EdgeConneX CHI01
Part of EdgeConneX — Elk Grove Village, IL campus
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityEdgeConneX CHI01
- →substationUnnamed substation (34.5 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.31 km away. Proximity does not establish that it serves the site.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilityCommonwealth Edison (ComEd)[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 42.00078, -87.95077
- Address
- County
- Cook County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- State avg. industrial price
Illinois statewide average, July 2026.
- State avg. commercial price
Illinois statewide average, July 2026.
- Generation within 50 km
53 EIA-reported plants within 50 km.
- Generation queued in county
8 active generation interconnection requests in Cook County: Storage 908 MW, Solar + storage 44 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Mrp Elgin LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 24.3 km | 489 MW | [6] |
| Mrp Rocky Road LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 26 km | 336 MW | [6] |
| Ingredion Incorporated · Ingredion Inc - Illinois | Power plant (Natural Gas) | 27 km | 51 MW | [6] |
| University of Illinois Cogen Facility · University of Illinois | Power plant (Natural Gas) | 28.8 km | 56 MW | [6] |
| Fisk Street · Midwest Generations EME LLC | Power plant (Petroleum) | 29.7 km | 197 MW | [6] |
| Aurora · Aurora Generation LLC | Power plant (Natural Gas) | 30.8 km | 991 MW | [6] |
| Waukegan · Midwest Generations EME LLC | Power plant (Petroleum) | 44 km | 108 MW | [6] |
| Calumet Energy Team LLC · IPA Operations Inc - Calumet | Power plant (Natural Gas) | 48.1 km | 326 MW | [6] |
| Unnamed substation | Substation | 0.31 km | 34.5 kV | [1] |
| Unnamed substation | Substation | 0.77 km | 34.5 kV | [1] |
| Unnamed substation | Substation | 1.3 km | — | [1] |
| Tonne 138kV Substation · Commonwealth Edison | Substation | 2.28 km | 138 kV | [1] |
| Unnamed substation | Substation | 2.56 km | — | [1] |
| Landmeier Substation · Commonwealth Edison | Substation | 2.85 km | 138 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Calumet-Burnham 345 kVPJM AG1-298 - moved to TC1 | Storage | In study · proposed 2023-06 | 500 MW | [4] |
| Burnham 138kVPJM AF2-441 - moved to TC1 | Storage | In study · proposed 2024-05 | 200 MW | [4] |
| Chicago Heights 138kVPJM AI1-155 | Storage | In study · proposed 2027-01 | 110 MW | [4] |
| River EC 138 kVPJM AH1-663 | Storage | In study · proposed 2024-05 | 58 MW | [4] |
| Matteson - East Frankfort 138 kVPJM AH2-380 | Solar + storage | In study · proposed 2026-03 | 44 MW | [4] |
| Calumet BESSPJM AF2-031 | Storage | In study · proposed 2027-12 | 20 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
1- EdgeConneX CHI02Operating · 64,400 sq ft footprint
All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | EdgeConneX CHI01way/174242795 name=EdgeConneX CHI01 | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 1800 Nicholas Boulevard, Elk Grove Village, IL 60007 | [1] | Likely | 2026-09-27 | Shown |
| Operator | EdgeConneXoperator=EdgeConneX | [1] | Likely | 2026-09-27 | Shown |
| Utility | Commonwealth Edison (ComEd)territory 4110: COMMONWEALTH EDISON CO (INVESTOR OWNED, EXELON CORP) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (34.5 kV)way/1539869355 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.3 km | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 952 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 11.87¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 15.19¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 2.79 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 120,300 sq ft | [1] derived | Likely | 2026-09-27 | Shown |