Equinix Ashburn DC18
Part of Equinix — Ashburn, VA campus
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Permitting2024
Permit / site plan
- 2024 · Permit date[7]
- 2024 · Loudoun County site plan EPLAN-2024-0193 — Approved, 161,950 sq ft proposed.[7]
- 2025 · Loudoun County site plan LEGI-2025-0027 — Active, 183,925 sq ft proposed.[7]
- Sep 27, 2026 · Site plan EPLAN-2024-0193: Approved[7]
- Sep 27, 2026 · Permit / case EPLAN-2024-0193[7]
- Sep 27, 2026 · Site plan LEGI-2025-0027: Active[7]
- Sep 27, 2026 · Permit / case LEGI-2025-0027[7]
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Permit / site plan, Community map.
Grid path
- →facilityEquinix Ashburn DC18
- →substationBeaumeade Substation (230 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.19 km away. Proximity does not establish that it serves the site.
- →transmission2143 (230 kV)[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.1 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Street address- Coordinates
- 39.02546, -77.45428
- Address
- County
- Loudoun County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Virginia statewide average, July 2026.
- State avg. commercial price
Virginia statewide average, July 2026.
- Generation within 50 km
60 EIA-reported plants within 50 km.
- Generation queued in county
11 active generation interconnection requests in Loudoun County: Storage 940 MW, Solar 100 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 2143 | Transmission line | 0.1 km | 230 kV | [1] |
| 230 kV line | Transmission line | 0.12 km | 230 kV | [1] |
| 2152;2081 · Dominion Energy | Transmission line | 0.13 km | 230 kV | [1] |
| 227;274 · Dominion Energy | Transmission line | 0.35 km | 230 kV | [1] |
| 2081 · Dominion Energy | Transmission line | 0.74 km | 230 kV | [1] |
| 2152 · Virginia Electric & Power Company | Transmission line | 0.74 km | 230 kV | [1] |
| Potomac Energy Center, LLC · Potomac Energy Center LLC | Power plant (Natural Gas) | 8.6 km | 766 MW | [6] |
| Montgomery County Resource Recovery · Covanta Montgomery, Inc. | Power plant (Biomass) | 19.5 km | 54 MW | [6] |
| Dickerson Power · Dickerson Power, LLC | Power plant (Natural Gas) | 20.5 km | 299 MW | [6] |
| Nih Cogeneration Facility · National Institutes of Health | Power plant (Natural Gas) | 31.3 km | 28 MW | [6] |
| Covanta Alexandria/Arlington Energy · Covanta Alexandria/Arlington | Power plant (Biomass) | 37.6 km | 29 MW | [6] |
| Central Utility Plant At White Oak · GSA Metropolitan Service Center | Power plant (Natural Gas) | 40.8 km | 54 MW | [6] |
| Covanta Fairfax Energy · Covanta Fairfax Inc | Power plant (Biomass) | 41.1 km | 98 MW | [6] |
| Blake Solar Plant · Horus West Virginia 1, LLC | Power plant (Solar) | 42.1 km | 80 MW | [6] |
| Beaumeade Substation · Virginia Electric & Power Company | Substation | 0.19 km | 230 kV | [1] |
| NIVO Substation · Dominion Energy | Substation | 0.63 km | 230 kV | [1] |
| Interconnection Substation · Dominion Energy | Substation | 0.75 km | 230 kV | [1] |
| Beco Substation · Dominion Energy | Substation | 1.46 km | 230 kV | [1] |
| Paragon Park Substation | Substation | 1.47 km | 230 kV | [1] |
| Nimbus Substation | Substation | 1.68 km | 230 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Loudoun 230 kVPJM AG2-285 | Storage | In study · proposed 2023-12 | 150 MW | [4] |
| Beaumeade 230 kVPJM AG2-287 | Storage | In study · proposed 2023-12 | 150 MW | [4] |
| New Road StoragePJM AE2-019 | Storage | IA signed · proposed 2026-12 | 120 MW | [4] |
| Dulles SolarPJM AF1-147 | Solar | IA signed · proposed 2023-12 | 100 MW | [4] |
| Roundtable 230 kVPJM AG2-307 | Storage | In study · proposed 2023-12 | 100 MW | [4] |
| Shelhorn 230 kVPJM AG2-323 | Storage | In study · proposed 2023-12 | 100 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting2024[7]
- Construction start—
- First operational—
- Expected completion—
- Permitting status
- Permit / case numbers
- Planned floor area
Building area proposed in the site plan.
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Planned floor area
Building area proposed in the site plan.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)Timeline
Other buildings on this campus
14- Equinix DC3Operating · 101,200 sq ft footprint
- Equinix DC10Operating · 152,600 sq ft footprint
- Equinix DC12Operating · 96,500 sq ft footprint
- Equinix DC15Operating · 76,800 sq ft footprint
- Equinix DC16Operating · 86,700 sq ft footprint
- Equinix DC17Operating · 88,000 sq ft footprint
- Equinix DC2Operating · 175,500 sq ft footprint
- Equinix DC1Operating · 59,800 sq ft footprint
- Equinix DC5Operating · 94,800 sq ft footprint
- Equinix DC11Operating · 133,100 sq ft footprint
- Equinix DC6Operating · 70,600 sq ft footprint
- Equinix DC4Operating · 101,200 sq ft footprint
- Equinix DC21Operating · 79,100 sq ft footprint
- Equinix DC22Operating · 62,100 sq ft footprint
All claims (provenance audit)
25| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Equinix Ashburn DC18node/14156477686 name=Equinix Ashburn DC18 | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 44690 Performance Circle, Ashburn, 20147 | [1] | Likely | 2026-09-27 | Shown |
| Operator | Equinixoperator=Equinix | [1] | Likely | 2026-09-27 | Shown |
| Utility | Dominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Beaumeade Substation (230 kV)way/59337974 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.2 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.04 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.64 GW | [6] derived | Confirmed | 202502 | Shown |
| Permitting status | Site plan EPLAN-2024-0193: ApprovedApplication EPLAN-2024-0193, zoning case ZRTD-2015-0003 | [7] | Confirmed | 2026-09-27 | Shown |
| Permitting status | Site plan LEGI-2025-0027: ActiveApplication LEGI-2025-0027, zoning case ZRTD-2015-0003 | [7] | Confirmed | 2026-09-27 | Superseded / alternative |
| Permit / case numbers | EPLAN-2024-0193 | [7] | Confirmed | 2026-09-27 | Shown |
| Permit / case numbers | ZRTD-2015-0003 | [7] | Confirmed | 2026-09-27 | Shown |
| Permit / case numbers | LEGI-2025-0027 | [7] | Confirmed | 2026-09-27 | Shown |
| Permit / case numbers | ZRTD-2015-0003 | [7] | Confirmed | 2026-09-27 | Shown |
| Planned floor area | 162,000 sq ft | [7] | Confirmed | 2026-09-27 | Shown |
| Planned floor area | 183,900 sq ft | [7] | Confirmed | 2026-09-27 | Superseded / alternative |
| Permit / site plan filed | 2024 | [7] derived | Confirmed | 2026-09-27 | Shown |
| Permit / site plan filed | 2025 | [7] derived | Confirmed | 2026-09-27 | Superseded / alternative |