Part of Google — Henderson, NV campus
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityGoogle
- →substationGoogle Data Center (230 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.2 km away. Proximity does not establish that it serves the site.
- →transmission230 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.13 km away). Not confirmed as the supply path.
- →utilitySouthern California Edison[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 36.05602, -115.00852
- Address
- County
- Clark County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 4 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Nevada Power CO, Wapa-- Western Area Power Administration, Colorado River Comm of Nevada.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Nevada statewide average, July 2026.
- State avg. commercial price
Nevada statewide average, July 2026.
- Generation within 50 km
52 EIA-reported plants within 50 km.
- Generation queued in county
16 active generation interconnection requests in Clark County: Solar + storage 4,470 MW, Storage 927 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line | Transmission line | 0.13 km | 230 kV | [1] |
| 138 kV line | Transmission line | 0.28 km | 138 kV | [1] |
| 69 kV line | Transmission line | 0.38 km | 69 kV | [1] |
| Clark (Nve) · Nevada Power Co | Power plant (Natural Gas) | 5.2 km | 1.14 GW | [6] |
| Hoover Dam (Az) · U S Bureau of Reclamation | Power plant (Hydroelectric) | 24.7 km | 1.04 GW | [6] |
| Hoover Dam (Nv) · U S Bureau of Reclamation | Power plant (Hydroelectric) | 24.7 km | 1.04 GW | [6] |
| Chuck Lenzie Generating Station · Nevada Power Co | Power plant (Natural Gas) | 37.3 km | 1.24 GW | [6] |
| Silverhawk · Nevada Power Co | Power plant (Natural Gas) | 39.4 km | 1.06 GW | [6] |
| Apex Generating Station · Apex Generating Station | Power plant (Natural Gas) | 40.3 km | 524 MW | [6] |
| Harry Allen · Nevada Power Co | Power plant (Natural Gas) | 42.7 km | 654 MW | [6] |
| Gemini Solar Hybrid · Gemini Solar | Power plant (Solar) | 49.3 km | 1.07 GW | [6] |
| Google Data Center | Substation | 0.2 km | 230 kV | [1] |
| Unnamed substation | Substation | 0.25 km | 230 kV | [1] |
| Unnamed substation | Substation | 1.54 km | 138 kV | [1] |
| Unnamed substation | Substation | 1.83 km | 230 kV | [1] |
| Unnamed substation | Substation | 1.97 km | 230 kV | [1] |
| Unnamed substation | Substation | 2.02 km | 230 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| ARIDA 2 SOLAR FARMCAISO 1647 | Solar + storage | In study · proposed 2029-05 | 700 MW | [4] |
| MOSEYCAISO 2148 | Solar + storage | IA signed · proposed 2029-06 | 500 MW | [4] |
| ARIDA 3 SOLAR FARMCAISO 1795 | Solar + storage | In study · proposed 2030-07 | 450 MW | [4] |
| BONANZA PEAK SOLAR FARMCAISO 1655 | Solar + storage | IA signed · proposed 2027-12 | 400 MW | [4] |
| PURPLE SAGE ENERGY CENTERCAISO 1800 | Solar + storage | IA signed · proposed 2028-05 | 400 MW | [4] |
| ARIDA SOLAR FARMCAISO 1522 | Solar + storage | In study · proposed 2027-09 | 370 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
1- GoogleOperating · 141,500 sq ft footprint
All claims (provenance audit)
16| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Googleway/844359206 name=Google | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 540 West Warm Springs Road, Henderson, NV 89011 | [1] | Likely | 2026-09-27 | Shown |
| Operator | Googleoperator=Google | [1] | Likely | 2026-09-27 | Shown |
| Utility | Southern California Edisonterritory 17609: SOUTHERN CALIFORNIA EDISON CO (INVESTOR OWNED, SOUTHERN CALIFOR | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | CISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Google Data Center (230 kV)way/1253848635 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.2 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 5.4 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.04¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 9.72¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 11.59 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 144,200 sq ft | [1] derived | Likely | 2026-09-27 | Shown |