Flexential - Richmond
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityFlexential - Richmond
- →substationNot identifiedUnknownUnverifiedNo substation mapped within 3 km and none named in filings.
- →transmissionElmont Sub Dominion to Chickahominy Sub Dominion 500KV[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.15 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 37.64689, -77.43870
- Address
- County
- Henrico County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Virginia statewide average, July 2026.
- State avg. commercial price
Virginia statewide average, July 2026.
- Generation within 50 km
26 EIA-reported plants within 50 km.
- Generation queued in county
4 active generation interconnection requests in Henrico County: Solar 20 MW, Storage 11 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 283 | Transmission line | 1.11 km | 230 kV | [1] |
| Elmont Sub Dominion to Chickahominy Sub Dominion 500KV · Dominion Energy | Transmission line | 1.15 km | 500 kV | [1] |
| Darbytown · Virginia Electric & Power Co | Power plant (Natural Gas) | 17.6 km | 340 MW | [6] |
| Doswell Energy Center · Doswell Ltd Partnership | Power plant (Natural Gas) | 19.3 km | 1.19 GW | [6] |
| Spruance Operating Services LLC · Veolia Energy Operating Service | Power plant (Natural Gas) | 21.3 km | 55 MW | [6] |
| Chesterfield · Virginia Electric & Power Co | Power plant (Natural Gas) | 29.8 km | 386 MW | [6] |
| Skipjack Solar Center · AES Distributed Energy | Power plant (Solar) | 34 km | 175 MW | [6] |
| Hopewell Cogeneration · Luminant Generation Company LLC | Power plant (Natural Gas) | 41.9 km | 378 MW | [6] |
| Scott Solar Farm · Dominion Energy Inc. | Power plant (Batteries) | 45.8 km | 57 MW | [6] |
| Ladysmith · Virginia Electric & Power Co | Power plant (Natural Gas) | 47.7 km | 814 MW | [6] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Turner 34.5 kVPJM AG2-193 | Solar | In study · proposed 2023-12 | 20 MW | [4] |
| Darbytown 230 kVPJM AH1-141 | Storage | In study · proposed 2024-12 | 5 MW | [4] |
| Darbytown 230 kV IIPJM AH1-142 | Storage | In study · proposed 2024-12 | 4 MW | [4] |
| Darbytown 230 kV IIIPJM AH1-143 | Storage | In study · proposed 2024-12 | 2 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
14| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Flexential - Richmondway/257581364 name=Flexential - Richmond | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 8851 Park Central Drive, Unit B, Richmond, VA 23227 | [1] | Likely | 2026-09-27 | Shown |
| Operator | Flexentialoperator=Flexential | [1] | Likely | 2026-09-27 | Shown |
| Utility | Dominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Highest-voltage line nearby | 500 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 31 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 3.7 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 39,800 sq ft | [1] derived | Likely | 2026-09-27 | Shown |