Digital Realty VA4

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.ColocationBuildingBristow, Prince William County, Virginia

Digital Realty VA4 is an operating colocation in Bristow, Virginia. Operated or owned by Digital Realty. Current power: 24 MW (estimated). Verification: verified operating. 8 cited sources.

40% profile completeness
24 claims from 9 sources
Last verified against sources: Nov 9, 2026
Newest dated evidence: Nov 9, 2026
Follow

Get changes to Digital Realty VA4

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Digital Realty VA4.” /facilities/digital-realty-va4-bristow-va. Data as of 2026-11-09. Accessed 2026-11-09.
BibTeX
@misc{datacentersource_digital_realty_va4_bristow_va_2026,
  title = {{Digital Realty VA4}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/digital-realty-va4-bristow-va}},
  note = {Data as of 2026-11-09; accessed 2026-11-09. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
24 MW[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.Likely
Planned capacity
Not yet sourced
Building footprint
230,300 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
High confidence
Project verification
Verified operating
Operation documented by government record.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Dominion Energy · PJM
Substation: Linton Hall Substation (230 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
24 MW[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Reported
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredJul 16, 2004
    Government record
    • Jul 16, 2004 · Land acquisition / deed recorded[2]
    • Jul 16, 2004 · Deed recorded for parcel 7496-07-8757 (owner of record: Porpoise Ventures LLC Nxs# Prince-Va4).[2]
    • Nov 9, 2026 · Owner of record in county parcel data[2]
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. EnergizationNov 2, 2026
    Community map
    • Nov 2, 2026 · Power in use reported: 9.6 MW[1]
    • Nov 2, 2026 · Power in use reported: 24 MW[1]
  4. OperationalNov 2, 2026
    Community map · Government record
    • Nov 2, 2026 · Reported status: operating[1]
    • Nov 9, 2026 · County land use: Use code 191[2]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Community map.

Grid path

  1. facility
    Digital Realty VA4
  2. substation
    Linton Hall Substation (230 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.18 km away. Proximity does not establish that it serves the site.
  3. transmission
    535;2114 (500 kV)[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.82 km away). Not confirmed as the supply path.
  4. utility
    Dominion Energy[3]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[5]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates1

  • GS-5 rate class for customers demanding 25 MW or more[9]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 25, 2025.Nov 25, 2025
    Dominion Energy · Virginia State Corporation Commission · Docket PUR-2025-00058 · Final order issued · effective Jan 1, 2027

    “the new GS-5 rate class will comprise customers demanding 25 megawatts or more. The new rate class will be effective beginning January 1, 2027.”

    Applies to Dominion Energy Virginia's service territory; the facility's utility is the most likely retail provider by location unless a source names it.

Location & imagery

Mapped outline
Coordinates
38.77828, -77.59545
Address
8217 Linton Hall Road, Bristow, VA 20136[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.Likely
County
Prince William County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Utility

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Northern Virginia Elec Coop.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
24 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.Likely
Current IT capacity
10 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.Likely
Estimated annual consumption
147 GWh/yr[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 9, 2026.Speculativeestimated

24 MW × 8,760 h × 70% utilization.

Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Linton Hall Substation (230 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.2 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
500 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
9.98¢/kWh[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Aug 2026.Confirmed

Virginia statewide average, August 2026.

State avg. commercial price
11.14¢/kWh[7]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Aug 2026.Confirmed

Virginia statewide average, August 2026.

Generation within 50 km
3.11 GW[8]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

26 EIA-reported plants within 50 km.

Generation queued in county
1.35 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 9, 2026.Confirmedderived

16 active generation interconnection requests in Prince William County: Storage 1,350 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
2161 · Virginia Electric and Power CompanyTransmission line0.21 km230 kV[1]
230 kV line · Virginia Electric and Power CompanyTransmission line0.21 km230 kV[1]
535;2114 · Virginia Electric & Power CompanyTransmission line1.82 km500 kV[1]
Morrisville Sub Dominion to Loudoun Sub Dominion · Dominion EnergyTransmission line1.85 km500 kV[1]
Remington · Virginia Electric & Power CoPower plant (Natural Gas)30.2 km604 MW[8]
Potomac Energy Center, LLC · Potomac Energy Center LLCPower plant (Natural Gas)31.4 km766 MW[8]
Marsh Run Generation Facility · Old Dominion Electric CoopPower plant (Natural Gas)31.6 km481 MW[8]
Covanta Fairfax Energy · Covanta Fairfax IncPower plant (Biomass)32.1 km98 MW[8]
Possum Point · Virginia Electric & Power CoPower plant (Natural Gas)38.3 km645 MW[8]
Covanta Alexandria/Arlington Energy · Covanta Alexandria/ArlingtonPower plant (Biomass)40.5 km29 MW[8]
Montgomery County Resource Recovery · Covanta Montgomery, Inc.Power plant (Biomass)48.5 km54 MW[8]
Dickerson Power · Dickerson Power, LLCPower plant (Natural Gas)49.3 km299 MW[8]
Linton Hall Substation · NOVECSubstation0.18 km230 kV[1]
Unnamed substationSubstation0.25 km230 kV[1]
Unnamed substationSubstation1.34 km230 kV[1]
Rollins Ford Substation · Virginia Electric and Power CompanySubstation1.4 km230 kV[1]
Atlantic Substation · NOVECSubstation1.49 km230 kV[1]
Heathcote SubstationSubstation2.57 km230 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
Gainesville-Loudoun 230 kVPJM AI2-231StorageIn study · proposed 2023-10200 MW[6]
Nokesville-Vint Hill 230 kVPJM AG2-113StorageIn study · proposed 2022-08150 MW[6]
Catharpin 230 kVPJM AG2-284StorageIn study · proposed 2023-12150 MW[6]
Liberty 230 kVPJM AG2-304StorageIn study · proposed 2023-12150 MW[6]
Possum Point 230 kVPJM AG2-306StorageIn study · proposed 2023-12150 MW[6]
Possum Point 230kVPJM AH2-034StorageIn study · proposed 2028-12100 MW[6]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    Jul 16, 2004[2]
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

ParcelRecord ownerAcresZoning / useBuilding sq ftSource
7496-07-8757
Prince William County, VA
PORPOISE VENTURES LLC NXS# PRINCE-VA4
PO BOX 82612, GOLETA, CA
31.91Use code 191—[2]
Site area
31.9 acres[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 9, 2026.Confirmed

Sum of county land area across parcels.

Land use
Use code 191[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 9, 2026.Confirmed
Annual property tax
Not yet sourced

Size

Building footprint
230,300 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.Likelyderived

Computed from the mapped OSM building outline.

Parcel / land records
7496-07-8757 (Prince William County)[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Nov 9, 2026.Confirmed
Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

  1. Jul 16, 2004[2]

    Deed recorded for parcel 7496-07-8757 (owner of record: Porpoise Ventures LLC Nxs# Prince-Va4).

All claims (provenance audit)

24
FieldValueSourceConfidenceAs ofStatus
NameDigital Realty VA4way/46831933 name=Digital Realty VA4[1] Likely2026-11-02Shown
StatusOperating[1] derivedUnverified2026-11-02Shown
Facility typeColocation[1] derivedUnverified2026-11-02Shown
Address8217 Linton Hall Road, Bristow, VA 20136[1] Likely2026-11-02Shown
Property owner of recordPorpoise Ventures LLC Nxs# Prince-Va4Parcel 7496-07-8757: PORPOISE VENTURES LLC NXS# PRINCE-VA4[2] Confirmed2026-11-09Shown
OperatorDigital Realtyoperator=Digital Realty[1] Likely2026-11-02Shown
UtilityDominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE[3] derivedUnverified2022Shown
Current facility power24 MWinput:electricity=24 MW[1] Likely2026-11-02Shown
Current IT capacity10 MWit_power=9.6 MW[1] Likely2026-11-02Shown
Estimated annual consumption147 GWh/yr[4] estimatedSpeculative2026-11-09Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[5] derivedLikely—Shown
Balancing authorityPJM[3] derivedLikely—Shown
Nearest mapped substationLinton Hall Substation (230 kV)way/46831932[1] derivedLikely2026-09-28Shown
Distance to substation0.2 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby500 kV[1] derivedLikely2026-09-28Shown
Generation queued in county1.35 GW[6] derivedConfirmed2026-11-09Shown
State avg. industrial price9.98¢/kWh[7] Confirmed2026-08Shown
State avg. commercial price11.14¢/kWh[7] Confirmed2026-08Shown
Generation within 50 km3.11 GW[8] derivedConfirmed202502Shown
Building footprint230,300 sq ft[1] derivedLikely2026-11-02Shown
Site area31.9 acres[2] Confirmed2026-11-09Shown
Parcel / land records7496-07-8757 (Prince William County)[2] Confirmed2026-11-09Shown
Land useUse code 191[2] Confirmed2026-11-09Shown
Land acquiredJul 16, 2004[2] derivedConfirmed2026-11-09Shown