DC
/

Google Michigan City

UnknownUnclassifiedCampusMichigan City, LaPorte County, Indiana
20% profile completeness
9 claims from 7 sources
Current facility power
Not yet sourced
Planned capacity
300 MW[1]
Likely
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
H2 2028 – H2 2032
Low confidencewindow, not a prediction
Project verification
Announced only
Only announcements or press coverage found.
Current stage
Announced
Furthest stage with documented evidence
Utility · ISO
NIPSCO · MISO
Substation: Not identified

Power reality

Announced
300 MW[1]
Reported by Edison Electric Institute
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
  • ⚠ No grid, construction or operating record yet backs the 300 MW announced.
  • ⚠ No public interconnection record for this load — MISO does not publish large-load requests.
  • ⚠ No recorded land acquisition found.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: Announced (furthest stage with documented evidence)[1]
  • No public grid record: No interconnection request or utility contract found; adds uncertainty to the upper bound.
  • Required: 300 MW
Assumptions
  • From “Announced”, large loads have typically taken 2–5 more years to first power (editorial range; see Methodology).
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H2 2028 – H2 2032

Project verification

Development
  1. AnnouncedSep 11, 2026
    Utility filing / announcement
    • Sep 11, 2026 · Planned capacity reported: 300 MW[1]
  2. Land acquired
  3. Planning / zoning
  4. Permitting
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under construction
  3. Energization
  4. Operational

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Utility filing / announcement.

Grid path

  1. facility
    Google Michigan City
  2. substation
    Not identified
    UnknownUnverified
    No substation mapped within 3 km and none named in filings.
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    NIPSCO[1]
    DocumentedConfirmed
    Named in a source
  5. ISO / RTO
    MISO[2]
    Service territoryLikely
    Balancing authority: MISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

County-level (approximate)

Location is approximate (county-level (approximate)); the marker does not identify the exact site.

Coordinates
41.54409, -86.73972
County
LaPorte County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Google[1]Confirmed

“Google / Data Center Michigan City, IN”

Utility
NIPSCO[1]Confirmed

“Google / Data Center Michigan City, IN” Listed by EEI under this member utility.

No tenants or end users identified in our sources yet.

Power (all fields)

Planned capacity
300 MW[1]Likely

“Google / Data Center Michigan City, IN ▪ 300 MW data center project”

Current facility power
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
MISO[2]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
MISO[3]Likelyderived

Control area of the containing utility territory.

State avg. industrial price
9.16¢/kWh[5]Confirmed

Indiana statewide average, July 2026.

State avg. commercial price
13.30¢/kWh[5]Confirmed

Indiana statewide average, July 2026.

Generation within 50 km
3.82 GW[6]Confirmedderived

23 EIA-reported plants within 50 km.

Generation queued in county
1.84 GW[4]Confirmedderived

11 active generation interconnection requests in LaPorte County: Solar 674 MW, Storage 635 MW, Solar + storage 535 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Michigan City · Northern Indiana Pub Serv CoPower plant (Coal)24.1 km455 MW[6]
St Joseph Energy Center · St Joseph Energy Center LLCPower plant (Natural Gas)27.6 km715 MW[6]
Arcelormittal Burns Harbor · Cleveland-Cliffs Burns Harbor LLCPower plant (Other)34.7 km175 MW[6]
Mammoth North Solar · Mammoth North, LLCPower plant (Solar)39.3 km400 MW[6]
Dunns Bridge II Solar · Dunns Bridge II Solar and Storage Generation LLCPower plant (Solar)39.7 km491 MW[6]
R M Schahfer · Northern Indiana Pub Serv CoPower plant (Coal)43.6 km877 MW[6]
Dunns Bridge I Solar · Dunns Bridge Solar Center LLCPower plant (Solar)47 km265 MW[6]
Gary Works · United States Steel-GaryPower plant (Natural Gas)49.8 km161 MW[6]
Largest queued generation in this countyFuelQueue statusMWSource
Olive-University Park 345 kVPJM AG1-447 - moved to TC1StorageIn study · proposed 2023-12305 MW[4]
Olive-University Park 345 kVPJM AG1-436 - moved to TC1SolarIn study · proposed 2023-12250 MW[4]
Reynolds - Olive 345 kVPJM AH2-419Solar + storageIn study · proposed 2026-12210 MW[4]
New Carlisle - Bosserman 138 kVPJM AI1-078Solar + storageIn study · proposed 2026-12200 MW[4]
J1355 at Stillwell 138kV SubtationMISO J1355StorageIA signed · proposed 2023-05160 MW[7]
J1724 at LNG - STILLWELL 138kV lineMISO J1724SolarIA signed · proposed 2023-09150 MW[7]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —
Planned capacity
300 MW[1]Likely

“Google / Data Center Michigan City, IN ▪ 300 MW data center project”

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

9
FieldValueSourceConfidenceAs ofStatus
OperatorGoogle[1] Confirmed2026-09-11Shown
UtilityNIPSCO[1] Confirmed2026-09-11Shown
Planned capacity300 MW[1] Likely2026-09-11Shown
ISO / RTOMISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC..[2] derivedLikely—Shown
Balancing authorityMISO[3] derivedLikely—Shown
Generation queued in county1.84 GW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price9.16¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price13.30¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km3.82 GW[6] derivedConfirmed202502Shown