EdgeConneX CHI02
EdgeConneX CHI02 is an operating colocation in Elk Grove Village, Illinois. Operated or owned by EdgeConneX. Planned capacity: 7 MW (announced). Verification: announced only. 7 cited sources.
Part of EdgeConneX — Elk Grove Village, IL campus
Follow
Get changes to EdgeConneX CHI02
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “EdgeConneX CHI02.” /facilities/edgeconnex-chi02-elk-grove-village-il. Data as of 2026-11-09. Accessed 2026-11-09.
@misc{datacentersource_edgeconnex_chi02_elk_grove_village_il_2026,
title = {{EdgeConneX CHI02}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/edgeconnex-chi02-elk-grove-village-il}},
note = {Data as of 2026-11-09; accessed 2026-11-09. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Company announcement, Community map.
Grid path
- →facilityEdgeConneX CHI02
- →substationUnnamed substation (34.5 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.48 km away. Proximity does not establish that it serves the site.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilityCommonwealth Edison (ComEd)[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Commonwealth Edison (ComEd). Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 42.00149, -87.95256
- Address
- 2021 Lunt Avenue, Elk Grove Village, IL 60007[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.Likely
- County
- Cook County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Planned capacity
- 7 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely
“CHIO2: 7MW N+1 Total Capacity.” — Capacity stated on the operator's facility page (facility capacity). Recorded as design capacity, not as power currently in use.
- Current facility power
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- PJM[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- PJM[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Unnamed substation (34.5 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.5 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- State avg. industrial price
- 11.33¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Aug 2026.Confirmed
Illinois statewide average, August 2026.
- State avg. commercial price
- 14.67¢/kWh[6]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Aug 2026.Confirmed
Illinois statewide average, August 2026.
- Generation within 50 km
- 2.79 GW[7]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
53 EIA-reported plants within 50 km.
- Generation queued in county
- 952 MW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 9, 2026.Confirmedderived
8 active generation interconnection requests in Cook County: Storage 908 MW, Solar + storage 44 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Mrp Elgin LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 24.1 km | 489 MW | [7] |
| Mrp Rocky Road LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 25.8 km | 336 MW | [7] |
| Ingredion Incorporated · Ingredion Inc - Illinois | Power plant (Natural Gas) | 27.1 km | 51 MW | [7] |
| University of Illinois Cogen Facility · University of Illinois | Power plant (Natural Gas) | 29 km | 56 MW | [7] |
| Fisk Street · Midwest Generations EME LLC | Power plant (Petroleum) | 29.9 km | 197 MW | [7] |
| Aurora · Aurora Generation LLC | Power plant (Natural Gas) | 30.7 km | 991 MW | [7] |
| Waukegan · Midwest Generations EME LLC | Power plant (Petroleum) | 44 km | 108 MW | [7] |
| Calumet Energy Team LLC · IPA Operations Inc - Calumet | Power plant (Natural Gas) | 48.2 km | 326 MW | [7] |
| Unnamed substation | Substation | 0.48 km | 34.5 kV | [1] |
| Unnamed substation | Substation | 0.91 km | 34.5 kV | [1] |
| Unnamed substation | Substation | 1.46 km | — | [1] |
| Tonne 138kV Substation · Commonwealth Edison | Substation | 2.16 km | 138 kV | [1] |
| Unnamed substation | Substation | 2.48 km | — | [1] |
| Landmeier Substation · Commonwealth Edison | Substation | 2.7 km | 138 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Calumet-Burnham 345 kVPJM AG1-298 - moved to TC1 | Storage | In study · proposed 2023-06 | 500 MW | [5] |
| Burnham 138kVPJM AF2-441 - moved to TC1 | Storage | In study · proposed 2024-05 | 200 MW | [5] |
| Chicago Heights 138kVPJM AI1-155 | Storage | In study · proposed 2027-01 | 110 MW | [5] |
| River EC 138 kVPJM AH1-663 | Storage | In study · proposed 2024-05 | 58 MW | [5] |
| Matteson - East Frankfort 138 kVPJM AH2-380 | Solar + storage | In study · proposed 2026-03 | 44 MW | [5] |
| Calumet BESSPJM AF2-031 | Storage | In study · proposed 2027-12 | 20 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
- Planned capacity
- 7 MW[3]AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. As of Sep 30, 2026.Likely
“CHIO2: 7MW N+1 Total Capacity.” — Capacity stated on the operator's facility page (facility capacity). Recorded as design capacity, not as power currently in use.
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- 130,600 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.Unverifiedestimated
Estimated as footprint × 2 mapped floors; gross, not leasable, area.
- Building footprint
- 65,300 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Floors
- 2[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 2, 2026.Likely
What changed (last 3 years)
Follow this facility (RSS)- Floor area128,800 sq ftSep 27, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→130,600 sq ftNov 2, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Timeline
No dated events sourced yet.
Other buildings on this campus
3- EdgeConneX CHI01Operating · 120,300 sq ft footprint
- EdgeConneX Data CenterUnder construction · 83,700 sq ft footprint
- EdgeConneX Data CenterUnder construction · 95,200 sq ft footprint
All claims (provenance audit)
19| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | EdgeConneX CHI02way/377032058 name=EdgeConneX CHI02 | [1] | Likely | 2026-11-02 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-11-02 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-11-02 | Shown |
| Website | https://www.edgeconnex.com/locations/americas/chicago-il/ | [1] | Likely | 2026-11-02 | Shown |
| Address | 2021 Lunt Avenue, Elk Grove Village, IL 60007 | [1] | Likely | 2026-11-02 | Shown |
| Operator | EdgeConneXoperator=EdgeConneX | [1] | Likely | 2026-11-02 | Shown |
| Utility | Commonwealth Edison (ComEd)territory 4110: COMMONWEALTH EDISON CO (INVESTOR OWNED, EXELON CORP) | [2] derived | Likely | 2022 | Shown |
| Planned capacity | 7 MW | [3] | Likely | 2026-09-30 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [4] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (34.5 kV)way/1539869355 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.5 km | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 952 MW | [5] derived | Confirmed | 2026-11-09 | Shown |
| State avg. industrial price | 11.33¢/kWh | [6] | Confirmed | 2026-08 | Shown |
| State avg. commercial price | 14.67¢/kWh | [6] | Confirmed | 2026-08 | Shown |
| Generation within 50 km | 2.79 GW | [7] derived | Confirmed | 202502 | Shown |
| Floor area | 130,600 sq ft | [1] estimated | Unverified | 2026-11-02 | Shown |
| Building footprint | 65,300 sq ft | [1] derived | Likely | 2026-11-02 | Shown |
| Floors | 2building:levels=2 | [1] | Likely | 2026-11-02 | Shown |