093365404000 (Loudoun County)[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 9, 2026.Confirmed

What changed (last 3 years)

Follow this facility (RSS)
  • Status
    OperatingSep 27, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→Under constructionSep 27, 2026[2]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.

Timeline

No dated events sourced yet.

Other buildings on this campus

1

All claims (provenance audit)

31
FieldValueSourceConfidenceAs ofStatus
NameDigital Realty IAD45way/1543296494 name=Digital Realty IAD45[1] Likely2026-11-02Shown
StatusOperating[1] derivedUnverified2026-11-02Superseded / alternative
StatusUnder construction[2] derivedConfirmed2026-11-09Shown
Facility typeColocation[1] derivedUnverified2026-11-02Shown
Websitehttps://www.digitalrealty.com/data-centers/americas/northern-virginia/iad44[1] Likely2026-11-02Shown
Address43714 Efficiency Drive, Sterling, VA 20166[1] Likely2026-11-02Shown
Property owner of recordDigital Wl 2834 LLCMCPI 093365404000: DIGITAL WL 2834 LLC[2] Confirmed2026-11-09Shown
OperatorDigital Realtyoperator=Digital Realty[1] Likely2026-11-02Shown
UtilityDominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE[3] derivedUnverified2022Shown
Current IT capacity80 MWit_power=80 MW[1] Likely2026-11-02Shown
Estimated annual consumption638 GWh/yr[4] estimatedSpeculative2026-11-09Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[5] derivedLikely—Shown
Balancing authorityPJM[3] derivedLikely—Shown
Nearest mapped substationUnnamed substation (230 kV)way/1156362218[1] derivedLikely2026-09-28Shown
Distance to substation0.3 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby500 kV[1] derivedLikely2026-09-28Shown
Generation queued in county1.04 GW[6] derivedConfirmed2026-11-09Shown
State avg. industrial price9.98¢/kWh[7] Confirmed2026-08Shown
State avg. commercial price11.14¢/kWh[7] Confirmed2026-08Shown
Generation within 50 km1.62 GW[8] derivedConfirmed202502Shown
Permit / case numbersB20629620100[2] Confirmed2026-11-09Shown
Permit / case numbersB10386280100[2] Confirmed2026-11-09Shown
Permit / case numbersBLDC-2024-044335[2] Confirmed2026-11-09Shown
Permit / case numbersBLDC-2025-006199[2] Confirmed2026-11-09Shown
Permit / case numbersB10386300100[2] Confirmed2026-11-09Shown
Floor area2.6M sq ft[2] Confirmed2026-11-09Shown
Building footprint400,100 sq ft[1] derivedLikely2026-11-02Shown
Site area447.6 acres[2] Confirmed2026-11-09Shown
Parcel / land recordsMCPI 093365404000 (Loudoun County)[2] Confirmed2026-11-09Shown
ZoningGI[2] Confirmed2026-11-09Shown
Land useData Center[2] Confirmed2026-11-09Shown